  1. Slide 1: Advanced Lead-Zinc Resource Development

    Slide 1: Advanced Lead-Zinc Resource Development

    Advanced Lead-Zinc Resource Development December 2019

  2. Slide 2: Important Information

    Slide 2: Important Information

    Important Information Cautionary Statement on Forward Looking Information This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in any locality, state, country or other jurisdiction where such distribution, publ

  3. Slide 3: Location

    Slide 3: Location

    Location Australia^ 2nd Largest Lead Producer with the Largest Reserves 3rd Largest Zinc Producer, with the Largest Reserves 6th Largest Silver Producer, with the 3rd Largest Reserves Queensland* Australia's largest producer of copper, Lead and Zinc* Home to over 100 metalliferous mines www.vendetta

  4. Slide 4: Investment Highlights

    Slide 4: Investment Highlights

    Investment Highlights • 100% Ownership of Pegmont located in top rated mining jurisdiction Queensland Australia • No off-take encumbrances and +4 year royalty free front end • Lead and Zinc sustaining higher prices, Australian Dollar denominated costs provides great leverage to lead & zinc prices •

  5. Slide 5: Significant Value Levers

    Slide 5: Significant Value Levers

    Significant Value Levers • Tax Cuts : Australian Federal Announced Corporate Tax Reduction – a phased reduction from 30% to 25%, will be captured in future study updates, improving after tax NPV & IRR • Ore sorting test work : the potential to reduce CAPEX, and OPEX • Zone 5 : Inferred Mineral Resou

  6. Slide 6: PEA Metrics and Economic Summary

    Slide 6: PEA Metrics and Economic Summary

    PEA Metrics and Economic Summary PEA Outcomes – Production Metrics Base Case Spot Case 1.1 Mtpa Pre-Tax Post Tax Pre-Tax Post Tax Mill throughput (3,000 tpd) Pre-Production CAPEX $170M Initial Mine Life 10 years Sustaining CAPEX $59M 8.9 Mt Open Pit + PEA Mine Plan Inventory NPV at 8% $201M $124M $2

  7. Slide 7: AU$ Leverage to Lead & Zinc Prices

    Slide 7: AU$ Leverage to Lead & Zinc Prices

    AU$ Leverage to Lead & Zinc Prices $1.60 • Site OPEX in the PEA are Lead in AU$ denominated in Australian dollars $1.40 • As expectations for the Australian Dollar’s continued decline against +100% $1.20 PEA Lead Price USD $0.94/lb @ PEA exchange rate 0.75 AU$:US$ the US$ are realized, Pegmont Opera

  8. Slide 8: Lead & Zinc Project Comparisons

    Slide 8: Lead & Zinc Project Comparisons

    Lead & Zinc Project Comparisons After Tax IRR 10% 15% 20% 25% 30% 35% 0 VTT-Pegmont HRR-Woodlawn 200 FOM-McIlvenna Bay CNX-Nash Creek TV-Stratmat + Halfmile Total Capital (CA$) 400 RTH-Olza NZC-Prairie Creek 600 SLR - Florida Canyon IZN-West Desert SLR-Lik North & South 800 ZNX-Akie 1000 PEA BASE CA

  9. Slide 9: Next Steps

    Slide 9: Next Steps

    Next Steps • Continue to advance Corporate Initiatives including Australian Stock Exchange (ASX) listing • Post crushing ore sorting test work • Variability metallurgy test work on Main 1 Starter Pit - underway • Resource development drilling, targeting connecting Zone 3 underground panels • Explora

  10. Slide 10: Corporate Structure

    Slide 10: Corporate Structure

    Corporate Structure Shares Issued and Outstanding* 174,266,445 Warrants ($0.30 | exp. 09/20) 4,864,444 Warrants ($0.30 | exp. 10/20) 1,185,116 Warrants ($0.15 | exp. 06/21) 2,886,250 Warrants ($0.13 | exp. 07/22) 11,533,332 Options ($0.15 | exp. 12/21) 5,075,000 Options ($0.30 | exp. 10/22) 4,850,00

  11. Slide 11: Senior Management and Board of Directors

    Slide 11: Senior Management and Board of Directors

    Senior Management and Board of Directors Michael Williams Peter Voulgaris David Baker Doug Flegg B B.Eng.(Hons), MEngSci. MAusIMM, MAIG MBA CA MBA CFA President, CEO, Director Director, Qualified Person Director (independent) Director (independent) Over 25 years of experience as a senior Over 25 yea

  12. Slide 12: Consultants & Advisors

    Slide 12: Consultants & Advisors

    Consultants & Advisors David Esser Geoff Richmond Ocean Partners AARC Environmental B.Sc. (Hons) Geology, MAIG B.Sc. (Metallurgy) FAusiMM Concentrate Marketing Advisor Permitting Advisor Contract Exploration Manager Contract Chief Metallurgist Ocean Partners Holdings Limited is a AARC Environmental

  13. Slide 13: Infrastructure

    Slide 13: Infrastructure

    Infrastructure Mt Isa, Mining Centre Mt Isa, Glenore Lead Smelter Townsville, Korea Zinc Smelter Mt Isa, Typical Mine Haulage Road Train Mt Isa, Concentrate Rail Cars Natural Gas Pipeline, 16 km South www.vendettaminingcorp.com | TSXv : VTT 13

  14. Slide 14: Mineral Resource July 31, 2018

    Slide 14: Mineral Resource July 31, 2018

    Mineral Resource July 31, 2018 Area Classification Material type Tonnes (kt) Pb % Zn % Ag g/t Open Pit Resource Transition 1,111 4.9 2.3 8 By Confidence Indicated Sulphide 4,003 6.5 2.6 11 Open Pit TOTAL 5,114 6.2 2.6 11 Constrained Transition 1,829 5.2 2.0 7 Inferred Sulphide 2,567 5.0 2.3 10 46% I

  15. Slide 15: PEA Sensitivities

    Slide 15: PEA Sensitivities

    PEA Sensitivities Base Case Net Present Value Discount Rate Sensitivities NPV Before Tax NPV After Tax ($M) ($M) Undiscounted 411 288 6.0% 241 155 7.0% 220 139 8.0% 201 124 10.0% 167 99 12.0% 138 77 15.0% 103 50 Net Present Value at 8% ($ million) After Tax Sensitivities Lead Price Zinc Price ($ / l

  16. Slide 16: PEA Production Areas

    Slide 16: PEA Production Areas

    PEA Production Areas Schematic of Inclined or Stepped Room & Pillar (Atlas Copco, Mining Methods) www.vendettaminingcorp.com | TSXv : VTT 16

  17. Slide 17: PEA Infrastructure

    Slide 17: PEA Infrastructure

    PEA Infrastructure • Use of Osborne Mine Camp during construction of 300 person camp at Pegmont • Use of Osborne Mine Air Strip for Life of Operations • Concentrate transported into half height containers, Lead to Mt Isa by road and Zinc by road to Malbon where it is loaded onto train to Townsville

  18. Slide 18: Exploration targets

    Slide 18: Exploration targets

    Exploration targets Limited drilling outside of the Mineral Resource, immediate priority targets include: Bridge Zone Extensions Test Possible Z fold and Zone 3 extension into the Bridge Zone Bonanza BHZ “look-a-like”, potentially two moderately dipping lenses, same structural position as BHZ. The “

  19. Slide 19: Nebari Financing

    Slide 19: Nebari Financing

    Nebari Financing • Funded amount US$2,250,000 OID 12% Total Draw US$2,556,818 • 2019 projected interest minimum payments to Nebari US$55K • 2020 projected interest minimum payments to Nebari total US$104K • 2021 projected interest minimum payments to Nebari total US$46K • 2020-21 principle payments

  20. Slide 20: APPENDICES

    Slide 20: APPENDICES

    APPENDICES  Mount Isa – MacArthur Province  Geological Model : Broken Hill Type Model  Pegmont Geology  Metallurgy Test Work  PEA Details  TSX Lead & Zinc Project Comparisons  Lead & Zinc: Sustained Higher Prices www.vendettaminingcorp.com | TSXv : VTT 20

  21. Slide 21: Mt Isa – McArthur River Province

    Slide 21: Mt Isa – McArthur River Province

    Mt Isa – McArthur River Province Projects • Myrtle & Teena Projects (Teck) • Pegmont (Vendetta) Mines • McArthur River Mine (Glencore) Top Ten Largest Zinc Mines Globally • Century Mine (New Century Resources) - Tails Retreatment Project • Lady Loretta Mine – Glencore • George Fisher & Hilton Mines

  22. Slide 22: Geology Model : Broken Hill Type Deposits

    Slide 22: Geology Model : Broken Hill Type Deposits

    Geology Model : Broken Hill Type Deposits What is a Broken Hill Type Deposit • Not as common as VMS but with similarities. • Sedimentary basins overprinted by high-grade metamorphism (amphibolite or granulite) • Stacked lenses with low aspect ratio (longer & wider compared to thickness) • Mineralisa

  23. Slide 23: Pegmont Geology

    Slide 23: Pegmont Geology

    Pegmont Geology • Broken Hill Type Deposit : Mid Proterozoic stratiform, banded iron formation and garnet rich quartzite host, lead zinc metal zonation • Galena and Sphalerite mineralisation, banded semi massive to massive • Country rock is a high grade metamorphic quartzite grading out to gneisses

  24. Slide 24: Pegmont Geology

    Slide 24: Pegmont Geology

    Pegmont Geology Zones 1,2 & 3 Cross Section Looking North East, see map page 23 for location Bridge Zone Cross Section Looking South East, see map page 23 for location Garnet Quartzite Banded Iron Stone Sharp Contact Between Garnet Quartzite and Banded Iron Formation Coarse Sphalerite – Zone 2 Sulph

  25. Slide 25: Metallurgy Test Work

    Slide 25: Metallurgy Test Work

    Metallurgy Test Work Head Grades Bond Ball Lead Circuit Zinc Circuit (diluted) Area Test Type Mill Work Index kWh/t Pb Recovery Pb Con. Grade Zn Recovery Zn Con. Grade Pb % Zn % % % % % Sulphide Mineralization Zone 1 Locked Cycle 18.4 7.92 3.34 91.8 66.3 75.5 54.5 Zone 2 Locked Cycle 20.9 7.28 3.23

  26. Slide 26: Pegmont PEA Process flowsheet

    Slide 26: Pegmont PEA Process flowsheet

    Pegmont PEA Process flowsheet www.vendettaminingcorp.com | TSXv : VTT * 26

  27. Slide 27: Proposed Pegmont Site Layout

    Slide 27: Proposed Pegmont Site Layout

    Proposed Pegmont Site Layout Mine Office, Workshops & Fuel Final Waste Dump ROM Pad Covers BHZ & In-pit Tails Plant Site & Natural Gas Power Station Pit Stages Main 4 to 7 In-pit Waste Pit Stage Main 1 Dump In-Pit Tails Pit Stages Main 2 & 3 In-Pit Tails View Looking North East at Completion of Open

  28. Slide 28: PEA Capital Expenditure & Cost

    Slide 28: PEA Capital Expenditure & Cost

    PEA Capital Expenditure & Cost CAPITAL EXPENDITURE LIFE OF MINE OPERATING COST ESTIMATE Initial Sustaining Total Area Units Cost Area ($M) ($M) ($M) Open Pit Mining $/tonne mined $3.08 Site Infrastructure 39.6 1.2 40.8 (on and off site) Underground Mining $/tonne mined $50.00 Mineral Processing 69.9

  29. Slide 29: PEA Production Summary

    Slide 29: PEA Production Summary

    PEA Production Summary Tonnes Milled Zinc - Zn % Lead - Pb % Silver - Ag g/t 1,200,000 12.00 1,000,000 10.00 Diluted Feed Grade Tonnes Milled 800,000 8.00 600,000 6.00 400,000 4.00 200,000 2.00 - - 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 180,000,000 450,000 160,000,000 Zinc (lb) Lead (lb)

  30. Slide 30: TSX Lead & Zinc Project Comparisons

    Slide 30: TSX Lead & Zinc Project Comparisons

    TSX Lead & Zinc Project Comparisons Selected Projects – PEA Inventory, PFS and FS Reserve Comparison Predominately Open Pit ± Underground Highlighted 40 20% 35 18% 30 15% EQUITY TONNES (Mt) 25 13% LEAD + ZINC % 20 10% 15 8% 10 5% 5 3% 0 0% Proven Probable PEA Pb+Zn % Note : tonnes represents compani

  31. Slide 31: Zinc & Lead : Sustained Higher Prices

    Slide 31: Zinc & Lead : Sustained Higher Prices

    Zinc & Lead : Sustained Higher Prices + Mine closures/reductions since 2013 have removed about 15% of the global supply, 10 year high Lead & Zinc price February 16, 2018 + New Lead-Zinc mine projects have not responded to prices as estimated, 2019 will be 8th year of deficit + Chinese “Pollution Pre

  32. Slide 32: www.vendettaminingcorp.com

    Slide 32: www.vendettaminingcorp.com