Business
Angkor's Mineral Subsidiary, Angkor Gold Corp. Extends Sampling in New Area of Andong Bor License, Cambodia
(TheNewswire) GRANDE PRAIRIE, ALBERTA – TheNewswire - (March 20, 2025): ANGK...

About this update from Angkor Resources Corp.
[{"type":"text","content":"Angkor's Mineral Subsidiary, Angkor Gold Corp. Extends Sampling in New Area of Andong Bor License, Cambodia\n\n\n (TheNewswire)\n \n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n GRANDE PRAIRIE, ALBERTA –\n \n\n TheNewswire -\n \n\n (March 20, 2025): ANGKOR RESOURCES CORP.\n(TSXV: ANK) (“ANGKOR”)\n \n\n announces its\nCambodian mineral subsidiary, Angkor Gold Corp. Co. Ltd. Cambodia\n(“AGC”) advanced auger soil sampling on the Andong Bor license in\na southeast area that had not yet received soil sampling and analysis.\n \n\n\n\n The teams, which just completed a ground magnetic\nsurvey over 90 line kilometers, went directly into a soil augering\nprogram in the southeast corner of the license.      The team hand\naugers to the water table, which at this time of year ranges from 2.5\nto 3.3 meters from surface.\n \n\n\n\n Each sample is labelled, GPS located, bagged, and\nreturned to main camp where further analysis will take place with XRF\n(x-ray fluorescence) equipment.   The previously explored areas of\nthe license have exhibited strong indications of copper, and copper\nporphyry systems have already been identified so using XRF analysis\nprovides a low cost, effective manner to identify what is in the soil\nto the water table.   Ultimately, the goal is to expand the\nmineralized areas already identified with this sampling and analysis\nto increase the mineralized zone.\n \n\n\n\n\n\n\n\n Click Image To View Full Size\n \n\n\n\n The summary report on the magnetic survey is pending.\n \n\n\n\n During the week, the provincial authorities from the\nMinistry of Mines and Energy visited the survey sites and completed a\nsuccessful inspection and review of the work plan on the license to\ndate. The Ministry officials were complimentary of Angkor’s method\nof operating, the use of local staff whenever possible, and the\ncontinued progress of the license activities.  Angkor staff reviewed\nthe work activities completed to date and cross referenced the\nrequirements for an upcoming renewal on the license.\n \n\n\n\n The license comes up for renewal in August of 2025,\nfollowing its initial three-year term.   Exploration licenses are\ngenerally granted with the first term being three years and then\nfollowed by two, two-year renewal te...