Business

Ero Copper intersects 27.4 meters grading 8.39% copper including 17.7 meters grading 10.76% copper in near-surface extension of Vermelhos East Zone discovery

VANCOUVER, British Columbia, Dec. 11, 2018 (GLOBE NEWSWIRE) -- Ero Copper Corp. (the “Company”) (TSX: ERO) is pleased to provide a quarterly update on the ongoi

articleEro Copper Corp.December 11, 20184/company/ero-copper-corp/news/ero-copper-intersects-274-meters-grading-839percent-copper-including-177-meters-grading-1076percent-copper-in-near-surface-extension-of-vermelhos-east-zone-discovery
Ero Copper intersects 27.4 meters grading 8.39% copper including 17.7 meters grading 10.76% copper in near-surface extension of Vermelhos East Zone discovery

About this update from Ero Copper Corp.

[{"type":"text","content":" VANCOUVER, British Columbia, Dec. 11, 2018 (GLOBE NEWSWIRE) -- Ero Copper Corp. (the “Company”) (TSX: ERO) is pleased to provide a quarterly update on the ongoing exploration drill programs at its Pilar, Vermelhos and Surubim mineral districts, all part of its 99.6% owned Vale do Curaçá Property located in Bahia State, Brazil.  Significant exploration results are highlighted below:  Near-surface extensions of the recently announced Vermelhos East Zone highlighted by holes: FVS-311 that intersected 27.4 meters grading 8.39% copper including 17.7 meters grading 10.76% copper from 81.2 meters downhole; FVS-269 that intersected 26.3 meters grading 3.63% copper including 15.7 meters grading 4.93% copper from 3.1 meters downhole; and, FVS-292 that intersected 16.5 meters grading 4.22% copper including 9.0 meters grading 6.10% copper from 64.2 meters downhole. These high-grade results are part of a group of 7 holes drilled within 100 meters of surface, that when combined with analysis following the discovery of the Vermelhos East Zone, including the results of the 11 holes outlined in this press release, confirm the Vermelhos East Zone is not a discrete zone, but rather a semi-continuous mineralized structure extending from the Vermelhos Mine (UG1 mining area) in a north-northeast direction to the Vermelhos West deposit – a combined strike length of approximately 1.1 kilometers.  To date, the Vermelhos East Zone has been delineated from surface to a depth of approximately 400 meters and remains open along strike and to depth.  Further drill testing to determine continuity of the high-grade portions of the Vermelhos East Zone is a top priority of the Company’s ongoing exploration efforts in the Vermelhos District. Within the Vermelhos Mine’s main orebodies, drill results continue to expand known areas of high-grade mineralization in and around the mine’s recently completed infrastructure. Results during the period are highlighted by holes: FVS-257 that intersected 38.2 meters grading 7.29% copper including 23.1 meters grading 11.16% copper and 10.1 meters grading 4.59% copper; FVS-328 that intersected 38.2 meters grading 6.79% copper including 19.4 meters grading 8.38% copper; and, FVS-331 that intersected 31.5 meters grading 8.72% copper and 8.5 meters grading 5.48% copper. These results reflect significant increas...

More updates from Ero Copper Corp.