    Table of content 1. FY 2025 Highlights 2. Operations Update 3. Financial Update 4. Guidance and Outlook 2

  3. Slide 3: Disclaimer

    Disclaimer You must read the following before continuing. The following applies to the information following this page, and you (each referred to hereafter as a “Recipient”) are advised to read this carefully before reading, accessing or making any other use of these materials. Any failure to comply

  4. Slide 4: FY 2025 Highlights

    FY 2025 Highlights Advancing into a fully integrated refined copper and gold producer

  5. Slide 5: Advancing into a fully integrated refined copper and gold producer

    Advancing into a fully integrated refined copper and gold producer FY 2025 Operational Highlights • This year’s performance reflects transitional dynamics, as we advanced toward integrated copper and gold operations while entering Phase 8, characterized by typically lower ore grades in the early yea

  6. Slide 6: Expansion projects highlights

    Expansion projects highlights Smelter and PMR Power Processing Plant • The smelter and PMR facility produced its first • Completed its LNG regasification facility and Processing plant The processing plant copper cathode, refined gold, and refined silver received its first LNG cargo in September 2025

  7. Slide 7: Operations Update

    Operations Update Mining on track; smelting and refining end the year strong

  8. Slide 8: Stronger ore output toward year-end amid anticipated cost increase

    Stronger ore output toward year-end amid anticipated cost increase Materials mined Quarterly materials mined 2.54  13% 2.28 2.23 2.24 78 77 70 68  9% 304 316 322 293 64 39 72 69 227 291 244 300 29 77 49 14 16 31 1 5 FY 2022 FY 2023 FY 2024 FY 2025 Q1 2025 Q2 2025 Q3 2025 Q4 2025 Ore (Mt) Waste (Mt

  9. Slide 9: Strengthening operational momentum driven by sequential quarterly production growth

    Strengthening operational momentum driven by sequential quarterly production growth Copper production (in concentrate) Gold production (in concentrate)1 0.31% 0.35% 0.37% 0.38% 0.17 0.12 0.13  16% 0.08 64 52 55 32  69% 37 27 27 16 Q1 2025 Q2 2025 Q3 2025 Q4 2025 Q1 2025 Q2 2025 Q3 2025 Q4 2025 Cop

  10. Slide 10: Surpassed full year concentrate production target

    Surpassed full year concentrate production target Copper production (in concentrate) Gold production (in concentrate) 0.65 0.76 0.56% 0.46% 0.53% 0.36% 0.48  87% 0.13 464  47% 803 395 731 312 463 209 103 FY 2022 FY 2023 FY 2024 FY 2025 FY 2022 FY 2023 FY 2024 FY 2025 Copper production (Mlbs) Coppe

  11. Slide 11: Maintaining strong safety performance across operations

    Maintaining strong safety performance across operations AMMN’s TRIFR relative to other mining companies 12-month rolling-average TRIFR (operations only) 7.64 Boliden 7.30 4.80 Sibanye Stillwater 4.36 4.12 Newcrest 3.25 3.23 Newmont 3.12 1.01 2.62 0.99 0.97 Gold Fields 2.62 0.95 0.94 0.94 0.94 0.95 2

  12. Slide 12: First year of smelting and refining operations with a strong finish after early challenges

    First year of smelting and refining operations with a strong finish after early challenges • Following the temporary shutdown and repairs of the Flash Converting Furnace (FCF) and sulfuric acid plant within the smelter complex in Q3 2025, we resumed operations and increased production rates at both

  13. Slide 13: Smelter and PMR progress as of March 26, 2026

    Smelter and PMR progress as of March 26, 2026 • 2025 marked key downstream milestones, with the successful Smelter video first production of copper cathode in March 2025 and first shipment in April 2025. • This was followed by the commencement of refined gold production and shipment in July 2025, an

  14. Slide 14: Financial Update

    Financial Update Smelter operations recover and strengthen in Q4, driving performance with support from concentrate sales

  15. Slide 15: Smelter operations recover and strengthen in Q4, driving performance with support from concentrate sales

    Smelter operations recover and strengthen in Q4, driving performance with support from concentrate sales Net sales EBITDA and EBITDA margin Net income and net income margin1 1,847 60% 33% 454 57% 1,301 51% 14% 299 433 806 1,057 545 258 416 778 155 231 233 390 355 354 279 9M 2025 Q4 2025 FY 2025 (175

  16. Slide 16: Financial highlights

    Financial highlights Production and sales data1 Financial results Units FY 2025 FY 2024 % Change Units FY 2025 FY 2024 % Change Mining operations Net sales US$m 1,847 2,664 (31%) Concentrate EBITDA US$m 1,057 1,426 (26%) Production dmt 446,563 755,083 (41%) Net income/(loss)4 US$m 258 642 (60%) Sale

  17. Slide 17: Guidance and Outlook

    Guidance and Outlook 2026 guidance unchanged: growth driven by higher ore grades and project ramp-up

  18. Slide 18: FY 2026 outlook and beyond

    FY 2026 outlook and beyond Global copper market Current price strength reflects supply disruptions, robust Chinese demand, Global copper mine production and primary demand (Mt) and weaker dollar. The 3-month copper price peaked at US$11,952/t on December 12. Wood Mackenzie raised its 2026–27 price f

  19. Slide 19: 2026 guidance unchanged: growth year driven by improved ore grades and projects ramp-up

    2026 guidance unchanged: growth year driven by improved ore grades and projects ramp-up FY 2026 FY 2026 guidance Mining operations guidance • The mining operations are expected to produce 900,000 dmt of Copper production in concentrate (Mlbs) 485 concentrate, containing 485 Mlbs (equivalent to 220,0

  20. Slide 20: Elang development project

    Elang development project Amman prepares for Super Giant project development Elang’s JORC reserves and resources estimates as of 31 Dec 2024 2025 Feasibility Study (“FS”) has been completed Grades Contained The Elang mine will utilize existing Batu Hijau infrastructure, including the mineral process