Business

Banyan Gold Intersects Multiple High-Grade Mineralization Occurrences in Powerline and Airstrip Deposits, AurMac, Yukon, Canada

VANCOUVER, BC / ACCESS Newswire / January 8, 2026 / Banyan Gold Corp . (the " Company " or " ...

articleBanyan Gold Corp.January 8, 20263/company/banyan-gold/news/banyan-gold-intersects-multiple-high-grade-mineralization-occurrences-in-powerline-and-airstrip-deposits-aurmac-yukon-canada
Banyan Gold Intersects Multiple High-Grade Mineralization Occurrences in Powerline and Airstrip Deposits, AurMac, Yukon, Canada

About this update from Banyan Gold Corp.

[{"type":"text","content":"Banyan Gold Intersects Multiple High-Grade Mineralization Occurrences in Powerline and Airstrip Deposits, AurMac, Yukon, CanadaVANCOUVER, BC / ACCESS Newswire / January 8, 2026 / Banyan Gold Corp. (the \"Company\" or \"Banyan\") (TSXV:BYN)(OTCQB:BYAGF) is pleased to announce it has intersected new high-grade domains and visible gold in the Powerline Deposit (\"Powerline\") and high-grade skarn mineralization in the Airstrip Deposit (\"Airstrip\"), at its AurMac Project (\"AurMac\"), Yukon, Canada.Selected highlights demonstrate extension of Powerline Mineralization southwest of the currently defined resource and confirm grade and continuity within and between Powerline and Airstrip deposits:AX-25-773 - 1.90 g/t over 31.2m within 1.10 g/t Au over 66.6m, including high-grade of 3.79 g/t Au over 7.6m, and 0.95 g/t Au over 29.6m, with high-grade intervals of 3.64 g/t au over 6.7m and 4.37 g/t Au over 5.2m;AX-25-764 - 1.37 g/t Au over 30.8m within 0.88 g/t Au over 55.3m, including 2.70 g/t Au over 6.0m;AX-25-766 - 1.26 g/t Au over 22.8m within 0.73 g/t Au over 50.3m;AX-25-769 - 0.66 g/t Au over 27.1m, including, a high-grade interval of 8.08 g/t Au over 1.4m;AX-25-770 - 0.96 g/t au over 16.3m, within 0.56 g/t Au over 45.3m, with high-grade intervals of 1.22 g/t Au over 4.3m and 2.32 g/t Au over 2.3m; and,AX-25-803 - 2.02 g/t Au over 16.3m within 1.64 g/t Au over 22.3m, including high-grade of 5.60 g/t Au over 4.4m (Note: assays pending from top 100m of hole)\"These results affirm the success of 2025 drilling to strategically target extensions of high-grade mineralized domains at Powerline and the down-dip extensions of the high-grade skarn-style mineralization Airstrip,\" said Tara Christie, Banyan President and CEO. \"In addition, results continue to demonstrate that the roughly 400 m gap between the two deposits is mineralized. These results also highlight the exploration potential with the deposits remaining open to expansion in various directions, demonstrated by the 300m step-out on the southwestern edge. We continue to look forward to the flow of results through February.\"Figure 1: Plan map of selected drillholes in this release. Section lines denoted in white, Mineral Resource Estimate (\"MRE\") conceptual pit wall in black, outline of indicated resource in yellow. Continued drilling at Airstrip indicates potential to extend ...

More updates from Banyan Gold Corp.