Business
Additional purchase order from existing customer
Additional purchase order from existing customer.

About this update from Clean Power Hydrogen Plc
[{"type":"text","content":"\n \n \n \n RNS Number : 1648H\n Clean Power Hydrogen\n 04 April 2022\n \n \n \n \n \n \n \n \n The information communicated within this announcement is deemed to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 which is part of UK law by virtue of the European Union (withdrawal) Act 2018. Upon the publication of this announcement, this inside information is now considered to be in the public domain.\n \n \n \n \n \n 4 April 2022\n \n \n \n \n \n Clean Power Hydrogen Plc\n \n \n (\"CPH2\", the \"Company\" or the \"Group\")\n \n \n \n \n \n Additional purchase order from existing customer\n \n \n \n CPH2, the UK-based green hydrogen technology and manufacturing company that has developed the IP-protected Membrane-Free Electrolyser (\"MFE\"), \n is pleased to announce that it has entered into a purchase order with AFCryo, a New Zealand based manufacturer of composite cryostats and cryogenic cooling systems, for the sale of a 1MW MFE220 electrolyser unit to be delivered in early 2023. This is the second 1MW electrolyser unit that AFCryo has purchased within 18 months. \n \n \n \n \n \n CPH2 has an established working relationship with AFCryo and utilises the AFCryo cryogenic cooling system in its MFEs. CPH2's MFE220 runs with 1MW of input power with eight stacks and is capable of producing 450kg/day of high purity hydrogen output. The stack is made of ubiquitous materials and generates a mixed wet gas. The wet gas then passes through a series of driers before entering the separation unit where the oxygen is cryogenically separated from the hydrogen. The cold energy from this cryogenic process is captured via a heat exchanger and used to super-cool the incoming mixed gas, thereby improving the efficiency of the process. The MFE is scalable, easily transported and assembled in the required scale and specification for the end customer.\n \n \n \n \n \n In May 2021 AFCryo placed an order for its first 1MW MFE220 electrolyser, with delivery anticipated in September 2022. Additionally, in 2021, AFCryo was appointed as a non-exclusive agent for the marketing and sale of the CPH2 electrolyser system in Australia, New Zealand and the Pacific Islands.\n \n \n \n \n \n Both of these electrolysers will be used as part of the decarbonisation of...