Business

LaFleur Minerals Files PEA Technical Report Supporting Restart of Gold Production at Beacon Gold Mill, Québec

Vancouver, British Columbia--(Newsfile Corp. - March 27, 2026) - LaFleur Minerals Inc. (CSE: LFLR) (OTCQB: LFLRF) (FSE: 3WK0) ("LaFleur Minerals" or the "Company") is pleased to announce the filing of an independent technical report (the "Report"), prepared in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101"), supporting the results of the Preliminary Economic Assessment ("PEA") for the Company's 100%-owned Swanson Gold Deposit and Beacon...

articleLafleur Minerals Inc.March 27, 20266/company/lafleur-minerals-inc/news/lafleur-minerals-files-pea-technical-report-supporting-restart-of-gold-production-at-beacon-gold-mill-quebec
LaFleur Minerals Files PEA Technical Report Supporting Restart of Gold Production at Beacon Gold Mill, Québec

About this update from Lafleur Minerals Inc.

[{"type":"text","content":"Vancouver, British Columbia--(Newsfile Corp. - March 27, 2026) - LaFleur Minerals Inc. (CSE: LFLR) (OTCQB: LFLRF) (FSE: 3WK0) ("LaFleur Minerals" or the "Company") is pleased to announce the filing of an independent technical report (the "Report"), prepared in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101"), supporting the results of the Preliminary Economic Assessment ("PEA") for the Company's 100%-owned Swanson Gold Deposit and Beacon Gold Mill, located in the Abitibi Gold Belt of Québec (the "Project").","length":631,"tagName":"p"},{"type":"text","content":"The Report, titled "Swanson Gold Project - Preliminary Economic Assessment of Delivering Swanson Deposit Mineralized Material to the Beacon Mill Located in Val-d'Or, Québec", is dated March 27, 2026, with an effective date of March 16, 2026, and was prepared for LaFleur Minerals by ERM Consultants Canada Ltd. ("ERM"). The Report is available on the Company's website at www.lafleurminerals.com and under the Company's issuer profile on SEDAR+ at www.sedarplus.ca.","length":497,"tagName":"p"},{"type":"text","content":"PEA Supporting Beacon Mill Restart and Swanson Development","length":58,"tagName":"p"},{"type":"text","content":"Independent Qualified Persons ("QPs") from ERM were responsible for the preparation of the PEA technical report, including overall coordination, property description and location, accessibility, project history, mineral processing and metallurgical testing, mineral resource estimation, mining and recovery methods, infrastructure, operating and capital cost estimates, economic analysis, and project execution planning.","length":430,"tagName":"p"},{"type":"text","content":"Readers are advised to review the technical report in its entirety, including all qualifications, assumptions, exclusions, and risks. The report is intended to be read as a whole, and sections should not be considered in isolation.","length":231,"tagName":"p"},{"type":"text","content":"The PEA outlines a development scenario supporting the restart of gold production at the Company's fully permitted Beacon Gold Mill, utilizing mineralized material from the nearby Swanson Gold Deposit as part of a vertically integrated mine...

More updates from Lafleur Minerals Inc.

Gold DepositPEAThe Companytechnical reportAbitibi Gold BeltLaFleur MineralsCompany