Event is Live
Copper and Gold Mine Opportunity in Peru
Thu, Dec 28, 2023 : 02:30 AM
Hosted by [email protected]`s Org
Join Details
Join the event live on Thu, Dec 28, 2023 at 2:30 AM by returning to this page. You'll receive reminder emails before the event with a link to return here. After the event, you'll also receive an email with a link to the replay once it's available.
Powered by
Description
Compliments of the season to you, I would like to introduce two exceptional mining investment opportunities: The Quillacollo and Los Molles Mine Projects, both situated in the mineral-rich region of Peru and privately owned.
Quillacollo Mine Project
1. Location: Peru, covering 400 hectares.
2. Mineralization: Copper, Silver, and Gold.
• Grades: 6.0% Copper, 2.5 Oz Silver, 0.30-0.7 g/t Gold.
• Resource Estimate: 4.4 million TMS.
• Production Capacity: Annual output of 124,250 TMS.
3. Production Investment: $15.53 million.
4. Financial Outlook: Annual EBITDA of $23.4 million, NPV of $77.2 million.
Los Molles Mine Project
1. Location: Peru, covering 400 hectares.
2. Mineralization: Gold, with associated minerals.
• Grades: Gold-ferrous, mesothermal, filonian deposit.
• Resource Estimate: 243,632.35 ounces of gold.
• Production Capacity: 200 TMS per day, annual recovery of 39,352.48 ounces.
3. Production Investment: Total of $15 million.
4. Financial Outlook: Annual EBITDA of $42.876 million, NPV of $79.104 million.
Both projects offer substantial returns, characterized by high-grade mineralization and strategic locations. A suitable partnership will not only yield profitable outcomes but also contribute to sustainable mining practices.
Quillacollo Mine Project
1. Location: Peru, covering 400 hectares.
2. Mineralization: Copper, Silver, and Gold.
• Grades: 6.0% Copper, 2.5 Oz Silver, 0.30-0.7 g/t Gold.
• Resource Estimate: 4.4 million TMS.
• Production Capacity: Annual output of 124,250 TMS.
3. Production Investment: $15.53 million.
4. Financial Outlook: Annual EBITDA of $23.4 million, NPV of $77.2 million.
Los Molles Mine Project
1. Location: Peru, covering 400 hectares.
2. Mineralization: Gold, with associated minerals.
• Grades: Gold-ferrous, mesothermal, filonian deposit.
• Resource Estimate: 243,632.35 ounces of gold.
• Production Capacity: 200 TMS per day, annual recovery of 39,352.48 ounces.
3. Production Investment: Total of $15 million.
4. Financial Outlook: Annual EBITDA of $42.876 million, NPV of $79.104 million.
Both projects offer substantial returns, characterized by high-grade mineralization and strategic locations. A suitable partnership will not only yield profitable outcomes but also contribute to sustainable mining practices.
Featured Presenters
international
Ceo at Starcodes
Translate