Business
Aura Minerals Declares Commercial Production at Borborema
ROAD TOWN, British Virgin Islands, Sept. 23, 2025 (GLOBE NEWSWIRE) -- Aura Minerals Inc. (Nasdaq: AUGO) (B3: AURA33) (“Aura” or the “Company”) is pleased to ann

About this update from Aura Minerals Inc.
[{"type":"text","content":" ROAD TOWN, British Virgin Islands, Sept. 23, 2025 (GLOBE NEWSWIRE) -- Aura Minerals Inc. (Nasdaq: AUGO) (B3: AURA33) (“Aura” or the “Company”) is pleased to announce that commercial production has been achieved at its Borborema gold mine (“Borborema”) effective as of September 22, 2025. The Borborema mill is operating above 80% of the design capacity, processing 4,500 tonnes per day, with recoveries consistently above 90% and ranging up to 92%. Until now Borborema has already sold more than 10,000 ounces of Gold. Rodrigo Barbosa, Aura’s President, and CEO commented, “We are proud to announce commercial production at the Borborema mine, six months after startup, after 19 months of construction, and with no Lost Time Incidents (LTI). Like our Almas project, Borborema was delivered on time and on budget, reinforcing our commitment to operational excellence. This is our fifth operating mine and is expected to be our second-largest producer. As an upside, the project reserves are 812,000 Oz of gold, with Mineral Resources in Indicated category at approximately 1.18 million Oz of gold (exclusive of Mineral of Reserve). This provides strong potential for higher returns and increased reserves. Finally, Borborema exemplifies how Aura combines operational excellence, safety, and sustainability, using 100% treated greywater from Currais Novos, excluding rainwater, for all water needs at the mine and plant, reflecting our environmentally responsible approach”. About Borborema Borborema Project is a greenfield open pit gold project, located in the municipality of Currais Novos, Rio Grande do Norte state, in the northeast of Brazil. Aura completed a Feasibility Study in August 2023 for this project, which indicated anticipated production of 748,000 ounces of gold over an 11.3-year mine life, with possibilities for even greater output. This project has probable mineral reserves of 812,000 oz gold, and an exclusive Indicated mineral resource profile that consists of 37.7 Mt at average grades of 0.97 g/t Au for 1,178 koz of gold and 10.9 Mt at average grade of 1.13 g/t Au for 394 koz of inferred mineral resources. Aura have undertaken initial measures to start obtaining permits to move a road which crosses a portion of the deposit. Upon the road’s successful relocation, there would exist the potential to convert additional indicated mineral res...