Ev Resources Limited · ASX:EVR

Ev Resources — Corporate Update (January 2024)

25 slides from Ev Resources's corporate update, January 2024

  1. Slide 1: Drill Programme Update: Peru Projects

    ASX: EVR Advancing Copper Exploration In The Americas Drill Programme Update: Peru Projects January 2024

  2. Slide 2: Disclaimer

    Disclaimer This presentation has been prepared by EV Resources Limited (“EVR”). The information Compliance Statement contained in this presentation is a professional opinion only and is given in good faith. The This presentation contains information extracted from ASX market announcements material i

  3. Slide 3: Peru – two drill permitted projects central to EVR's overall copper strategy

    Peru – two drill permitted projects central to EVR’s overall copper strategy Project Commodity Drill Status Drill permit granted (Dec 2023). Copper- Review of old data and drill PARAG Molybdenum core completed resulting in a revised geological model. Drill permit granted (Oct 2023). Mapping, samplin

  4. Slide 4: Parag Project permitted to drill - December 2023

    PARAG: COPPER-MOLYBDENUM Parag Project permitted to drill - December 2023 • The drill permits allow EVR to drill multiple holes from 20 platforms which will provide a year of constant work in 2024 while the company permits a larger programme. • The substantial body of drilling to date at Parag provi

  5. Slide 5: Parag Project – High Grade Copper-Molybdenum

    PARAG Parag Project – High Grade Copper-Molybdenum • EVR holds 70% of the Parag project, and the original owner retains a 30% free carried interest to a Bankable Feasibility Study, with a non diluted interest of 12% at production. • 76 Diamond Core holes have been drilled in Parag. We have the drill

  6. Slide 6: Major Mining Groups View The Region As Highly Prospective

    PARAG Major Mining Groups View The Region As Highly Prospective • Parag is surrounded by major mining groups drawn to the cluster of porphyry orebodies in a largely unexplored region of recent focus. • EVR has initiated discussions with their counterparts to attain a better understanding of the pros

  7. Slide 7: Parag Project: A new geological model defined

    PARAG Parag Project: A new geological model defined • The high-grade Parag Copper-Molybdenum project in Peru is an advanced copper project with substantial historical drilling, sampling and geophysics and is the focal point of the Company’s copper-focused activities. • During Q3, EVR’s team reviewed

  8. Slide 8: Exceptional Grades Warrant Further Exploration

    Exceptional Grades Warrant Further Exploration • The revised geological model reflects the impact of exceptionally high molybdenum grades which is to raise the grade of ore on a copper equivalent basis. Molybdenum will provide substantial by-product credits that reduce the costs of copper production

  9. Slide 9: 76 Diamond Holes Drilled To Date In Two Campaigns

    PARAG 76 Diamond Holes Drilled To Date In Two Campaigns 8

  10. Slide 10: Parag – Plan View and Cross Section (Copper Equivalent)

    Parag – Plan View and Cross Section (Copper Equivalent) Plot of historical drill holes in a SW-NE section shows Cu-Mo mineralization over a 1200m strike, a 500 m width, and open at depth with substantial targets for extensional and infill drilling. Note: The figures are generated with Cu Eq (Copper

  11. Slide 11: Molybdenum (Mo): Adding To Parag Value

    PARAG Molybdenum (Mo): Adding To Parag Value • Molybdenum is usually found in an ore known as molybdenite which can occur as primary mineralisation, but most commonly is associated with copper ores in mines in Peru, Chile, Mexico and the USA. China is the worlds largest producer, with 40% of the mar

  12. Slide 12: Copper and Molybdenum Grades shown in Cross Section

    PARAG Copper and Molybdenum Grades shown in Cross Section

  13. Slide 13: Parag – Hole VIE-01 – Sample Point A

    Parag – Hole VIE-01 – Sample Point A The core sampled at point A) is a monomictic breccia clast supported, with strongly altered quartz-sericite (green)-chlorite hornfels clasts. Spaces filled with chalcopyrite, molybdenite, pyrite and granular silica . Interval 4.5m-6.4m assays 1.9m @ 3.33%Cu, 0.59

  14. Slide 14: Parag – Hole VIE-01 – Sample Point B

    Parag – Hole VIE-01 – Sample Point B The core Sampled at point B) is a polimictic breccia clast supported, with strongly altered quartz-sericite (green)-chlorite angular hornfels and rounded felsic porphiritic clasts. Spaces filled with molibdenite cement, chalcopyrite, traces of bornite and granula

  15. Slide 15: Parag – Hole VIE-01 – Sample Point C

    Parag – Hole VIE-01 – Sample Point C The core sampled at point C). Shows Massive sulfide veins of pyrite, chalcopyrite cut polymictic breccia mostly forme m by hornfels fragments and sporadically fragments of felsic intrusive with porphyritic texture. Quartz-sericite (green)-chlorite alteration main

  16. Slide 16: Parag – Hole VIE-03 – Sample Point D

    Parag – Hole VIE-03 – Sample Point D The core shown at Sample point D) demonstrates crackle breccia in hornfels, chalcopyrite, pyrite, traces of bornite in veins and disseminated molybdenite. Strong to pervasive quartz-sericite-chlorite alteration and strong silicification in patches. Centimetric ma

  17. Slide 17: Parag – Hole VIE-03 – Sample Point E

    Parag – Hole VIE-03 – Sample Point E The core at Sample Point E) shows clast-supported breccia dominated by hornfels and sporadic fragments of felsic intrusive with porhyritic texture, filled with molybdenite and chalcopyrite and rock flour matrix. Strong silicification. Interval 51.9m-53.9m assays

  18. Slide 18: Parag – Hole VIE-03 – Sample Point F

    Parag – Hole VIE-03 – Sample Point F The core sampled at point F) shows Clast-supported breccia dominated by quartz monzonite equigranular intrusive and some fragments of hornfel, filled with molybdenite and chalcopyrite and rock flour matrix. Strong silicification and quarz-sericite pervasive alter

  19. Slide 19: Panoramic View of the Parag Project

    Panoramic View of the Parag Project • Planning for the for the upcoming drilling program is shown in red dots. • The blue polygon corresponds to the Viento mining right, which is where Phase 1 of drilling will be carried out (EV Resources). • Red polygons of the 3 additional mining concessions that

  20. Slide 20: The Parag Project - Numerous Undrilled Targets

    The Parag Project - Numerous Undrilled Targets • Areas marked in red show areas of outcropping breccia with reported drilling • Areas shown in orange correspond to areas of mineralized breccia that have not yet been evaluated or explored – and are considered future targets within the white dotted li

  21. Slide 21: The Parag Project location relative to communities

    The Parag Project location relative to communities SOURCE: GOOGLE EARTH

  22. Slide 22: Don Enrique: A Drill Ready Copper-Silver Project in Peru

    DON ENRIQUE Don Enrique: A Drill Ready Copper-Silver Project in Peru • EV Resources commenced exploration at the Don Enrique Project in Peru in late August 2022. • The Project is owned by EVR’s 50% owned subsidiary, Minera Montserrat SAC. • In total, 14 licenses cover 1,800Ha in an area 30km Northea

  23. Slide 23: Don Enrique is now ready to drill a compelling Chargeability Anomaly

    DON ENRIQUE Don Enrique is now ready to drill a compelling Chargeability Anomaly • An Induced Polarisation Survey carried out at the end of 2022 and at the beginning of 2023 has defined a compelling chargeability anomaly to be tested by an initial 2,000 metre diamond drilling campaign. • The chargea

  24. Slide 24: A 2000 metre diamond drill programme Planned for early 2024

    A 2000 metre diamond drill programme Planned for early 2024 • Channel sample results show elevated copper results over the Main Breccia Zone for a 550m strike extent. • 28 of the 108 samples demonstrated copper values greater than 0.30% and up to 3.22% Cu. • 17 of the samples recorded silver values

  25. Slide 25: Further Information

    ASX: EVR FURTHER INFORMATION Luke Martino Non-Executive Chairman Tel: +61 8 6489 0600 E: luke@EVResources.com.au Hugh Callaghan Managing Director Tel: +61 8 6489 0600 E: hugh@evresources.com.au

EV Resources — Corporate Update (January 2024) on 6ix