Business

Indonesia Energy Announces That Operations On The First of Two New Wells To Be Drilled at Kruh Block Have Commenced

Comments Made During Company Presentation at H.C. Wainwright Conference JAKARTA, INDONESIA AND DANVILLE, CA, Sept. 09, 2025 (GLOBE NEWSWIRE) -- Indonesia Energy Corporation (NYSE American: INDO) ("IEC"), an oil and gas exploration and production company focused on Indonesia, today announced its President, Frank Ingriselli, during his presentation at the H.C. Wainwright 27th Annual Global Investment Conference on Tuesday, September 9, 2025 at 12:00 p.m. EST confirmed that operations on the first

articleIndonesia Energy Corporation LimitedSeptember 9, 20254/company/indonesia-energy-corporation-limited/news/indonesia-energy-announces-that-operations-on-the-first-of-two-new-wells-to-be-drilled-at-kruh-block-have-commenced
Indonesia Energy Announces That Operations On The First of Two New Wells To Be Drilled at Kruh Block Have Commenced

About this update from Indonesia Energy Corporation Limited

[{"type":"image","alt":"Indonesia Energy Corporation Limited","displaySize":"","headline":null,"caption":"Indonesia Energy Corporation Limited","className":"","disableSlideshowImg":false,"size":{"original":{"width":300,"height":115,"url":"https://media.zenfs.com/en/globenewswire.com/c3bb43e87e71b16b804ddeb4045797c0"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/OCWDqXKMzbQCx9mRDJlQyQ--/YXBwaWQ9aGlnaGxhbmRlcjt3PTQyMDtoPTE2MTtjZj13ZWJw/https://media.zenfs.com/en/globenewswire.com/c3bb43e87e71b16b804ddeb4045797c0","width":300,"height":115}},"lazy":false},{"type":"text","content":"Comments Made During Company Presentation at H.C. Wainwright Conference","length":71,"tagName":"p"},{"type":"text","content":"JAKARTA, INDONESIA AND DANVILLE, CA, Sept. 09, 2025 (GLOBE NEWSWIRE) -- Indonesia Energy Corporation (NYSE American: INDO) ("IEC"), an oil and gas exploration and production company focused on Indonesia, today announced its President, Frank Ingriselli, during his presentation at the H.C. Wainwright 27th Annual Global Investment Conference on Tuesday, September 9, 2025 at 12:00 p.m. EST confirmed that operations on the first of its planned next two (2) wells at IEC’s Kruh Block have commenced.","length":517,"tagName":"p"},{"type":"text","content":"A drilling pad for the next well (called the “K-29” well) has been constructed and drilling pipe has been delivered. IEC’s website has been updated with a company presentation and a slide showing photographs of these items: https://ir.indo-energy.com/wp-content/uploads/2025/09/INDONESIA-ENERGY-presentation-September-2025-added-photos.pdf","length":339,"tagName":"p"},{"type":"text","content":"The entire conference presentation will also be available for replay next week at IEC’s website at: https://ir.indo-energy.com","length":126,"tagName":"p"},{"type":"text","content":"Mr. Frank Ingriselli, IEC's President, commented "We are excited that we have commenced operations for drilling the first of 2 wells planned on our 63,000-acre Kruh Block with the drilling pad for well K-29 being constructed and pipe delivered. We are now awaiting government approvals to our tender offers for the drilling rig and other large components to commence drilling. We will keep the marketplace updated as we embark on this exciting period for our company. We believe we have world class assets in Indonesia th...

More updates from Indonesia Energy Corporation Limited

IndonesiaFrank Ingrisellidrilling rigconference presentationJAKARTA, INDONESIAdrilling pipeForward-Looking StatementsKruh BlockEnergy Corporation