Business

Stellar AfricaGold Intersects Multiple Gold-Bearing Zones and Confirms Structural Controls at Tichka Est, Morocco - Drilling Resumed on January 30, 2026

(TheNewswire) Vancouver, BC – TheNewswire - February 3 rd , 2026 &#x201...

articleStellar Africagold, Inc.February 3, 20263/company/lalondejfstellarafricagoldcoms-org/news/stellar-africagold-intersects-multiple-gold-bearing-zones-and-confirms-structural-controls-at-tichka-est-morocco-drilling-resumed-on-january-30-2026
Stellar AfricaGold Intersects Multiple Gold-Bearing Zones and Confirms Structural Controls at Tichka Est, Morocco - Drilling Resumed on January 30, 2026

About this update from Stellar Africagold, Inc.

[{"type":"text","content":"Stellar AfricaGold Intersects Multiple Gold-Bearing Zones and Confirms Structural Controls at Tichka Est, Morocco - Drilling Resumed on January 30, 2026\n(TheNewswire)\n\n\n\n\n\nVancouver, BC – TheNewswire - February 3rd, 2026 – Stellar\nAfricaGold Inc. (“Stellar” or the “Company”) (TSX-V: SPX |\nFSE: 6YP | TGAT: 6YP) is pleased to report additional assay results\nand an updated interpretation from its ongoing diamond drilling\nprogram at the Tichka Est Gold Project, located in the High Atlas\nMountains of Morocco.\n\n\nResults received to date confirm the presence of a\nstructurally controlled orogenic gold system, with gold mineralization\npreferentially hosted within fractured diorite sills and associated\ncarbonate-altered zones linked to secondary shear structures. These\nresults materially advance the Company’s geological understanding of\nthe project and provide a clear framework for follow-up\ndrilling.\n\n\nAssay results for two completed drill holes remain\npending and will be released once received and validated. Following a\ntemporary interruption due to unusually severe winter weather, diamond\ndrilling resumed on January 30th, 2026, with at\nleast two additional drill holes planned.\n\n\nHighlights – Diamond Drilling\n\n\n\n\nMultiple gold-bearing\nzones intersected across several drill holes, confirming the presence and continuity of mineralization\nbeyond the initial discovery hole TCK_001 \n\n\n\nBest new intercept : \n\n\n\n\nTCK_006: 6.0m @\n3.81g/t Au from 69 m,  \n\n\n\nhighlights the development of higher-grade\nmineralization within stacked horizons \n\n\n\n\n\nResults support a refined structural model, with gold preferentially concentrated in competent host rocks\naffected by secondary shearing \n\n\n\nDrilling resumed on\nJanuary 30th, 2026, targeting extensions of known mineralization and additional\nnear-surface targets identified through mapping and trenching \n\n\n\n\nGold intercepts from drill hole TCK_001, including\n13.0m @ 6.12g/t Au\nat 0.1g/t Cut-off grade, were reported\npreviously (see Company news\nrelease dated January 8, 2026).\n\n\nUpdated Composite Drill Intercepts (0.20g/t Au Cut-off)\n\n\nThe Company has recalculated composite gold\nintersections for all drill holes completed to date using a 0.20g/t...

More updates from Stellar Africagold, Inc.