Business
CopperBank Intercepts 324 Meters of 0.31% Copper (0.43% CuEq) at Pyramid
VANCOUVER, BC / ACCESSWIRE / November 14, 2017 / CopperBank Resources Corp. (''CopperBank'' ...

About this update from Faraday Copper Corp
[{"type":"text","content":"CopperBank Intercepts 324 Meters of 0.31% Copper (0.43% CuEq) at PyramidVANCOUVER, BC / ACCESSWIRE / November 14, 2017 / CopperBank Resources Corp. (''CopperBank'' or the ''Company'') (CSE: CBK) (OTC PINK: CPPKF) is pleased to report results for the last seven holes from its thirteen diamond drill hole (DDH) summer 2017 program on its 100% controlled Pyramid Copper Project (''Pyramid'') located on the Alaskan Peninsula. Results from the 2017 drill program will enable the Company to produce an updated resource estimate in the upcoming months.\nHighlights from the final seven drill holes include DDH 17PY037 which is entirely outside the historical resource envelope and was mineralized from 7.3 meters over its entire length. Furthermore, mineralization found in DDH 17PY039, 17PY041 and previously drilled hole 12PY021 assists in linking the Main Zone to the West Zone. Consolidated results of the entire 2017 campaign are listed in the following table:\n\n \n \n \n Hole No\n \n \n From \n m\n \n \n To \n m\n \n \n Width \n m\n \n \n Cu \n %\n \n \n Mo \n %\n \n \n Au \n g/t\n \n \n CuEq\n %\n \n \n \n \n 17PY037\n \n \n 7.3\n \n \n 331.6\n \n \n 324.3\n \n \n 0.31\n \n \n 0.02\n \n \n 0.12\n \n \n 0.43\n \n \n \n \n 17PY038\n \n \n 11\n \n \n 61\n \n \n 50.0\n \n \n 0.31\n \n \n 0.01\n \n \n 0.24\n \n \n 0.36\n \n \n \n \n 17PY039\n \n \n 60\n \n \n 116\n \n \n 56\n \n \n 0.34\n \n \n 0.00\n \n \n 0.08\n \n \n 0.34\n \n \n \n \n 17PY040\n \n \n 7\n \n \n 309\n \n \n 302\n \n \n 0.10\n \n \n 0.01\n \n \n 0.06\n \n \n 0.18\n \n \n \n \n 17PY041\n \n \n 74\n \n \n 154.2\n \n \n 80.2\n \n \n 0.33\n \n \n 0.01\n \n \n 0.02\n \n \n 0.36\n \n \n \n \n 17PY042\n \n \n 7.9\n \n \n 248.8\n \n \n 240.9\n \n \n 0.12\n \n \n 0.03\n \n \n 0.04\n \n \n 0.22\n \n \n \n \n 17PY043\n \n \n 171\n \n \n 203\n \n \n 32\n \n \n 0.15\n \n \n 0.01\n \n \n 0.01\n \n \n 0.20\n \n \n \n \n Previously reported drill holes from the 2017 program (applying no cut-off)\n \n \n \n \n \n 17PY031\n \n \n 24\n \n \n 30\n \n \n 6\n \n \n 0.24\n \n \n 0.05\n \n \n 0.04\n \n \n 0.39\n \n \n \n \n 17PY032\n \n \n 3.1\n \n \n 401.7\n \n \n 399.6\n \n \n 0.35\n \n \n 0.02\n \n \n 0.08\n \n \n 0.44\n \n \n \n \n 17PY033\n \n \n 64\n \n \n 364\n \n \n 300\n \n \n 0.53\n \n \n 0.02\n \n \n 0.12\n \n \n 0.65\n \n \n \n \n 17PY034\n \n \n 7\n \n \n 239.9\n \n \n 232.9\n \n \n 0.19...