Sports

Kingfisher Metals Reports 889.35 meters of 0.47% CuEq and 721.7 meters of 0.46% CuEq from surface at Williams, HWY 37 Project, Golden Triangle, British Columbia

VANCOUVER, BC / ACCESS Newswire / January 13, 2026 / Kingfisher Metals Corp. (TSXV:KFR)(FSE:970)(OTCQB:KGFMF) ("Kingfisher" or the "Company") is pleased to announce further results from the 2025 exploration and drilling program at the HWY 37 Project. ...

articleKingfisher PlcJanuary 13, 202610/company/kingfisher-plc/news/kingfisher-metals-reports-88935-meters-of-047percent-cueq-and-7217-meters-of-046percent-cueq-from-surface-at-williams-hwy-37-project-golden-triangle-british-columbia-1
Kingfisher Metals Reports 889.35 meters of 0.47% CuEq and 721.7 meters of 0.46% CuEq from surface at Williams, HWY 37 Project, Golden Triangle, British Columbia

About this update from Kingfisher Plc

[{"type":"text","content":"VANCOUVER, BC / ACCESS Newswire / January 13, 2026 / Kingfisher Metals Corp. (TSXV:KFR)(FSE:970)(OTCQB:KGFMF) ("Kingfisher" or the "Company") is pleased to announce further results from the 2025 exploration and drilling program at the HWY 37 Project. The 933 km 2 HWY 37 Project is located within the Golden Triangle, British Columbia.","length":355,"tagName":"p"},{"type":"text","content":"Assay results have been received for an additional three diamond drill holes HW-25-008, -009, and -010. Diamond drill holes HW-25-008 and -010 returned some of the longest copper intercepts from within the Williams porphyry copper-gold system. HW-25-008 cut 889.35 m 1 of 0.47% CuEq 2 starting at surface below 3.65 m of cover to end of hole at 893 m (Figure 4) . Drillhole HW-25-010 returned 721.7 m of 0.46% CuEq starting below 4.3 m of cover which includes 78.7 m of 1.01% CuEq from 4.3 m depth (Figure 7). These drillholes demonstrate continuity of grade with mineralization from surface of bedrock to depth within the Williams deposit.","length":640,"tagName":"p"},{"type":"text","content":"Highlights from this release include:","length":37,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"HW-25-008 (Williams): 889.35 m of 0.47% CuEq from 3.65 m","length":56,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"Including 40.15 m at 1.16% CuEq from 287.95 m","length":45,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":45,"olType":false}]},{"val":[{"type":"text","content":"HW25-010 (Williams): 721.7 m of 0.46% CuEq from 4.3 m","length":53,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"Including 78.7 m of 1.01% CuEq from 4.3 m","length":41,"tagName":"p"}]},{"val":[{"type":"text","content":"Including 47.55 m of 1.12% CuEq from 273.0 m","length":44,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":85,"olType":false}]}],"tagName":"ul","bulletedList":true,"length":239,"olType":false},{"type":"text","content":""The Williams drilling continues to demonstrate a well-mineralized porphyry system with copper-gold mineralization extending from surface over long intervals," said Dustin Perry, CEO of Kingfisher. "While Williams is interpreted as a satellite to a larger porphyry system at Hank, the presence of bornite and localized higher-g...

More updates from Kingfisher Plc

The WilliamsBritish ColumbiaKingfisherWilliamsdrill holediamond drill holes