Business
CanAlaska 2025 Summer Drill Program Assays Results Confirm Extension of Pike Zone Mineralization
Pike Zone Mineralized Corridor Remains Open with Strengthening Target Vectors to West$15 Million 2026 Exploration Program Ongoing at West McArthur JV ProjectSaskatoon, Saskatchewan--(Newsfile Corp. - January 22, 2026) - CanAlaska Uranium Ltd. (TSXV: CVV) (OTCQX: CVVUF) (FSE: DH7) ("CanAlaska" or the "Company") is pleased to report that it has received the geochemical assay results from the 2025 summer drill program completed on the Pike Zone at the West McArthur Project (the "Project") (Figure..
About this update from Canalaska Uranium Ltd
[{"type":"text","content":"Pike Zone Mineralized Corridor Remains Open with Strengthening Target Vectors to West","length":85,"tagName":"p"},{"type":"text","content":"$15 Million 2026 Exploration Program Ongoing at West McArthur JV Project","length":72,"tagName":"p"},{"type":"text","content":"Saskatoon, Saskatchewan--(Newsfile Corp. - January 22, 2026) - CanAlaska Uranium Ltd. (TSXV: CVV) (OTCQX: CVVUF) (FSE: DH7) ("CanAlaska" or the "Company") is pleased to report that it has received the geochemical assay results from the 2025 summer drill program completed on the Pike Zone at the West McArthur Project (the "Project") (Figure 1). During the summer program, the Company focused on continued step outs from the Pike Zone high-grade mineralization and successfully expanded the mineralized footprint of the Pike Zone at the unconformity to 500 metres length. Geochemical assay results confirm the previously reported eU3O8 results and highlight the strong hydrothermal alteration, intense structural disruption, and uranium mineralization increasing to the southwest along the C10S trend for approximately 250 metres away from the high-grade pod at the Pike Zone. Importantly, the western-most drill fences from the summer program were highlighted by unconformity uranium mineralization in drillholes WMA099 which intersected 2.5 metres at 0.78% U3O8 and WMA099-03 which intersected 3.3 metres at 0.53% U3O8, associated with strong alteration and structural disruption. The Company believes these drillholes highlight the potential for additional mineralized pods along the C10S corridor.","length":1331,"tagName":"p"},{"type":"image","alt":"","displaySize":"","headline":null,"caption":"","className":"","disableSlideshowImg":false,"size":{"original":{"width":550,"height":309,"url":"https://media.zenfs.com/en/newsfile_64/aaee149ce62e67ca03051fe21e92ae57"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/bEt0eWXI1WzFayqdg01sCg--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTUzOTtjZj13ZWJw/https://media.zenfs.com/en/newsfile_64/aaee149ce62e67ca03051fe21e92ae57","width":550,"height":309}},"href":"https://images.newsfilecorp.com/files/2864/281164_e909d771d4661b7e_002full.jpg","hrefExternal":true,"rel":"nofollow"},{"type":"text","content":"Figure 1 – West McArthur Project Location","length":41,"tagName":"p","attribs":{}},{"type":"text","content":"To view an enh...