Business

Inventus Continues Expanding Flat Surface Gold Mineralization at the Pardo "River of Gold" Project

TORONTO, ON / ACCESS Newswire / January 22, 2026 / Inventus Mining Corp. (TSXV:IVS) ("Invent...

articleInventus Mining Corp.January 22, 20264/company/inventus-mining-corp/news/inventus-continues-expanding-flat-surface-gold-mineralization-at-the-pardo-river-of-gold-project
Inventus Continues Expanding Flat Surface Gold Mineralization at the Pardo "River of Gold" Project

About this update from Inventus Mining Corp.

[{"type":"text","content":"Inventus Continues Expanding Flat Surface Gold Mineralization at the Pardo \"River of Gold\" ProjectTORONTO, ON / ACCESS Newswire / January 22, 2026 / Inventus Mining Corp. (TSXV:IVS) (\"Inventus\" or the \"Company\")is pleased to provide recent drilling results at its 100%-owned Pardo \"River of Gold\" Project, located 65 km northeast of Sudbury, Ontario.HighlightsPhase 2 drilling expands flat surface gold mineralization with highlights of:6.1 gpt gold over 1.58 m4.6 gpt gold over 1.50 m4.4 gpt gold over 1.81 mGrade-control drilling defines additional bulk sample site with highlights of:5.6 gpt gold over 1.47 m4.7 gpt gold over 1.60 m4.3 gpt gold over 1.72 mDrilling is ongoing with results pending from 40 holes:26 holes completed in 202614 holes completed at the end of 202510,128-tonne Trench 1 bulk sampling processing scheduled to begin January 27th, 202610,000-tonne Trench 1 North bulk sample extraction underwayWhy this matters for InvestorsDrilling and bulk sampling at Pardo are advancing multiple value-creation milestones in parallel. These programs are focused on delivering an initial resource estimate, with drilling confirming continuity of gold mineralization and bulk sampling validating grades, providing a glimpse at mine feasibility, and generating operational cash flow to further de-risk the project. Near-term catalysts include additional drill results, bulk sample processing results, and technical studies including heap-leach processing and ore-sorting.Drilling UpdatePhase 2 drilling continues to expand the flat and shallow gold mineralization to the West and North at depths of 4 to 30 metres with intersections of 6.1 gpt gold over 1.58 metres, 4.6 gpt gold over 1.5 metres and 4.4 gpt gold over 1.81 metres (Figure 1). A total of 68 drill holes are reported for 1,401 metres of drilling with result highlights provided in Table 1 and drill hole details in Table 2. Drilling is now focused on the southeast to continue testing the lateral continuity of gold mineralization (Figure 1).Phase 2 drilling is conducted at 30- to 60-metre step-outs to identify and confirm gold mineralization within the target layer. Subsequent infill drilling at 15-metre spacing will be used to better define the gold grade, and lastly, grade-control drilling is completed at 7.5-metre centres prior to extraction. This staged drilling approach is di...

More updates from Inventus Mining Corp.