Business
Stellar Africagold Updates Ongoing Exploration and Drilling Activities at the Tichka Est Gold Project, Morocco
(TheNewswire) Vancouver, BC – TheNewswire - December 2, 2025 Stellar Afr...

About this update from Stellar Africagold, Inc.
[{"type":"text","content":"Stellar Africagold Updates Ongoing Exploration and Drilling Activities at the Tichka Est Gold Project, Morocco\n\n\n (TheNewswire)\n \n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n Vancouver, BC –\n \n\n TheNewswire\n-\n \n\n December 2, 2025\n \n\n Stellar AfricaGold Inc.\n \n\n (“Stellar” or the “Company”) is pleased to provide\nan update on the exploration and drilling program at Tichka Est Gold\nProject in the High Atlas of Morocco.\n \n\n\n\n\n\n 1.\nDrilling Program Progress\n \n\n\n\n Summary of drilling progress to\ndate:\n \n\n\n\n\n\n 7 diamond drill holes completed, totaling 1,218\nmetres\n \n\n\n\n\n\n Average drilling rate of 11 meters per day\n \n\n\n\n\n\n Drill progress suffered minor adverse impacts caused\nby:\n \n\n\n\n\n\n intermittent wet weather events impacting access roads\nand drill pad degradation requiring limited remediation,\n \n\n\n\n\n\n cementing of fractured zones in certain drill holes,\nand\n \n\n\n\n\n\n minor mechanical delays\n \n\n\n\n\n\n\n\n Status of drill holes:\n \n\n\n\n\n\n 3 drill holes have been fully assayed, including TCK1\n(See\n \n\n\n news release October 2,\n2025\n \n\n\n for details of TCK1 assay results),\n \n\n which intersected multiple gold-bearing\nintervals (\n \n\n 13 meters of 6.12\ng/t Au\n \n\n including\n \n\n 2 meters of 22.28 g/t Au\n \n\n , and\n \n\n 16 meters of\n1.98 g/t Au\n \n\n including\n \n\n 1 meter of 11.55 g/t Au)\n \n\n and confirmed that mineralization continues more than 100\nmetres beyond the nearest high-grade trench\n \n\n\n\n\n\n 3 drill holes have been sampled and are currently at\nAfrilab, an ISO-certified laboratory in Marrakech, for\nanalysis.\n \n\n\n\n\n\n 1 drill hole is pending transport from Tichka Est\nproject site to Afrilab for analysis.\n \n\n\n\n\n\n 2 final drill holes remain and will complete the\ncurrent 1,500 meters drill program.\n \n\n\n\n\n\n All pending assays results will be released once they\nare received, validated, compiled, analysed and integrated into the\ngeological working model.\n \n\n\n\n Geological Context\n \n\n\n\n The current drill campaign was designed to test several\ngeological targets within Zone B, a structurally favorable domain\nsituated at the intersection of two major regional fault\nsystems:\n \n\n\n\n\n\n Tizgui Fault Zone (NE-striking) and\n \n\n\n\n\n\n Arg-Erdouz Fault Zone...