Business
BeMetals Drilling Results Exceed Expectations at the High-Grade Base and Precious Metal South Mountain Project in Idaho
VANCOUVER, CANADA / ACCESSWIRE / November 26, 2019 / BeMetals Corp. (" BeMetals " or the " C...

About this update from Bemetals Corp.
[{"type":"text","content":"BeMetals Drilling Results Exceed Expectations at the High-Grade Base and Precious Metal South Mountain Project in IdahoVANCOUVER, CANADA / ACCESSWIRE / November 26, 2019 / BeMetals Corp. (\"BeMetals\" or the \"Company\") (TSXV:BMET)(OTCQB:BMTLF) is pleased to announce analytical results for drill holes SM19-007, SM19-010 and SM19-014 from its Phase 1 underground drilling program at the Company's high-grade South Mountain Base and Precious Metal Project (\"South Mountain\" or the \"Project\") in southwestern Idaho, U.S.A. Notably, the results from Hole SM19-014 represent the deepest mineralized intersections on the property, and the DMEA zone remains open at depth (See Figures 1 & 2).From this latest batch of results, Hole SM19-014 has delivered intersections exceeding the Company's initial expectations through returning multiple zones of mineralization in the projected extension of the DMEA zone. These new intersections of mineralization are outside of the current resource area and indicate the potential to significantly expand the existing high-grade mineral resource (See Figure 1). These results also continue to support the high-grade nature of the Project's polymetallic mineralization and the dominant copper credit in the adjacent Texas Zone of the deposit (Hole SM19-010). Further mineralized zones from additional holes are under geological logging, sampling and analysis.DRILL HOLE HIGHLIGHTS:SM19-007: 12.20 metres grading 18.16% Zinc (\"Zn\"), 122.6 grams per tonne (\"g/t\") Silver (\"Ag\"), 4.41 g/t Gold (\"Au\"), 1.55% Lead (\"Pb\"), and 0.16% Copper (\"Cu\")SM19-010 Interval 1: 7.21 metres grading 4.37% Zn, 155.2 g/t Ag, 0.13 g/t Au, 0.03% Pb, and 2.07% CuSM19-014 Interval 1: 15.09 metres grading 9.59% Zn, 127.1 g/t Ag, 1.50 g/t Au, 0.69% Pb, and 0.28% CuSM19-014 Interval 2: 5.81 metres grading 4.88% Zn, 76.9 g/t Ag, 2.55 g/t Au, 0.21% Pb, and 0.12% CuSM19-014 Interval 5: 8.29 metres grading 8.11% Zn, 178.7 g/t Ag, 0.48 g/t Au, 0.57% Pb, and 1.73% CuNote: ALS Global completed the analytical work with the core samples processed at their preparation facility in Reno, Nevada, U.S.A. All analytical and assay procedures are conducted at the ALS laboratory in North Vancouver, BC. Reported widths are drilled core lengths as true widths are unknown at this time. It is estimated based upon current data that true widths might r...