Business

Montage Gold announces grade control results and resource increase for its Koné and Gbongogo Main deposits at its Koné Project

HIGHLIGHTS:  174,000 meters of exploration and grade control drilling conducted in 2025...

articleMontage Gold Corp.March 30, 20263/company/jcainmontagegoldcoms-org/news/montage-gold-announces-grade-control-results-and-resource-increase-for-its-konandxe9-and-gbongogo-main-deposits-at-its-konandxe9-project
Montage Gold announces grade control results and resource increase for its Koné and Gbongogo Main deposits at its Koné Project

About this update from Montage Gold Corp.

[{"type":"text","content":"Montage Gold announces grade control results and resource increase for its Koné and Gbongogo Main deposits at its Koné Project\nHIGHLIGHTS:  174,000 meters of exploration and grade control drilling conducted in 2025, with 36% directed towards the Koné and Gbongogo Main deposits, in addition to delineating new higher-grade satellites 59,873m of grade control and exploration drilling completed on the Koné deposit in 2025, increasing the total drilling conducted on the deposit to 171,050m compared to 100,249m prior to the 2024 Updated Feasibility Study (“UFS”)7,292m of infill drilling and exploration drilling completed on the Gbongogo Main deposit since the beginning of 2025, increasing the total drilling conducted on the deposit to 32,002m compared to 18,276m prior to the 2024 UFS In-fill and step-out drilling at the Koné and Gbongogo Main deposits resulted in better definition of higher-grade areas while improving the continuity and extension of the mineralization: Koné deposit M&I Resources increased by 142koz to 4.63Moz while grade increased by 21% to 0.69 g/t Au and Inferred Resources increased by 749koz to 1.26Moz while grade increased by 21% to 0.52 g/t Au, over last year; Koné deposit maiden Measured Resources of 229koz at 0.83 g/t Au demonstrates higher resource confidence levelGbongogo Main deposit Indicated Resources increased by 223koz to 783koz while grade increased by 3% to 1.51 g/t Au and Inferred Resources increased by 39koz to 41koz while grade increased by 21% to 1.08 g/t Au, over last year Koné project overall M&I Resources increased by 671koz to 5.88Moz while the grade increased by 24% to 0.77 g/t Au and Inferred Resources increased by 782koz to 1.56Moz while the grade increased by 7% to 0.58 g/t Au, over last year, inclusive of resources for additional satellites published last year Indicated and Inferred Resources for higher grade satellite deposits now stand at 1.25Moz at 1.34 g/t Au and 303koz at 1.07 g/t Au, respectively, highlighting the effectiveness of the exploration programmeUpdated resources for satellite deposits, including Gbongogo South, Koban North, ANV, Yere North, Lokolo Main, Sena and Diouma North are expected to be published in the coming weeks, while maiden resources for new discoveries, such as Petit Yao and Soman 1 & 2, ...

More updates from Montage Gold Corp.