Business
Drilling Re-Starts at Alvalade VMS Project, Portugal
(TheNewswire) The new (9 th ) phase of drilling will initially test tar...

About this update from Avrupa Minerals Ltd.
[{"type":"text","content":"Drilling Re-Starts at Alvalade VMS Project, Portugal\n \n \n (TheNewswire)\n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n The new (9\n \n \n th\n \n \n ) phase of drilling will initially test\ntargets over 11-kilometer strike length between the historic Lousal\nand Caveira Mines;\n \n \n \n \n \n \n \n \n First hole is testing potential\nnorthwest extension of Lousal Mine orebody;\n \n \n \n \n \n \n \n \n Other holes will test targets at\nMonte da Bela Vista and the Caveira Mine area, and then several\nin-between VTEM geophysical anomalies.\n \n \n \n \n \n \n \n \n Following exploration targets’\ndrilling, the program will return to Central and Southern sectors at\nSesmarias.\n \n \n \n \n \n \n \n \n 10-12 drill holes expected, totaling\n+6,000 meters in Phase 9.\n \n \n \n \n \n \n Vancouver, BC –\n \n \n TheNewswire -\n \n \n Septem\n \n \n \n \n ber 15, 2022\n–\n \n \n Avrupa Minerals Ltd.\n \n \n (\n \n \n TSXV:\n \n \n AVU)\n \n \n (OTC:AVPMF)\n(FRANKFURT:8AM)\n \n \n announces that drilling\nre-started on the Alvalade Joint Venture Project in the Pyrite Belt of\nsouthern Portugal.  The program is a joint venture between Avrupa\nMinerals (“AVU” or “Company”) and Minas de Aguas Teñidas,\nS.A. (“Sandfire MATSA” or “MATSA”).  Avrupa continues to\noperate the project through the JV entity PorMining Lda.  To date, at\nSesmarias North, the Company completed 17 diamond drill holes,\ntotaling 8,900 meters, on six different fences along a strike length\nof 400 meters, as well as one further drill hole in the Caveira\nDistrict, totaling 614 meters (see news release of\n \n \n \n \n April 4,\n2022\n \n \n \n \n ).\n \n \n \n \n The new phase of drilling (9\n \n \n th\n \n \n overall) will\ninitially target anomalies located between the historic Lousal and\nCaveira Mines, over a strike length of approximately 11 kilometers.\n The first drill hole targets potential mineralization located\n300-400 meters northwest of the last reported mineralization in the\nLousal Mine.  Following this Lousal Northwest hole, depending on\nresults, we anticipate further testing in the Lousal area, as well as\ntargets at the Monte da Bela Vista prospect drilled by Avrupa in\n2012-2014, new targets in the Caveira Mine v...