Megawide Construction Corporation · PSE:MWIDE

Megawide Construction — 9M2022 Earnings Presentation

21 slides from Megawide Construction's earnings presentation, Nov 15, 2022

  1. Slide 1: Reviewed Operating and Financial Results 9M2022

    Reviewed Operating and Financial Results 9M2022 15 November 2022

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation was prepared solely and exclusively for discussion purposes. This presentation and/or any part thereof may not be reproduced, disclosed or used without the prior written consent of Megawide Construction Corporation (the “Company”). This presentation, as well as discussio

  3. Slide 3: Operating Results – Consolidated Income Statement

    OPERATING RESULTS – CONSOLIDATED INCOME STATEMENT In PhP M 9M2022 9M2021 % Revenues 10,688.09 11,080.14 -4% Contract revenues 10,318.70 10,556.04 -2% Trading operations revenues 93.13 10.28 806% Terminal operations revenue 276.26 513.82 -46% Direct costs 9,135.93 9,186.40 -1% Contract cost 8,824.62

  4. Slide 4: Segment Breakdown

    SEGMENT BREAKDOWN REVENUE (Pmn) EBITDA (Pmn) NET INCOME / (LOSS) (Pmn) 11,080 10,688 2,246 514 2,230 276 10 152 93 5 428 547 344 10,556 1 107 10,319 2,089 1,811 1 445 452 -9 9M2022 9M2021 9M2022 -102 9M2021 -12 9M2022 9M2021 -19% 7% 1% 3% 96% 93% 81% Construction Merchandising Landport 5 -

  5. Slide 5: Margin Performance

    MARGIN PERFORMANCE 9M2022 9M2021 Gross Profit (Loss) Margin 18% 17% Construction 14% 15% Airport Merchandising 40% 24% Terminal Operations 8% 55% EBITDA Margin 22% 18% Construction 20% 17% Airport Merchandising 6% -84% Terminal Operations 55% 83% Net Income (Loss) Margin -8% -4% Construction 4% 4% A

  6. Slide 6: EPC: Pivoting to infrastructure and cycle-resiliency

    EPC: Pivoting to infrastructure and cycle-resiliency

  7. Slide 7: Stable Revenue Generation

    STABLE REVENUE GENERATION 9M2022 BREAKDOWN QUARTERLY PERFORMANCE (PhP M) Const Solutions 4,783 7% 4,342 3,799 3,792 3,773 3,616 3,572 3,563 3,430 3,421 3,280 3,247 2,568 2,551 EPC 93% 1,062 1Q19 2Q19 3Q19 4Q19 1Q20 2Q20 3Q20 4Q20* 1Q21 2Q21 3Q21 4Q21 1Q22 2Q22 3Q22 8

  8. Slide 8: Healthy and More Balanced Order Book

    HEALTHY AND MORE BALANCED ORDER BOOK ORDER BACKLOG SEGMENT 100 80.0 90 70.0 80 Residential, 31% Office, Commercial and Industrial, Order Book (PhP B) 68.4 60.0 44% 70 No. of Projects 60.0 58.2 50.0 60 52.4 50 50.1 50 37 41 40.0 40 39.1 30.0 30 32.6 43 38.5 20.0 20 30 10 21 21 21 10.0 Infra and Facil

  9. Slide 9: Future Direction

    Future Direction

  10. Slide 10: Malolos Clark Railway Project

    Malolos Clark Railway Project 11

  11. Slide 11: Metro Manila Subway Project

    Metro Manila Subway Project Est. Cost Package Section Scope (PhpB) 2.98 km with 2 North Ave. to East underground CP 102 17 Ave. stations at Quezon Ave. & East Ave. 6.58 km with 2 East Ave. to underground CP 103 38 Ortigas Ave. stations at Anonas and Katipunan 3.4 km with 2 Awarded to Tobismhima- Ort

  12. Slide 12: North-South Commuter Line

    North-South Commuter Line Est. Cost Package Section Scope (PhpB) 1.1km, elevated rail CP S-01 Solis to Blumentritt 13 with 1 station Blumentritt 7.9km, elevated rail, CP S-02 28 to Paco with 3 stations 7.9km, mostly CP S-03A Paco to Nichols elevated rail, 25 with 2 stations 6.1km, at-grade (1.4km) a

  13. Slide 13: Landport Operations

    Landport Operations

  14. Slide 14: Industry-Wide Low Occupancy

    INDUSTRY-WIDE LOW OCCUPANCY 9M2022 BREAKDOWN QUARTERLY RENTAL REVENUE (in Php M) PFRS 16 -6% Office Commercial 23 30 Retail 20 38% 194 19 45 33 25 116 102 82 71 53 64 Office 68% 1Q21 2Q21 3Q21 4Q21 1Q22 2Q22 3Q22 15

  15. Slide 15: Passenger Volume and Spending Boost

    Jan-21 52 53 Feb-21 45 Mar-21 Apr-21 26 41 May-21 51 Jun-21 47 Jul-21 28 Aug-21 35 Sep-21 51 Oct-21 Nov-21 62 80 Dec-21 50 Jan-22 60 Feb-22 87 Mar-22 Apr-22 103 AVERAGE DAILY FOOT TRAFFIC (‘000) May-22 Jun-22 113 117 120 Jul-22 Aug-22 123 Sep-22 113 39 Jan-21 Feb-21 36 35 Mar-21 21 Apr-21 35 May-21

  16. Slide 16: Future Direction

    Future Direction

  17. Slide 17: Developing An Organic Hub And Spoke Model

    Developing An Organic Hub And Spoke Model NORTH LUZON: NORTH LUZON BUILDING PRESENCE SOUTH METRO MANILA: BRT SYSTEM ROLL- OUT CENTRAL SOUTH CENTRAL LUZON: LUZON MM ENHANCING THE EXPERIENCE

  18. Slide 18: North Luzon: Building Presence

    NORTH LUZON: BUILDING PRESENCE 19

  19. Slide 19: South Metro Manila: BRT System Roll-out

    SOUTH METRO MANILA: BRT SYSTEM ROLL-OUT 20

  20. Slide 20: Central Luzon: Enhancing the Experience

    CENTRAL LUZON: ENHANCING THE EXPERIENCE 21

  21. Slide 21: Thank you

    hil MEGAWIDE <oanwe Philippines Thank you Contact us