Business
Sitka Deepens Winter Drill Hole and Intersects 65.0 Metres of 2.00 g/t Gold, Including 6.3 Metres of 5.53 g/t Gold; Mobilizes Fourth Drill Rig to the Rhosgobel Target at Its RC Gold Project, Yukon
Extension of DDRCCC-25-076 confirms significant gold mineralization continues for over one kilome...

About this update from Sitka Gold Corp.
[{"type":"text","content":"Sitka Deepens Winter Drill Hole and Intersects 65.0 Metres of 2.00 g/t Gold, Including 6.3 Metres of 5.53 g/t Gold; Mobilizes Fourth Drill Rig to the Rhosgobel Target at Its RC Gold Project, YukonExtension of DDRCCC-25-076 confirms significant gold mineralization continues for over one kilometre from surface at the Blackjack deposit and confirms the potential for an underground mining component to the depositFourth drill rig mobilizing to the Rhosgobel target where up to 10,000 m of drilling is planned to follow up on discovery drill holes announce last fallFirst ever visible gold observed in drill core from the Saddle zone where drilling is currently testing a possible linkage between the Blackjack and Eiger gold deposits 30,000 metre drill program rapidly advancing with 17 holes totalling approximately 6,127 metres completed to date within the Blackjack-Saddle-Eiger areaVancouver, British Columbia--(Newsfile Corp. - June 11, 2025) - Sitka Gold Corp. (TSXV: SIG) (FSE: 1RF) (OTCQB: SITKF) (\"Sitka\" or the \"Company\") is pleased to announce initial assay results from its 2025 summer drill program currently underway at its 100% owned RC Gold Project located in Yukon's prolific Tombstone Gold Belt (see Figure 6). Results received from the extension of DDRCCC-25-076, which was initially completed to a depth of 810.8 metres during winter drilling earlier this year (see news release dated May 8, 2025) and subsequently extended to 944.9 metres, returned 65.0 m of 2.00 g/t gold from 806.0 metres, which includes two higher grade intervals of 8.0 m of 4.80 g/t gold and 6.26 m of 5.53 g/t gold (see Table 1). The Company is also pleased to announce that a fourth drill rig is being mobilized to the Rhosgobel intrusion target where up to 10,000 metres of drilling is proposed to build upon the discovery hole from last year that returned 164.8 metres of 0.82 g/t gold starting 9 metres from surface, including 119.0 metres of 1.05 g/t gold, 37.9 metres of 2.05 g/t gold and 11.5 metres of 4.32 g/t gold (see news release dated November 25, 2025). In addition, the Company is pleased to announce that visible gold has been observed for the first time ever in drill core from the Saddle zone. Three drill rigs are currently turning at the Blackjack, Saddle and Eiger zones (see Figure 6) as part of a fully funded, 30,000 metre drill campaign p...