Business

Lithium Ionic Reports Significant Engineering and Commercial Progress at Bandeira

Detailed-Stage Engineering, Tendering, and Offtake Discussions Position Bandeira for Construction Readiness Amid Strengthening Lithium MarketsTORONTO, Feb. 12, 2026 (GLOBE NEWSWIRE) -- Lithium Ionic Corp. (TSXV: LTH; OTCQX: LTHCF; FSE: H3N) ("Lithium Ionic" or the "Company") is pleased to provide a development update on its 100%-owned Bandeira Lithium Project (“Bandeira” or the “Project”), located in Minas Gerais, Brazil’s globally significant “Lithium Valley”. Bandeira is Rapidly Advancing to C

articleLithium Ionic CorpFebruary 12, 20266/company/lithium-ionic/news/lithium-ionic-reports-significant-engineering-120000305
Lithium Ionic Reports Significant Engineering and Commercial Progress at Bandeira

About this update from Lithium Ionic Corp

[{"type":"image","alt":"Lithium Ionic Corp.","displaySize":"","headline":null,"caption":"Lithium Ionic Corp.","className":"","disableSlideshowImg":false,"size":{"original":{"width":300,"height":80,"url":"https://media.zenfs.com/en/globenewswire.com/4cad2d13a119def0ed596a73499193e2"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/GW0w1TUPSgNyXjlc8qM3.g--/YXBwaWQ9aGlnaGxhbmRlcjt3PTQyMDtoPTExMjtjZj13ZWJw/https://media.zenfs.com/en/globenewswire.com/4cad2d13a119def0ed596a73499193e2","width":300,"height":80}},"lazy":false},{"type":"text","content":"Detailed-Stage Engineering, Tendering, and Offtake Discussions Position Bandeira for Construction Readiness Amid Strengthening Lithium Markets","length":142,"tagName":"p"},{"type":"text","content":"TORONTO, Feb. 12, 2026 (GLOBE NEWSWIRE) -- Lithium Ionic Corp. (TSXV: LTH; OTCQX: LTHCF; FSE: H3N) ("Lithium Ionic" or the "Company") is pleased to provide a development update on its 100%-owned Bandeira Lithium Project (“Bandeira” or the “Project”), located in Minas Gerais, Brazil’s globally significant “Lithium Valley”.","length":343,"tagName":"p"},{"type":"text","content":"Bandeira is Rapidly Advancing to Construction-Ready Status","length":58,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"Overall Engineering has advanced to 48% completion since the Feasibility Study (the “Study”) press release from September 17, 2025.","length":131,"tagName":"p"}]},{"val":[{"type":"text","content":"Basic engineering complete on major design packages including plant engineering and primary civil engineering.","length":110,"tagName":"p"}]},{"val":[{"type":"text","content":"Detailed engineering on raw water and drainage is in the final stage. ","length":69,"tagName":"p"}]},{"val":[{"type":"text","content":"Infrastructure and long-lead tenders are now being deployed as per the Project schedule.","length":88,"tagName":"p"}]},{"val":[{"type":"text","content":"Commercial momentum is accelerating as the Company has received multiple offtake and debt-financing term sheets and is advancing towards binding agreement(s).","length":158,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":556,"olType":false},{"type":"text","content":"Blake Hylands, P.Geo., CEO of Lithium Ionic, commented, “Bandeira is now firmly in the execution phase. With a technically robust and optimized Feasibility St...

More updates from Lithium Ionic Corp

Lithium IonicBandeira Lithium ProjectLithium Ionic Corp.civil engineeringBandeiradetailed engineeringplant engineeringThe CompanyBandeira ProjectBlake HylandsEngineeringLithium Valley