Business
Purepoint Commences 2026 Drilling Program At Dorado Following Nova Uranium Discovery
Toronto, Ontario--(Newsfile Corp. - January 26, 2026) - Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) today announced that drilling has commenced at the Dorado Project as part of the Purepoint and IsoEnergy Ltd. joint venture, marking the start of a focused winter program designed to expand the high-grade Nova Uranium Discovery and advance additional priority targets across the property.The winter drill program represents the first phase of a fully approved multi campaign exploration..
About this update from Isoenergy Ltd.
[{"type":"text","content":"Toronto, Ontario--(Newsfile Corp. - January 26, 2026) - Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) today announced that drilling has commenced at the Dorado Project as part of the Purepoint and IsoEnergy Ltd. joint venture, marking the start of a focused winter program designed to expand the high-grade Nova Uranium Discovery and advance additional priority targets across the property.","length":400,"tagName":"p"},{"type":"text","content":"The winter drill program represents the first phase of a fully approved multi campaign exploration program at Dorado and is a direct follow up to the 2025 Nova Discovery, which returned uranium grades of up to 8.1% U₃O₈ over 0.4 metre within 2.1 metres of 1.6% U₃O₈ in hole PG25 07A. Drilling will focus on systematic step-outs along the steeply dipping mineralized structure, which remains open in all directions.","length":414,"tagName":"p"},{"type":"text","content":""The decision to aggressively advance drilling at Dorado this year reflects both the strength of the Nova Discovery and the joint venture's confidence in its growth potential," said Chris Frostad, President & CEO of Purepoint Uranium Group. "Nova has delivered increasing uranium grades as we step-out and has quickly emerged as a priority discovery within our portfolio. The current drill program is designed to test scale, continuity, and the broader structural corridor that hosts the uranium mineralization."","length":540,"tagName":"p"},{"type":"text","content":"Highlights","length":10,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"Drilling has commenced on the 2026 winter exploration program at the Dorado Project following the high-grade Nova Discovery","length":123,"tagName":"p"}]},{"val":[{"type":"text","content":"Winter program includes up to 10 drill holes totaling approximately 4,300 metres focused on expanding Nova","length":106,"tagName":"p"}]},{"val":[{"type":"text","content":"Drilling will target the corridor between holes PG25-03 and PG25-07A, an 800-metre strike length with strongest mineralization currently toward the northeast","length":157,"tagName":"p"}]},{"val":[{"type":"text","content":"The Nova mineralized structure remains open along strike and at depth","length":69,"tagName":"p"}]},{"val":[{"type":"text","content":"Winter access and drill pad const...