Business
Helium One Global Ltd Announces Jackson-2 Flow Test Results & Gas Analysis Update
LONDON, GB / ACCESS Newswire / May 15, 2025 / Helium One Global (AIM:HE1), the primary helium explorer in Tanzania with a 50% working interest in the Galactica-Pegasus helium development project in Colorado, USA ("the Galactica Project"), provides ...
About this update from Helium One Global Limited
[{"type":"text","content":"LONDON, GB / ACCESS Newswire / May 15, 2025 / Helium One Global (AIM:HE1), the primary helium explorer in Tanzania with a 50% working interest in the Galactica-Pegasus helium development project in Colorado, USA ("the Galactica Project"), provides an update following the Blue Star Helium (ASX: BNL) ("Blue Star") announcement issued today regarding the Galactica Project.","length":392,"tagName":"p"},{"type":"text","content":"Highlights","length":10,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"Jackson-2 flowed naturally during drilling and at Total Depth ("TD")","length":78,"tagName":"p"}]},{"val":[{"type":"text","content":"Flow rate since TD has increased to over 250 thousand cubic feet per day ("Mcfd")","length":91,"tagName":"p"}]},{"val":[{"type":"text","content":"Projected Stabilised Flow Rates are 300 Mcfd to 400 Mcfd constrained to optimise production, with a maximum potential rate of 500 Mcfd","length":134,"tagName":"p"}]},{"val":[{"type":"text","content":"Early samples return helium concentration of up to 1.22% (air-corrected) and 77.77% CO2","length":87,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":390,"olType":false},{"type":"text","content":"Details","length":7,"tagName":"p"},{"type":"text","content":"The Jackson-2 well reached TD at 1,232 feet (376m) within the Upper Lyons Formation, encountering the Lyons Sandstone Formation at 1,159 feet (353m). As expected, no water was encountered during drilling of the Lyons Formation with wireline logs confirming the penetrated Lyons Sandstone Formation to be high-quality and gas saturated.","length":335,"tagName":"p"},{"type":"text","content":"Flow testing since TD has revealed increasing natural flow rates, reaching approximately 250 Mcfd to-date. Strong pressure build-up post-testing indicates high permeability and good reservoir communication. Based on the previous engineering study described below, and the observed flow rates, the projected stabilised flow rates constrained for production optimisation are expected to be between 300 Mcfd to 400 Mcfd, with a maximum of 500 Mcfd.","length":445,"tagName":"p"},{"type":"text","content":"Initial laboratory analysis of gas samples from Jackson-2 showed a helium concentration up to 1.22% (air-corrected) and 77.77% CO2 (and 20.61% nitrogen). The well h...