Business

Argenta Silver Upsizes Drill Program to 25,000 m, Initiates Metallurgical and Key Technical Studies at El Quevar

Argenta Silver Corp. (TSXV: AGAG) (OTCQX: AGAGF) (FSE: T1K) ("Argenta" or the "Company") is pleased to announce a significant expansion of its planned 2025–2026 Summer Exploration Program, including an increase in diamond drilling to 25,000 meters, the initiation of metallurgical and other key technical studies at the El Quevar Project in Salta Province, Argentina. Following the closing of its C$23 million bought-deal private placement on January 22, 2026, the Company is fully funded to accelera

articleArgenta Silver CorpFebruary 3, 20268/company/argenta-silver-corp/news/argenta-silver-upsizes-drill-program-133000301
Argenta Silver Upsizes Drill Program to 25,000 m, Initiates Metallurgical and Key Technical Studies at El Quevar

About this update from Argenta Silver Corp

[{"type":"text","content":"TSX-V: AGAG","length":11,"tagName":"p","attribs":{}},{"type":"text","content":"VANCOUVER, BC, Feb. 3, 2026 /CNW/ - Argenta Silver Corp. (TSXV: AGAG) (OTCQX: AGAGF) (FSE: T1K) ("Argenta" or the "Company") is pleased to announce a significant expansion of its planned 2025–2026 Summer Exploration Program, including an increase in diamond drilling to 25,000 meters, the initiation of metallurgical and other key technical studies at the El Quevar Project in Salta Province, Argentina. Following the closing of its C$23 million bought-deal private placement on January 22, 2026, the Company is fully funded to accelerate exploration, technical de-risking, and market-related initiatives.","length":630,"tagName":"p"},{"type":"text","content":"Highlights:","length":11,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"Drill program expanded from 15,000 m to ≥25,000 m, reflecting increased confidence in system scale and upside potential.","length":125,"tagName":"p"}]},{"val":[{"type":"text","content":"Metallurgical testwork at the Yaxtché Deposit is scheduled to commence in Q1.","length":82,"tagName":"p"}]},{"val":[{"type":"text","content":"Exploration footprint materially enlarged, with surface mapping and sampling across most of Quevar South and areas of Quevar North.","length":131,"tagName":"p"}]},{"val":[{"type":"text","content":"Engagement of provider to run geophysical surveys across Quevar South and Quevar North, first ever geophysical studies in some of these areas.","length":147,"tagName":"p"}]},{"val":[{"type":"text","content":"Commencement of work to update the Environmental Baseline for the project.","length":79,"tagName":"p"}]},{"val":[{"type":"text","content":"AI-driven data integration and targeting to support data analysis and target generation.","length":88,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":652,"olType":false},{"type":"text","content":"Joaquin Marias, President, Chief Executive Officer, and Director of Argenta Silver Corp., commented:"We have a clear vision to advance El Quevar into more mature stages of exploration. The expansion of our summer drilling program from 15,000 to 25,000 meters, the initiation of metallurgical and other key technical studies, and our plan to more than double the original exploration footprint from 25...

More updates from Argenta Silver Corp

the El Quevar ProjectArgenta Silver CorpEl Quevar ProjectCompanyEnvironmental BaselineThe CompanySalta ProvinceArgentaQuevar NorthMetallurgical testwork