Originaltext
Diese Übersetzung bewerten
Mit deinem Feedback können wir Google Übersetzer weiter verbessern
Home
Fortuna Silver Mines Inc
Fortuna Establishes Presence in the Guyana Shield Through Quartzstone Earn-In Agreement
Sports
Apr 20 2026
17 min read

Fortuna Establishes Presence in the Guyana Shield Through Quartzstone Earn-In Agreement

news images

VANCOUVER, British Columbia, April 20, 2026 (GLOBE NEWSWIRE) -- Fortuna Mining Corp. (NYSE: FSM | TSX: FVI) is pleased to announce it has entered into an earn-in agreement with Qstone Inc., a private Guyanese company, pursuant to which Fortuna may earn up to a 70% interest in the Quartzstone Project, a large land package comprising 29,600 hectares located in the greenstone belt of north central Guyana.

Jorge A. Ganoza, President and CEO of Fortuna, commented, “We are excited to establish a presence in the Guyana Shield, a highly prospective region with a strong history of gold discoveries.” Mr. Ganoza continued, “The Quartzstone Project, where historical drilling has identified multiple high grade zones of near-surface gold mineralization, is located in a prolific exploration camp, and this transaction provides Fortuna with a staged path to unlock its potential through systematic exploration and drilling.”

Previous Drill Highlights

A total of 183 diamond core drill holes, comprising 23,190 meters, were completed between 2010 and 2017. Drilling along a five-kilometer corridor identified multiple zones of high grade near-surface gold mineralization. Drill highlights include:

DQS-016:

27.78 g/t Au
41.10 g/t Au
89.90 g/t Au

over a width of 5.6 meters from 23.0 meters, including
over a width of 1.1 meters from 25.6 meters and
over a width of 1.0 meter from 26.7 meters

DQS-043:

4.31 g/t Au
15.58 g/t Au
12.45 g/t Au

over a width of 12.7 meters from 42.7 meters, including
over a width of 1.6 meters from 44.6 meters and
over a width of 1.3 meters from 54.1 meters

DQS-052:

12.65 g/t Au

over a width of 4.0 meters from 51.6 meters

DQS-057:

15.93 g/t Au
74.72 g/t Au
81.96 g/t Au

over a width of 13.2 meters from 92.2 meters, including
over a width of 1.0 meter from 94.9 meters and
over a width of 1.0 meter from 95.9 meters

DQS-070:

10.13 g/t Au
19.33 g/t Au
16.63 g/t Au

over a width of 5.0 meters from 105 meters, including
over a width of 2.0 meters from 105 meters, and
over a width of 1.0 meter from 108 meters

DQS-071:

10.82 g/t Au
37.84 g/t Au

over a width of 6.7 meters from 89.2 meters, including
over a width of 0.8 meters from 94.2 meters

DQS-088:

9.91 g/t Au
101.58 g/t Au

over a width of 13.1 meters from 242.7 meters, including
over a width of 1.0 meter from 246.7 meters

 

 

 

Refer to Appendix 1 for full details of the drill holes and assay results for this historical program.

Project location and geological setting

Figure 1: Location of Quartzstone Project, Guyana

Figure 1: Location of Quartzstone Project, Guyana

The Quartzstone Project is located approximately 120 kilometers west of Georgetown and 35 kilometers northwest of G Mining’s Oko West project (refer to Figure 1). The Project hosts an orogenic gold system along the contact between a granitoid complex and Lower Proterozoic greenstone rocks within the Guyana Shield, a geological setting known for significant gold deposits.

Local geology comprises granitoids, metavolcanic, and metasedimentary rocks, cut by a west-dipping, north-south striking thrust and shear zone that extends over 26 kilometers. Gold mineralization is hosted in quartz-tourmaline-carbonate veins and breccias within a high-strain corridor up to 100 meters wide along the principal north-south shear and associated northeast-trending structures. Drilling to date has tested only approximately 5 kilometers of the 26 kilometer shear zone within the concession area. Several geochemical anomalies along northeast-southwest trending cross-structures also remain untested and will be prioritized by the exploration program.

Planned Exploration

Fortuna’s initial exploration program, budgeted at approximately US$5.5 million, will focus on advancing priority targets already defined at Quartzstone, while generating additional targets along the highly prospective 26 kilometer main shear zone. Planned work includes airborne magnetic surveys to develop a detailed structural framework, supported by high-resolution satellite imagery and digital elevation modelling. Field programs will include infill geochemical sampling, auger drilling, and detailed geological and regolith mapping over prospective geophysical targets and known anomalous areas. An initial 5,000 meter diamond drilling program is planned to test historical targets and workings, as well as priority structural corridors along the main contact and northeast-trending intersections.

Earn-in Agreement Terms

Fortuna may earn an initial 51% interest in the Quartzstone Project by completing a minimum of 60,000 meters of drilling within four years, while paying all license fees and funding all related expenditures. Upon exercise of the first option, Fortuna will form a joint venture with Qstone.

Fortuna may earn an additional 19% interest in the Quartzstone Project, for an aggregate 70% interest, by solely funding a feasibility study within three years of exercising the first option and continuing to pay all license fees. Upon signing the Earn-In Agreement, the Company paid Qstone a non-refundable cash option premium of US$5 million.

In addition to royalties payable to the State on gold production, the Quartzstone Project is subject to a 4.5% net smelter returns royalty in favour of a prior owner, which may be repurchased at a price to be determined by the parties at any time.

Quality Assurance & Quality Control for previous exploration drill program

All diamond drilling (DD) drill holes started with PQ sized diameter (85 mm core), before reducing to HQ diameter (63.5 mm core) diamond drill bits on intersecting fresh rock. The core was logged, marked up for sampling using standard lengths of one meter or to a geological boundary. Samples were then cut into equal halves using a diamond saw. One half of the core was left in the original core box and stored in a secure location at the core yard at the project site. The other half was sampled, catalogued, and placed into sealed bags and securely stored at the site until shipment.

All DD samples were prepared by WBDG at the in-house sample preparation facility at the Quartzstone camp where samples were dried and crushed to 95% passing a 10-mesh screen. Following crushing, samples were riffled to 500 gram and pulverised to 80% passing a 150-mesh screen to produce a final 50-gram pulp sample.

Prior to 2013, pulps were securely transported to either Loring Laboratories Ltd., in Georgetown, Guyana, or Acme laboratory located in Santiago, Chile, for assay analysis. Samples were analyzed by fire assay using 50 gram sample charge with atomic absorption spectroscopy finish. If the result was >1.0 g/t Au the sample was re-assayed by fire assay with gravimetric finish.

The 2013 exploration program used the Acme Laboratory in Abidjan, Ivory Coast, and ALS Laboratory in Lima, Peru. Acme assayed samples using the bulk leach extractable gold method with solvent residue assayed using a standard fire assay with atomic absorption spectroscopy finish using 50 gram sample charges. ALS used gold by bulk extended leach cyanide using 1 kilogram sample charges.

Since 2015 Activation Laboratories Canada (Actlabs), with a laboratory in Georgetown, Guyana, used for analysis by fire assay with gravimetric finish and leachwell 500 gram sample charges. In 2016 Actlabs were used for re-analysis of rejects by leachwell 500 gram sample charges. The 2017 drilling was analyzed at Actlabs in Georgetown, Guyana, by metallic screens and fire assay with gravimetric finish.

Quality control procedures included the systematic insertion of blanks, duplicates and sample standards into the sample stream. In addition, the laboratories inserted their own quality control samples.

Qualified Person

Paul Weedon, Senior Vice President, Exploration for Fortuna Mining Corp., is a Qualified Person as defined by National Instrument 43-101 being a member of the Australian Institute of Geoscientists (Membership #6001). Mr. Weedon has reviewed and approved the scientific and technical information contained in this news release. Mr. Weedon conducted a site visit to the Quartzstone Project in June 2025, where mineralized intervals of drill core were examined; surface exposures of mineralization were visited, and discussions held with geology staff regarding historical sampling and analytical techniques underlying the drilling data. To further verify the data, original assay certificates were compared to the database and independent sampling of core was performed that confirmed the presence of gold in randomly selected mineralized intervals. There were no limitations to the verification process.

About Fortuna Mining Corp.

Fortuna Mining Corp. is a Canadian precious metals mining company with three operating mines and a portfolio of exploration projects in Argentina, Côte d’Ivoire, Mexico, and Peru, as well as the Diamba Sud Gold Project in Senegal. Sustainability is at the core of our operations and stakeholder relationships. We produce gold and silver while creating long-term shared value through efficient production, environmental stewardship, and social responsibility. For more information, please visit our website at www.fortunamining.com.

ON BEHALF OF THE BOARD

Jorge A. Ganoza
President, CEO, and Director
Fortuna Mining Corp.

Investor Relations:

Carlos Baca | [email protected] | fortunamining.com | X | LinkedIn | YouTube | Instagram | TikTok

Forward looking Statements

This news release contains forward-looking statements which constitute “forward-looking information” within the meaning of applicable Canadian securities legislation and “forward-looking statements” within the meaning of the “safe harbor” provisions of the Private Securities Litigation Reform Act of 1995 (collectively, “Forward-looking Statements”). All statements included herein, other than statements of historical fact, are Forward-looking Statements and are subject to a variety of known and unknown risks and uncertainties which could cause actual events or results to differ materially from those reflected in the Forward-looking Statements. The Forward-looking Statements in this news release include, without limitation, statements pertaining to the ability of Fortuna to satisfy the conditions to earn an initial 51% interest, and an additional 19% interest, in the Quartzstone Project; statements regarding the ability to acquire the 4.5% NSR; statements regarding the Company’s proposed initial exploration program, including planned drilling, camp and access upgrades, and other work; statements about the Company’s business strategies, plans and outlook; the Company’s plans for its mines and mineral properties; changes in general economic conditions and financial markets; the impact of inflationary pressures on the Company’s business and operations; the future results of exploration activities; expectations with respect to metal grade estimates and the impact of any variations relative to metals grades experienced; assumed and future metal prices; the merit of the Company’s mines and mineral properties; and the future financial or operating performance of the Company. Often, but not always, these Forward-looking Statements can be identified by the use of words such as “estimated”, “potential”, “open”, “future”, “assumed”, “projected”, “proposed”, “used”, “detailed”, “has been”, “gain”, “planned”, “reflecting”, “will”, “anticipated”, “estimated” “containing”, “remaining”, “to be”, or statements that events, “could” or “should” occur or be achieved and similar expressions, including negative variations.

Forward-looking Statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements of the Company to be materially different from any results, performance or achievements expressed or implied by the Forward-looking Statements. Such uncertainties and factors include, among others, operational risks associated with mining and mineral processing; uncertainty relating to Mineral Resource and Mineral Reserve estimates; uncertainty relating to capital and operating costs, production schedules and economic returns; risks relating to the Company’s ability to replace its Mineral Reserves; risks related to the conversion of Mineral Resources to Mineral Reserves; risks associated with mineral exploration and project development; uncertainty relating to the repatriation of funds as a result of currency controls; environmental matters including obtaining or renewing environmental permits and potential liability claims; uncertainty relating to nature and climate conditions; laws and regulations regarding the protection of the environment (including greenhouse gas emission reduction and other decarbonization requirements and the uncertainty surrounding the interpretation of omnibus Bill C-59 and the related amendments to the Competition Act (Canada); risks associated with political instability and changes to the regulations governing the Company’s business operations; changes in national and local government legislation, taxation, controls, regulations and political or economic developments in countries in which the Company does or may carry on business; risks associated with war, hostilities or other conflicts, such as the Ukrainian - Russian, Iran - Israel and US, Israel - Hamas conflicts, and the impacts they may have on global economic activity; risks relating to the termination of the Company’s mining concessions in certain circumstances; developing and maintaining relationships with local communities and stakeholders; risks associated with losing control of public perception as a result of social media and other web-based applications; potential opposition to the Company’s exploration, development and operational activities; risks related to the Company’s ability to obtain adequate financing for planned exploration and development activities; property title matters; risks related to the ability to retain or extend title to the Company’s mineral properties; risks relating to the integration of businesses and assets acquired by the Company; impairments; risks associated with climate change legislation; reliance on key personnel; adequacy of insurance coverage; operational safety and security risks; legal proceedings and potential legal proceedings; uncertainties relating to general economic conditions; risks relating to a global pandemic, which could impact the Company’s business, operations, financial condition and share price; competition; fluctuations in metal prices; risks associated with entering into commodity forward and option contracts for base metals production; fluctuations in currency exchange rates and interest rates; tax audits and reassessments; risks related to hedging; uncertainty relating to concentrate treatment charges and transportation costs; sufficiency of monies allotted by the Company for land reclamation; risks associated with dependence upon information technology systems, which are subject to disruption, damage, failure and risks with implementation and integration; labor relations issues; as well as those factors discussed under “Risk Factors” in the Company's Annual Information Form for the fiscal year ended December 31, 2025. Although the Company has attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in Forward-looking Statements, there may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended.

Forward-looking Statements contained herein are based on the assumptions, beliefs, expectations and opinions of management, including, but not limited to, the accuracy of the Company’s current Mineral Resource and Mineral Reserve estimates; that the Company’s activities will be conducted in accordance with the Company’s public statements and stated goals; that there will be no material adverse change affecting the Company, its properties or its production estimates (which assume accuracy of projected ore grade, mining rates, recovery timing, and recovery rate estimates and may be impacted by unscheduled maintenance, labor and contractor availability and other operating or technical difficulties); the duration and effect of global and local inflation; the duration and impacts of geo-political uncertainties on the Company’s production, workforce, business, operations and financial condition; the expected trends in mineral prices, inflation and currency exchange rates; that all required approvals and permits will be obtained for the Company’s business and operations on acceptable terms; that there will be no significant disruptions affecting the Company's operations and such other assumptions as set out herein. Forward-looking Statements are made as of the date hereof and the Company disclaims any obligation to update any Forward-looking Statements, whether as a result of new information, future events, or results or otherwise, except as required by law. There can be no assurance that these Forward-looking Statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, investors should not place undue reliance on Forward-looking Statements.

Cautionary Note to United States Investors Concerning Estimates of Reserves and Resources

All reserve and resource estimates included in this news release have been prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") and the Canadian Institute of Mining, Metallurgy, and Petroleum Definition Standards on Mineral Resources and Mineral Reserves. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for public disclosure by a Canadian company of scientific and technical information concerning mineral projects. All Mineral Reserve and Mineral Resource estimates contained in the technical disclosure have been prepared in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum Definition Standards on Mineral Resources and Reserves. Canadian standards, including NI 43-101, differ significantly from the requirements of the Securities and Exchange Commission, and mineral reserve and resource information included in this news release may not be comparable to similar information disclosed by U.S. companies.

Appendix 1: Quartzstone historical program drill holes and assay results

HoleID

Easting (PSAD56_21N)

Northing (PSAD56_21N)

Elev.
(m)

EOH1,2 Depth (m)

UTM Azimuth

Dip

Depth2 From
(m)

Depth2,3
To (m)

Drilled2,4
Width (m)

Au (g/t)

Hole Type5

Area

1-1

248485.93

727799.3

97.15

160.6

132

-60

46.30

47.10

0.80

6.00

DD

South West

1-1

 

 

 

 

 

 

72.30

77.80

5.50

0.81

DD

South West

1-2

248435.21

727842.85

112.02

160.8

132

-60

NSI

 

 

 

DD

South West

124-1

251490.52

731180.19

151.17

170

90

-60

NSI

 

 

 

DD

Soddam North

1-3

248545.58

727747.63

101.86

160.6

132

-60

62.80

65.80

3.00

0.67

DD

South West

162-1

251706.09

734956.64

105.01

200

90

-60

NSI

 

 

 

DD

Zone 164

164-1

251677.76

735185.91

122.91

64

60

-60

NSI

 

 

 

DD

Zone 164

164-2

251853.97

735258.29

92.74

61.6

270

-60

NSI

 

 

 

DD

Zone 164

164-3

251909.89

735258.04

90.29

113

270

-60

NSI

 

 

 

DD

Zone 164

164-4

251562.46

735188.93

132.63

50

90

-60

20.50

21.50

1.00

7.84

DD

Zone 164

164-5

251540.36

735188.44

134.01

180

90

-60

42.00

50.60

8.60

0.92

DD

Zone 164

164-5

 

 

 

 

 

 

80.60

81.60

1.00

6.50

DD

Zone 164

164-5

 

 

 

 

 

 

134.00

134.70

0.70

5.28

DD

Zone 164

164-5

 

 

 

 

 

 

156.60

166.60

10.00

1.67

DD

Zone 164

164-5

 

 

 

 

 

including

163.50

164.20

0.70

10.44

DD

Zone 164

164-6

251907.73

735088.1

98.01

210

270

-60

NSI

 

 

 

DD

Zone 164

168-1

250712.52

734737.25

190.14

150

0

-90

NSI

 

 

 

DD

Regional

168-2

251271.39

734940.91

210.36

150

0

-90

NSI

 

 

 

DD

Regional

169-1

251296.38

735680.67

162.03

133.5

0

-90

NSI

 

 

 

DD

Main Pit

169-2

251225.56

735675.85

184.98

81.9

90

-60

NSI

 

 

 

DD

Main Pit

169-3

251477.76

735665.07

105.07

120

90

-60

NSI

 

 

 

DD

Main Pit

169-4

251319.08

735660.89

155.55

200

93

-60

NSI

 

 

 

DD

Main Pit

169-5

251310.67

735717.12

151.35

210

105

-60

131.60

134.60

3.00

0.62

DD

Main Pit

172-1

251934.1

735934.22

101.05

100

270

-60

NSI

 

 

 

DD

Regional

172-2

251218.81

735942.28

165.48

211.5

90

-60

NSI

 

 

 

DD

Main Pit

180-1

251603.27

736764.44

119.42

176.3

90

-60

66.90

74.00

7.10

0.87

DD

Blue South

180-2

251453.3

736759.74

130.53

210

90

-60

NSI

 

 

 

DD

Blue South

180-3

251719.28

736776.34

104.74

150.7

270

-60

NSI

 

 

 

DD

Blue South

184-1

251812.35

737168.4

101.78

227

90

-60

NSI

 

 

 

DD

Blue Pit

184-2

251892.61

737159.57

109.2

150

90

-60

0.00

6.50

6.50

3.87

DD

Blue Pit

184-2

 

 

 

 

 

including

3.50

4.20

0.70

20.70

DD

Blue Pit

184-3

251629.92

737171.91

106.07

182

90

-60

NSI

 

 

 

DD

Blue Pit

184-4

251704.07

737171.11

86.27

180.2

90

-60

NSI

 

 

 

DD

Blue Pit

184-6

251992.22

737168.7

90.42

110

270

-60

NSI

 

 

 

DD

Blue Pit

190-1

252090.47

737729.98

89.76

205

90

-60

NSI

 

 

 

DD

Intermediate

192-1

252345.49

737965.12

90.92

201

260

-60

NSI

 

 

 

DD

Intermediate

196-1

251798.66

738367.11

88.81

161

90

-60

NSI

 

 

 

DD

Eikle

196-2

251710.39

738367.34

112.11

209

90

-60

NSI

 

 

 

DD

Eikle

196-3

252144.73

738368.56

103.71

239

270

-60

6.50

9.50

3.00

2.32

DD

Eikle

196-3

 

 

 

 

 

 

117.00

122.50

5.50

0.83

DD

Eikle

196-3

 

 

 

 

 

including

117.00

117.50

0.50

5.13

DD

Eikle

196-4

252223.95

738367.21

93.46

167

270

-60

NSI

 

 

 

DD

Eikle

196-5

252063.75

738365.43

121.3

185

270

-60

3.00

4.00

1.00

8.20

DD

Eikle

196-5

 

 

 

 

 

 

52.50

53.00

0.50

28.40

DD

Eikle

196-5

 

 

 

 

 

 

127.50

128.00

0.50

6.63

DD

Eikle

197-1

251845.41

738474.78

87.23

95

90

-60

NSI

 

 

 

DD

Eikle

197-2

252077.65

738430.53

104.85

130

260

-60

4.00

7.00

3.00

0.95

DD

Eikle

197-3

252149.1

738435.35

102.82

245

260

-60

63.80

65.00

1.20

5.20

DD

Eikle

197-3

 

 

 

 

 

 

207.50

208.80

1.30

6.10

DD

Eikle

198-1

251844.59

738556.69

90.46

179

90

-60

NSI

 

 

 

DD

Eikle

198-10

251902.05

738553.15

106.2

40.1

90

-60

NSI

 

 

 

DD

Eikle

198-11

251894.77

738590.02

107.19

50.4

90

-60

NSI

 

 

 

DD

Eikle

198-2

251769.13

738548.84

98.61

200

90

-60

87.00

90.00

3.00

1.22

DD

Eikle

198-2

 

 

 

 

 

 

103.00

106.00

3.00

10.63

DD

Eikle

198-2

 

 

 

 

 

including

105.00

106.00

1.00

15.90

DD

Eikle

198-2

 

 

 

 

 

 

117.00

121.00

4.00

4.09

DD

Eikle

198-2

 

 

 

 

 

including

120.00

121.00

1.00

15.10

DD

Eikle

198-3

251691.33

738540.79

84.34

221

90

-60

NSI

 

 

 

DD

Eikle

198-4

251622.14

738539.51

84.93

260

90

-60

NSI

 

 

 

DD

Eikle

198-5

252131.79

738548.22

98.14

200

270

-60

NSI

 

 

 

DD

Eikle

198-6

252049.57

738551.3

89.1

179

270

-60

NSI

 

 

 

DD

Eikle

198-7

251535.84

738548.09

98.1

130

90

-60

NSI

 

 

 

DD

Eikle

198-8

251449.61

738555.44

109.37

190

90

-60

NSI

 

 

 

DD

Eikle

198-9

251893.31

738507.63

105.66

45.1

90

-60

NSI

 

 

 

DD

Eikle

199-1

251874.94

738644.74

118.26

89

90

-60

NSI

 

 

 

DD

Eikle

199-2

251907.45

738644.86

119.08

145

90

-60

NSI

 

 

 

DD

Eikle

200-1

251865.58

738771.43

91.14

152

90

-60

59.00

64.25

5.25

0.76

DD

Eikle

200-2

251784.8

738765.72

96.85

167

90

-60

145.60

146.10

0.50

9.77

DD

Eikle

200-3

251650.63

738763.53

121.69

248

90

-60

235.00

236.50

1.50

8.54

DD

Eikle

200-4

252010.14

738771.06

99.79

148

270

-60

NSI

 

 

 

DD

Eikle

2-1

248662.96

727975.56

127.22

160.6

132

-60

NSI

 

 

 

DD

South West

2-2

248614.65

728019.66

116.62

160

132

-60

NSI

 

 

 

DD

South West

2-3

248705.71

727933.71

127.36

160.6

132

-60

14.40

19.20

4.80

1.12

DD

South West

3-1

248816.6

728167.78

119.29

160.6

132

-60

31.10

35.30

4.20

0.66

DD

South West

3-2

248764.59

728216.67

108.95

160.6

132

-60

NSI

 

 

 

DD

South West

3-3

248871.28

728116.78

130.09

160

132

-60

NSI

 

 

 

DD

South West

54-1

251419.14

724166.05

118.43

199

90

-60

NSI

 

 

 

DD

Barrakad

64-1

251324.23

725170.27

108.58

166

90

-60

NSI

 

 

 

DD

Barrakad

64-2

251240.42

725164.29

109.63

226

90

-60

NSI

 

 

 

DD

Barrakad

70-1

251258.07

725762.86

124.54

100

90

-60

NSI

 

 

 

DD

Barrakad

70-2

251164.28

725765.92

123.17

150

90

-60

NSI

 

 

 

DD

Barrakad

BC-1-1

252388.87

723711.5

90.26

150

225

-60

NSI

 

 

 

DD

Barrakad

BC-1-2

252336.79

723658.51

90.15

151

225

-60

NSI

 

 

 

DD

Barrakad

BC-1-2A

252342.22

723660.43

89.37

48

225

-60

NSI

 

 

 

DD

Barrakad

BC-2-1

252367.54

724109.2

109.97

114.55

225

-60

NSI

 

 

 

DD

Barrakad

BC-2-2

252328.84

724071.7

113.51

185

225

-60

NSI

 

 

 

DD

Barrakad

BC-2-3

252271.96

724013.81

107.12

165

225

-60

NSI

 

 

 

DD

Barrakad

BC-2-4

252214.43

723956.57

92.55

225

225

-60

210.50

211.00

0.50

14.50

DD

Barrakad

BC-2-5

252135.46

723877.81

95.11

150

225

-60

NSI

 

 

 

DD

Barrakad

BC-2-6

252130.65

723871.62

95.3

120

45

-60

NSI

 

 

 

DD

Barrakad

DQS-001

251840.99

737172.83

106.59

65

118

-60

51.90

56.40

4.50

0.67

DD

Blue Pit

DQS-002

251864.9

737206.01

96.13

50

118

-60

NSI

 

 

 

DD

Blue Pit

DQS-003

251796.36

737196.94

103.02

110

118

-60

88.80

89.80

1.00

8.87

DD

Blue Pit

DQS-004

251820.38

737140.42

97.55

65

118

-60

NSI

 

 

 

DD

Blue Pit

DQS-005

251845.12

737127.8

98.71

35

118

-60

NSI

 

 

 

DD

Blue Pit

DQS-006

251889.53

737193.31

99.06

39

118

-60

12.00

15.00

3.00

0.78

DD

Blue Pit

DQS-007

251886.57

738525.13

100.62

50

90

-60

32.10

40.10

8.00

1.68

DD

Eikle

DQS-007

 

 

 

 

 

including

38.30

39.00

0.70

9.54

DD

Eikle

DQS-008

251885.22

738486.99

103.64

40.5

90

-60

NSI

 

 

 

DD

Eikle

DQS-009

251877.72

738567.19

99.25

59.2

90

-60

35.80

46.50

10.70

1.16

DD

Eikle

DQS-009

 

 

 

 

 

including

37.50

38.20

0.70

7.90

DD

Eikle

DQS-010

251842.69

738525.5

87.89

80.6

90

-60

27.70

33.50

5.80

2.00

DD

Eikle

DQS-010

 

 

 

 

 

including

31.20

31.90

0.70

7.85

DD

Eikle

DQS-010

 

 

 

 

 

 

40.40

41.00

0.60

12.73

DD

Eikle

DQS-011

251837.3

738567.63

92.34

89

90

-60

NSI

 

 

 

DD

Eikle

DQS-012

251878.57

738615.14

112.99

76.6

90

-60

53.70

59.60

5.90

3.69

DD

Eikle

DQS-012

 

 

 

 

 

including

53.70

54.60

0.90

10.30

DD

Eikle

DQS-013

251832.72

738615.03

113.14

108

90

-60

71.50

79.50

8.00

3.59

DD

Eikle

DQS-013

 

 

 

 

 

including

72.50

73.50

1.00

14.60

DD

Eikle

DQS-014

251743.78

738590.05

90.41

151.6

90

-60

128.40

129.40

1.00

13.50

DD

Eikle

DQS-015

251686.8

738638.67

109.15

200

90

-60

157.90

161.20

3.30

7.12

DD

Eikle

DQS-015

 

 

 

 

 

including

158.90

159.60

0.70

25.90

DD

Eikle

DQS-016

251664.7

736778.03

112.4

45

90

-60

23.00

28.60

5.60

27.78

DD

Blue South

DQS-016

 

 

 

 

 

including

25.60

26.70

1.10

41.10

DD

Blue South

DQS-016

 

 

 

 

 

and

26.70

27.70

1.00

89.90

DD

Blue South

DQS-017

251672.4

736816.93

106.15

45

90

-60

23.40

24.10

0.70

7.55

DD

Blue South

DQS-018

251667.79

736740.62

120.67

36

90

-60

15.60

26.10

10.50

1.07

DD

Blue South

DQS-019

251572.96

736957.17

103.54

115.6

90

-60

NSI

 

 

 

DD

Blue South

DQS-020

251896.18

737368.37

99.4

36

90

-60

NSI

 

 

 

DD

Blue South

DQS-021

251327.36

735783.21

121.78

150

108

-60

91.60

94.60

3.00

12.48

DD

Main Pit

DQS-021

 

 

 

 

 

including

91.60

92.60

1.00

29.56

DD

Main Pit

DQS-022

251479.42

736333.26

147.23

55

90

-60

33.50

40.50

7.00

0.87

DD

Zone 176-3

DQS-023

251484.73

736371.3

151.86

90

90

-60

19.40

26.10

6.70

0.75

DD

Zone 176-3

DQS-024

251481.03

736411.19

167.21

60

90

-60

NSI

 

 

 

DD

Zone 176-3

DQS-025

251413.82

736329.07

157.34

100

90

-60

NSI

 

 

 

DD

Zone 176-3

DQS-026

251410.8

736368.09

164.54

115.6

90

-60

91.10

94.20

3.10

1.33

DD

Zone 176-3

DQS-027

251475.45

736449.2

176.6

60

90

-60

NSI

 

 

 

DD

Zone 176-3

DQS-028

251469.45

736288.22

150.95

61.4

90

-60

NSI

 

 

 

DD

Zone 176-3

DQS-029

251411.16

736412.63

173.7

112.5

90

-60

99.80

103.90

4.10

0.50

DD

Zone 176-3

DQS-030

251685.67

736329.09

105.26

54

90

-60

NSI

 

 

 

DD

Zone 176-3

DQS-031

251659.84

735205.27

117.94

120

90

-60

NSI

 

 

 

DD

Zone 164

DQS-032

251543.3

735212.55

124.72

61.5

90

-60

37.00

40.20

3.20

1.81

DD

Zone 164

DQS-033

251514.18

735252.2

131.73

97.6

90

-60

87.60

90.60

3.00

1.14

DD

Zone 164

DQS-034

251550.23

735145.14

144.01

65.2

90

-60

40.50

47.30

6.80

1.55

DD

Zone 164

DQS-035

251558.94

735108.26

151.17

57

90

-60

NSI

 

 

 

DD

Zone 164

DQS-036

251558.38

735070.33

149.96

60

90

-60

38.00

40.00

2.00

9.46

DD

Zone 164

DQS-037

251546.7

735025.63

145.68

60

90

-60

NSI

 

 

 

DD

Zone 164

DQS-038

251589.5

734064.43

207.52

75

90

-60

NSI

 

 

 

DD

Zone 153

DQS-039

251587.67

734099.08

203.33

60

90

-60

NSI

 

 

 

DD

Zone 153

DQS-040

251598.1

734022.55

208.51

60

90

-60

NSI

 

 

 

DD

Zone 153

DQS-041

251601.2

734186.12

186.63

60

90

-60

NSI

 

 

 

DD

Zone 153

DQS-042

251618.73

733939.69

201.38

56.2

90

-60

NSI

 

 

 

DD

Zone 153

DQS-043

251603.74

733976.64

205.08

66

90

-60

42.70

55.40

12.70

4.31

DD

Zone 153

DQS-043

 

 

 

 

 

including

44.60

46.20

1.60

15.58

DD

Zone 153

DQS-043

 

 

 

 

 

and

54.10

55.40

1.30

12.45

DD

Zone 153

DQS-044

251608.46

733891.62

197.83

65

90

-60

NSI

 

 

 

DD

Zone 153

DQS-045

251623.28

736823.07

107.56

70.6

90

-60

47.40

55.90

8.50

3.15

DD

Blue South

DQS-045

 

 

 

 

 

including

53.00

54.00

1.00

11.49

DD

Blue South

DQS-046

251601.25

736784.64

112.77

85

90

-60

NSI

 

 

 

DD

Blue South

DQS-047

251593.07

736739.11

125.46

90.4

90

-60

74.60

78.20

3.60

7.88

DD

Blue South

DQS-047

 

 

 

 

 

including

75.60

77.60

2.00

13.38

DD

Blue South

DQS-048

251666.6

736656.91

142.57

56

90

-60

NSI

 

 

 

DD

Blue South

DQS-049

251660.13

736697.68

132.21

55

90

-60

27.60

28.60

1.00

5.17

DD

Blue South

DQS-049

 

 

 

 

 

 

34.30

38.30

4.00

1.99

DD

Blue South

DQS-050

251650.55

736620.72

154.4

75

90

-60

NSI

 

 

 

DD

Blue South

DQS-051

251659.9

736582.35

154.21

60.1

90

-60

NSI

 

 

 

DD

Blue South

DQS-052

251609.1

736861.71

96.69

80

90

-60

51.60

55.60

4.00

12.65

DD

Blue South

DQS-053

251532.13

736961.69

110.38

106.6

90

-60

NSI

 

 

 

DD

Blue South

DQS-054

251614.74

736894.97

91.74

75

90

-60

49.70

58.40

8.70

4.84

DD

Blue South

DQS-054

 

 

 

 

 

including

49.70

51.50

1.80

9.94

DD

Blue South

DQS-054

 

 

 

 

 

and

52.90

53.70

0.80

13.05

DD

Blue South

DQS-055

251625.84

736999.57

102.82

75

90

-60

NSI

 

 

 

DD

Blue South

DQS-056

251649.31

736896.44

97.81

50

90

-60

NSI

 

 

 

DD

Blue South

DQS-057

251339.48

735818.75

118.14

140

100

-60

92.20

105.40

13.20

15.93

DD

Main Pit

DQS-057

 

 

 

 

 

including

94.90

95.90

1.00

74.72

DD

Main Pit

DQS-057

 

 

 

 

 

and

95.9

96.9

1.00

81.96

DD

Main Pit

DQS-057

 

 

 

 

 

 

110.10

116.40

6.30

0.77

DD

Main Pit

DQS-058

251359.25

735865.4

125.67

132

90

-60

101.80

113.70

11.90

0.45

DD

Main Pit

DQS-059

251477.73

735208.09

158.23

110

90

-60

94.10

97.30

3.20

0.64

DD

Zone 164

DQS-060

251480.73

735150.39

169.93

129

90

-60

NSI

 

 

 

DD

Zone 164

DQS-061

251489.83

735109.5

177.54

130.6

90

-60

87.80

92.20

4.40

1.15

DD

Zone 164

DQS-062

251792.3

734956.42

96.15

70.6

270

-60

NSI

 

 

 

DD

Main South

DQS-063

251771.43

734876.66

112.15

79.6

270

-60

NSI

 

 

 

DD

Main South

DQS-064

251645.32

730918.31

119.19

76.6

270

-60

2.80

6.50

3.70

4.31

DD

Soddam North

DQS-064

 

 

 

 

 

including

4.80

5.70

0.90

8.28

DD

Soddam North

DQS-065

251579.09

731180.07

125.77

80

280

-60

NSI

 

 

 

DD

Soddam North

DQS-066

251623.71

735486.72

114.93

74

0

-60

NSI

 

 

 

DD

Camp

DQS-067

251330.18

735816.26

118.6

235.5

0

-90

135.60

139.30

3.70

0.63

DD

Main Pit

DQS-068

251321.63

735783.25

121.89

149

0

-80

NSI

 

 

 

DD

Main Pit

DQS-069

251608.8

736871.17

96.35

105.5

0

-90

77.10

77.80

0.70

6.36

DD

Blue South

DQS-070

251583.2

736739.3

125.59

128

0

-90

105.00

110.00

5.00

11.13

DD

Blue South

DQS-070

 

 

 

 

 

including

105.00

107.00

2.00

19.33

DD

Blue South

DQS-070

 

 

 

 

 

and

108.00

109.00

1.00

16.63

DD

Blue South

DQS-071

251599.37

736819.93

104.84

104

0

-90

89.20

95.90

6.70

10.82

DD

Blue South

DQS-071

 

 

 

 

 

including

94.20

95.00

0.80

37.84

DD

Blue South

DQS-072

251687.04

738648.97

109.69

323

0

-90

269.00

275.00

6.00

0.97

DD

Eikle

DQS-073

251650.07

738773.92

122.63

400

0

-90

NSI

 

 

 

DD

Eikle

DQS-074

251885.34

737730.36

84.19

62

90

-60

NSI

 

 

 

DD

Mango Tree

DQS-075

251519.36

736824.08

103.64

179.6

0

-90

NSI

 

 

 

DD

Blue South

DQS-076

251518.32

736829.81

103.7

242

270

-70

NSI

 

 

 

DD

Blue South

DQS-077

251352.1

735869.66

125.72

167.3

0

-90

142.20

146.30

4.10

4.72

DD

Main Pit

DQS-077

 

 

 

 

 

including

145.30

146.30

1.00

16.30

DD

Main Pit

DQS-078

251362.02

735916.5

135.86

173

100

-60

NSI

 

 

 

DD

Main Pit

DQS-079

251360.75

735916.71

135.8

242

0

-90

NSI

 

 

 

DD

Main Pit

DQS-080

251313.29

735864.27

121.07

164

100

-60

142.50

146.50

4.00

1.76

DD

Main Pit

DQS-081

251366.29

735782.52

110.45

90

100

-60

66.80

72.80

6.00

1.15

DD

Main Pit

DQS-081

 

 

 

 

 

 

77.50

80.60

3.10

4.52

DD

Main Pit

DQS-081

 

 

 

 

 

including

78.30

79.00

0.70

15.95

DD

Main Pit

DQS-083

251222.6

735785

161.3

260

90

-75

NSI

 

 

 

DD

Main Pit

DQS-084

251392.32

735814.29

108.15

89

90

-60

67.40

75.10

7.70

9.04

DD

Main Pit

DQS-084

 

 

 

 

 

including

70.20

71.20

1.00

46.44

DD

Main Pit

DQS-085

251426.89

735637.84

106.31

60

0

-60

NSI

 

 

 

DD

Main Pit

DQS-086

251422.32

735639.82

106.25

60

330

-60

37.80

41.90

4.10

6.66

DD

Main Pit

DQS-086

 

 

 

 

 

including

38.80

39.80

1.00

22.48

DD

Main Pit

DQS-087

251243.76

735867.83

144.3

230

90

-70

200.00

208.00

8.00

0.84

DD

Main Pit

DQS-088

251242.92

735867.88

144.24

281

0

-90

222.10

223.10

1.00

12.36

DD

Main Pit

DQS-088

 

 

 

 

 

 

230.00

237.60

7.60

1.64

DD

Main Pit

DQS-088

 

 

 

 

 

including

236.70

237.60

0.90

7.47

DD

Main Pit

DQS-088

 

 

 

 

 

 

242.70

255.80

13.10

9.91

DD

Main Pit

DQS-088

 

 

 

 

 

including

246.70

247.70

1.00

101.58

DD

Main Pit

DQS-089

251427.9

735830.5

106.2

62

90

-60

37.70

40.80

3.10

1.99

DD

Main Pit

DQS-090-1

251909.11

738611.97

114.25

45

90

-60

20.80

30.60

9.80

0.96

DD

Eikle

DQS-091

251899.17

738588.18

107.06

44

90

-60

22.20

23.20

1.00

5.24

DD

Eikle

DQS-092

251912.41

738569.38

103.25

29

90

-60

11.10

11.80

0.70

9.77

DD

Eikle

DQS-092

 

 

 

 

 

 

17.40

21.50

4.10

4.59

DD

Eikle

DQS-092

 

 

 

 

 

including

19.80

20.50

0.70

13.30

DD

Eikle

DQS-093-2

251910.76

738548.85

103.43

27.4

90

-60

20.10

24.20

4.10

2.61

DD

Eikle

DQS-093-2

 

 

 

 

 

including

23.50

24.20

0.70

10.69

DD

Eikle

DQS-094

251907.91

738525.71

103.76

27.4

90

-60

8.00

14.00

6.00

2.17

DD

Eikle

DQS-094

 

 

 

 

 

including

8.00

9.10

1.10

6.11

DD

Eikle

DQS-094

 

 

 

 

 

 

19.00

24.30

5.30

2.05

DD

Eikle

DQS-094

 

 

 

 

 

including

23.50

24.30

0.80

9.55

DD

Eikle

DQS-096

251927.08

738614.4

111.4

30.5

90

-60

2.60

9.00

6.40

0.98

DD

Eikle

DQS-097

251903.59

738633.58

118.78

57.5

90

-60

32.40

37.40

5.00

3.72

DD

Eikle

DQS-097

 

 

 

 

 

including

32.40

33.40

1.00

16.13

DD

Eikle

DQS-097

 

 

 

 

 

 

42.40

49.00

6.60

0.59

DD

Eikle

DQS-098

251891.64

738645.22

118.47

69

90

-60

54.70

60.50

5.80

1.51

DD

Eikle

DQS-101

251154.13

735863.83

178.41

452

0

-90

311.00

316.00

5.00

1.70

DD

Main Pit

DQS-102

251257.37

735815.12

140.23

324

0

-90

102.00

105.00

3.00

3.51

DD

Main Pit

DQS-102

 

 

 

 

 

 

221.40

226.60

5.20

0.96

DD

Main Pit

DQS-102

 

 

 

 

 

 

238.90

240.90

2.00

10.90

DD

Main Pit

DQS-103

251216.66

735815.42

157.4

316

0

-90

266.40

269.40

3.00

2.45

DDH

Main Pit

DQS-103

 

 

 

 

 

 

273.20

283.00

9.80

1.26

DDH

Main Pit


Notes:

1. EOH: End of hole
2. Depths and widths reported to nearest significant decimal place
3. NSI: No significant intercepts
4. True widths cannot be estimated currently, as the orientation of mineralization is unknown.
5. RC: reverse circulation drilling | DD: diamond drilling tail | RCD: reverse circulation drilling with diamond tail

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/7267336f-e571-43b5-a628-f0ae9b6442df

A PDF accompanying this announcement is available at http://ml.globenewswire.com/Resource/Download/674835e3-3324-4522-a8a9-7595c470e04a