Business

Angkor Gold's Project Partner Drills 8.11g/t over 6.3m at Phum Syarung

Vancouver, British Columbia--(Newsfile Corp. - May 23, 2013) - ANGKOR GOLD CORP. (TSXV: ANK) ...

articleAngkor Resources Corp.May 23, 20135/company/angkor-resources-corp/news/angkor-golds-project-partner-drills-811gt-over-63m-at-phum-syarung
Angkor Gold's Project Partner Drills 8.11g/t over 6.3m at Phum Syarung

About this update from Angkor Resources Corp.

[{"type":"text","content":"\nAngkor Gold's Project Partner Drills 8.11g/t over 6.3m at Phum SyarungVancouver, British Columbia--(Newsfile Corp. - May 23, 2013) - ANGKOR GOLD CORP. (TSXV: ANK) (\"ANGKOR\") is pleased to announced that it has received results from the four diamond drill holes completed by Mesco Gold Ltd (\"Mesco\"). The drilling was carried out in March on the Phum Syarung prospect (\"PS\"), located within its Oyadao South Concession, Ratanakiri Province, Cambodia. In terms of the agreement with Mesco, Angkor retains a 10% NSR interest in the prospect.Mike Weeks, Angkor's CEO & Chairman, commented, \"The Mesco drill results confirm what we suspected: the deposit at PS is significantly larger than our initial drill results suggested.\" The following table shows the significant results from this drilling:Hole ID FROM TO INTERVAL m Au g/t Ag g/t Cu % Pb % Zn % PS13-020D 54.60 55.50 0.90 1.61 1.38 0.05 0.02 0.01 and 89.25 95.55 6.30 8.11 6.49 0.12 1.04 0.47 PS13-021D 135.55 142.75 7.20 0.38 0.31 0.00 0.03 0.04 PS13-022D 27.00 27.43 0.43 8.69 8.10 0.08 0.07 0.01 and 61.93 64.23 2.30 9.69 13.21 0.12 0.62 0.90 PS13-023D 185.00 186.80 0.70 1.54 79.4 1.07 0.87 0.01           The drilling conducted by Mesco confirms the high gold grades drilled by Angkor in 2012 and has extended the known mineralised strike length by over 100m to a total of 370m. The holes were logged and sampled by an Angkor geologist on secondment to Mesco. On Mesco's instructions, no samples were taken outside the immediate mineralized zone, no downhole surveys or core orientation studies were done, and no QA/QC blank or standard samples were inserted into the sequence. All drill holes in this program used HQ series for the uppermost 25-40m, and thereafter cores used triple tube wire line N series. All cores were saw-split over the sampling interval before sampling. One half of the split core was sent for assay, and the balance of the core over the zone of interest was taken for metallurgical testwork. The intact unmineralized core is stored by Mesco on site.The drilling showed evidence of small ore-dislocation parallel shears between the high grade polymetallic veins in hole 20 which were also noted in holes 21, 22 and 23; indicating a stacked shear system of which one of these dislocation faults was intersected in the depth extens...

More updates from Angkor Resources Corp.