    FORWARD-LOOKING INFORMATION Fortis includes forward-looking information in this presentation within the meaning of applicable Canadian securities laws and forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995 (collectively referred to as "forward-looki

  3. Slide 3: Fortis at a Glance

    FORTIS AT A GLANCE TSX/NYSE: FTS OUR VISION & STRATEGY: A Premium North American Utility Delivering a Cleaner Energy Future 95% 100% transmission and distribution assets regulated utility assets 9 regulated utilities $5.6 billion in Canada, U.S., and the Cayman Islands 2026F capital expenditures 9,9

  4. Slide 4: Our Common Ground

    OUR COMMON GROUND Provision of Safe Sustainable Growth Good Governance & Reliable Service Fortis Ranked #1 of 206 S&P/TSX companies Priority #1 Focused on Execution in The Globe & Mail 2025 Board Games • Health and safety of our employees, customers • Operational Excellence • Utilities operate withi

  5. Slide 5: Continued Focus on Safe & Reliable Service

    CONTINUED FOCUS ON SAFE & RELIABLE SERVICE All-Injury Average Electricity Customer Frequency Rate(1) Outage Duration (Hours) 1.83 4.3 4.2 4.3 1.30 3.8 2.3 2.0 2.0 1.9 1.9 2021 2022 2023 2024 2025 2021 2022 2023 2024 2025 USA Bureau of Labor Statistics Fortis(2) Electricity Canada and U.S. Energy For

  6. Slide 6: Focused on Affordability

    FOCUSED ON AFFORDABILITY Affordability Spotlight Affordability Initiatives Through operational efficiency, disciplined capital planning, and innovation, Fortis utilities are finding better ways to reduce costs and support customer affordability 1. Cost discipline and rate impact Optimizing how we pl

  7. Slide 7: Five-Year Plan at a Glance

    FIVE-YEAR PLAN AT A GLANCE CAPITAL PLAN DRIVEN BY TRANSMISSION INVESTMENTS Capital Rate Base Dividend Expenditures Growth Growth $28.8B 7% 4-6% 2026-2030 5-Year Annual Dividend Growth Capital Plan CAGR Guidance Extended to 2030 $2.8B 50 bps 4% Over Prior Over Prior Increase in Q4 2025 Capital Plan P

  8. Slide 8: Highly Executable Five-Year Capital Plan Supports Low-Risk Rate Base Growth of 7%

    HIGHLY EXECUTABLE FIVE-YEAR CAPITAL PLAN SUPPORTS LOW-RISK RATE BASE GROWTH OF 7% 2026 $5.6B Capital Plan Consolidated Annual Capital By Asset Type Rate Base Plan On Track ↑ $16B or 7% CAGR ✓ Major capital projects progressing $57.9B Transmission Distribution ✓ In June, the Roadrunner Reserve II 46%

  9. Slide 9: Approval Received for Tilbury LNG Expansion

    APPROVAL RECEIVED FOR TILBURY LNG EXPANSION REFLECTING INCREMENTAL OPPORTUNITY ABOVE AND BEYOND THE PLAN Tilbury 1B ✓ In July 2026, the Province of British Columbia issued an OIC approving the Phase 1B expansion of FortisBC Energy’s Tilbury LNG facility allowing total investment of ~$2.0 billion for

  10. Slide 10: Above and Beyond the Plan

    ABOVE AND BEYOND THE PLAN 2026-2030 2031-2035 Opportunities Opportunities to Expand Growth to Extend Growth ITC ITC • Customer Connections • LRTP Tranche 2.1 • LRTP Tranche 2.1 Competitively Bid Projects UNS Energy • Customer Connections • TEP Load Growth (e.g., data centers and • Future MISO LRTP/

  11. Slide 11: Balanced Approach to Funding Growth

    BALANCED APPROACH TO FUNDING GROWTH Cash from (1) Key Highlights Operations 59% • Consistent capital structure 5-Year expected over planning period Capital Plan $28.8B Equity • Equity funding reflects 11% (2) Corporation's DRIP at current participation levels and ESPP 2026-2030 • Funding plan suppor

  12. Slide 12: Investment-Grade Credit Ratings

    INVESTMENT-GRADE CREDIT RATINGS S&P FFO/Debt Credit Ratings (2) & Outlooks >12.0% 12.4% A (low) 11.6% A-(3) BBB+ Stable Stable Stable 2025A(1) 2026-2030F Avg. Key Credit Strengths Fitch FFO Leverage <6.2x Geographic and regulatory Strong business risk profile diversity 6.2x 5.9x 100% regulated – sta

  13. Slide 13: Recent Regulatory Activity

    RECENT REGULATORY ACTIVITY TEP General Rate Application • In June 2025, TEP filed a general rate application with the ACC requesting new rates effective September 1, 2026 • In February 2026, ACC Staff filed testimony recommending an allowed ROE at 9.75% and a 55% common equity component of capital s

  14. Slide 14: Three-Year Lookback

    THREE-YEAR LOOKBACK Adjusted EPS & Rate Base Adjusted Dividend Payout Ratio $42.4B 4 $3.53 100.0% $37.0B $39.0B 3.5 $3.09 $3.28 95.0% $34.1B 3 $2.78 90.0% 85.0% 2.5 78.1% 80.0% 2 73.9% 75.0% 1.5 72.7% 70.4% 70.0% 1 65.0% 0.5 60.0% 0 55.0% 2022 2023 2024 2025 2022 2023 2024 2025 Adjusted EPS Adjusted

  15. Slide 15: Total Shareholder Returns

    TOTAL SHAREHOLDER RETURNS Cumulative 20-Year Total Shareholder Return 666% Average Annual Total Shareholder Returns 440% 1-Year​ 29.3% 423% 5-Year​ 12.4% 10-Year​ 10.5%​ 20-Year​ 10.7% 2006 2011 2016 2021 2026 Fortis S&P/TSX Composite Index S&P/TSX Capped Utilities Index Note: Cumulative and average

  16. Slide 16: Dividend Guidance Supported by Long-Term Growth Strategy

    DIVIDEND GUIDANCE SUPPORTED BY LONG-TERM GROWTH STRATEGY 52 Years of Consecutive Increases in Dividends Paid 4-6% Annual Dividend Growth Guidance through 2030 73 75 77 79 81 83 85 87 89 91 93 95 97 99 01 03 05 07 09 11 13 15 17 19 21 23 25 16

  17. Slide 17: Why Invest in Fortis

    WHY INVEST IN FORTIS SUSTAINABLE GROWTH LOW-RISK FOCUSED ON EXECUTING SAFE, WELL-RUN UTILITIES Strong Robust Transparent Regulatory Constructive Strong Rate Base Transmission Funding & Geographic Regulatory Governance Growth Pipeline Plan Diversity Relationships Investments to 4-6% Investment-Grade

  18. Slide 18: Appendix

    \ a ~] Wavaver. Poors APPENDIX FORTIS...

  19. Slide 19: Table of Contents

    TABLE OF CONTENTS ITC Holdings 20-21 UNS Energy 22-24 Central Hudson 25-26 FortisBC 27-28 FortisAlberta 29-30 Other Electric 31-32 2026-2030 Capital Plan by Business Unit 33 Major Capital Projects 34 2025-2030 Rate Base by Business Unit 35 Sensitivity Exposure & Hedging 36 Other Ongoing Regulatory P

  20. Slide 20: ITC Overview

    ITC OVERVIEW FERC REGULATED ELECTRIC TRANSMISSION UTILITY 26,000 km $14.6 billion Lines of transmission 2026F rate base Assets in 8 U.S. States 23,502 MW Michigan and Iowa key states Peak demand 900 Fortis owns 80.1% dedicated employees Interest in ITC FERC Rate Regulated 10.73-11.41% Allowed ROE Co

  21. Slide 21: ITC Capital Investment Overview

    ITC CAPITAL INVESTMENT OVERVIEW Grid Security $4.4B Infrastructure Investments Rebuild, reliability, resiliency, system efficiencies, increased capacity, circuit overloads, pocket load growth New Interconnections $2.8B Major Capital Projects LRTP Tranches 1 & 2.1 and Big Cedar Load Expansion $9.8B I

  22. Slide 22: UNS Energy Overview

    UNS ENERGY OVERVIEW VERTICALLY INTEGRATED ELECTRIC AND GAS UTILITY 23,400 km $8.9 billion of electric T&D lines 2026F rate base 5,200 km 3,443 MW of natural gas T&D lines Generating Capacity 738,000 ACC & FERC Regulated electric and gas customers Cost of service/historical test year & FERC formula t

  23. Slide 23: UNS Energy Capital Investment Overview

    UNS ENERGY CAPITAL INVESTMENT OVERVIEW IT, General & Other $1.4B Energy Resources Expected natural gas, renewables and energy storage investments to support rising capacity demands and exit from coal Energy Resources $1.6B Distribution Infrastructure Grid resiliency and modernization $5.6B $1.9B Tra

  24. Slide 24: Springerville Coal-Fired Units Converted to Natural Gas

    SPRINGERVILLE COAL-FIRED GENERATING UNITS CONVERTED TO NATURAL GAS Springerville Natural Gas Conversion • TEP plans to convert 793 MW of Committed to a Coal-Free Generation Mix by 2032 coal-fired generation to natural gas generation with similar capacity by 2030 • The conversion will support custome

  25. Slide 25: Central Hudson Overview

    CENTRAL HUDSON OVERVIEW ELECTRIC AND GAS T&D UTILITY 15,400 km 1,300 of electric T&D lines dedicated employees 2,400 km $4.0 billion of natural gas T&D lines 2026F rate base New York State Public Service 315,000 electric customers Commission Regulated Cost of service on future test year 90,000 9.5%

  26. Slide 26: Central Hudson Capital Investment Overview

    CENTRAL HUDSON CAPITAL INVESTMENT OVERVIEW Transmission Infrastructure $1.6B Distribution Infrastructure Distribution automation and modernization $2.5B Distribution Infrastructure $600M IT, General & Other Building the workforce of the future Capital Plan 2026-2030 $300M Transmission Infrastructure

  27. Slide 27: FortisBC Overview

    FORTISBC OVERVIEW GAS LDC AND INTEGRATED ELECTRIC UTILITY 51,700 km 2,800 of natural gas T&D lines dedicated employees 7,400 km $8.7 billion of electric T&D lines 2026F rate base 1.1 million BCUC Regulated natural gas customers Cost of service with incentive mechanisms 199,000 9.65% Gas 45% electric

  28. Slide 28: FortisBC Capital Investment Overview

    FORTISBC CAPITAL INVESTMENT OVERVIEW IT, General & Other $2.5B Reliability & Integrity Investments Ongoing maintenance and includes customer growth and general plant investments $1.3B LNG Projects & Renewable Gases AMI Project Tilbury 1B(1) $4.9B LNG Tilbury LNG Storage Expansion Eagle Mountain Pipe

  29. Slide 29: FortisAlberta Overview

    FORTISALBERTA OVERVIEW ELECTRIC DISTRIBUTION UTILITY 91,100 km $4.8 billion distribution lines 2026F rate base 85% 615,000 of revenue derived from customers fixed-billing determinants 2,749 MW AUC Regulated peak demand performance-based rate-setting (PBR) 9.02% 37% 1,300 Allowed Equity dedicated emp

  30. Slide 30: FortisAlberta Capital Investment Overview

    FORTISALBERTA CAPITAL INVESTMENT OVERVIEW IT, General & Other $2.8B Distribution Infrastructure Safety and reliability of distribution assets, meter upgrades, pole management program, modernization $3.5B $700M IT, General & Other Capital Plan 2026-2030 Distribution Infrastructure 30

  31. Slide 31: Other Electric Overview

    OTHER ELECTRIC OVERVIEW ELECTRIC T&D UTILITIES 23,200 km Four of electric T&D lines regulated electric utilities(1) 477,000 Equity investment customers In Wataynikaneyap Partnership 1,400 Cost of Service dedicated employees regulation with future test year $3.7 billion 8.90% 42.9% 2026F rate base Al

  32. Slide 32: Other Electric Capital Investment Overview

    OTHER ELECTRIC CAPITAL INVESTMENT OVERVIEW IT, General & Other $1.1B Distribution Infrastructure Transmission $500M Generation Diversification $2.4B Infrastructure Capital Plan Distribution $500M Transmission Infrastructure Infrastructure 2026-2030 $300M IT, General & Other Generation Diversificatio

  33. Slide 33: 2026-2030 Capital Plan by Business Unit

    2026-2030 CAPITAL PLAN BY BUSINESS UNIT Capital Plan 2026-2030 ($MILLIONS) 2026F 2027F 2028F 2029F 2030F TOTAL Independent Electric Transmission ITC 1,874 1,898 2,008 2,083 1,980 9,843 U.S. Electric & Gas UNS Energy 1,281 1,014 940 1,413 983 5,631 Central Hudson 466 438 509 551 573 2,537 Total U.S.

  34. Slide 34: Major Capital Projects

    MAJOR CAPITAL PROJECTS 2026- Expected ($ Millions) 2025A 2030F Completion Date ITC Major Capital MISO LRTP Tranche 1(1) 173 1,812 2030 Projects 21% MISO LRTP Tranche 2.1(2) 8 529 Post-2030 Big Cedar Load Expansion 172 394 2028 $28.8B UNS Energy TEP Transmission Project - 608 2029 Springerville Natur

  35. Slide 35: 2025-2030 Rate Base by Business Unit

    2025-2030 RATE BASE BY BUSINESS UNIT Rate Base 5-YEAR CAGR TO ($BILLIONS) 2025A 2026F 2027F 2028F 2029F 2030F 2030 Independent Electric Transmission (1) ITC 13.9 14.6 15.9 17.1 18.4 19.8 8.1% U.S. Electric & Gas UNS Energy 8.4 8.9 9.6 10.2 11.0 11.5 7.2% Central Hudson 3.7 4.0 4.2 4.4 4.7 5.0 6.6% T

  36. Slide 36: Sensitivity Exposure & Hedging

    SENSITIVITY EXPOSURE & HEDGING Foreign Exchange ROE & Equity Ratio • Assumed USD:CAD FX rate of 1.35 for 2026-2030 Capital Plan ROE Equity +/- 25 bps +/- 100 bps • 65% of regulated earnings(1)/ 65% of capital plan in USD at U.S. & Cayman Islands utilities ITC $0.040 $0.035 • +/- $0.05 change in USD:

  37. Slide 37: Other Ongoing Regulatory Proceedings

    OTHER ONGOING REGULATORY PROCEEDINGS Transmission Incentives In 2021, FERC issued a supplemental NOPR proposing to eliminate the 50-bps RTO ROE incentive adder for transmission owners that have been RTO members for longer than three years; the timing and outcome of this proceeding are unknown Third

  38. Slide 38: Our Sustainability Strategy

    OUR SUSTAINABILITY STRATEGY GROUNDED IN BUSINESS FUNDAMENTALS SUSTAINABILITY PRIORITIES Integrating climate risk with Reducing emissions and Strengthening governance foundations business planning delivering cleaner energy and partnering with local communities 2026 Climate Resiliency Report • Achieve

  39. Slide 39: Cleaner Energy, Delivered Safely, Reliably & Affordably

    CLEANER ENERGY, DELIVERED SAFELY, RELIABLY & AFFORDABLY ~38% reduction in scope 1 GHG emissions since 2019 12,308 • GHG intensity of energy delivered has declined each year since 2019, reaching a record low in 2025 10,418 9,742 • Since 2019, coal generation declined 58% while 8,748 renewable generat

  40. Slide 40: Q2 2026 Sales Trends

    Q2 2026 SALES TRENDS CHANGE IN Q2 2026 vs. Q2 2025 ENERGY SALES SALES TRENDS N/A • Peak load up 3% mainly driven by warmer weather (1) • Higher average consumption by residential customers including the impact of +6% warmer weather, as well as higher industrial sales; on a weather normalized basis r

  41. Slide 41: Long-Term Debt Maturities

    LONG-TERM DEBT MATURITIES 10-Year Debt Maturities $2.5 $2.0 $1.5 billions $1.0 $0.5 $- 2026F 2027F 2028F 2029F 2030F 2031F 2032F 2033F 2034F 2035F (1) Non-Regulated Regulated Note: U.S. dollar-denominated debt translated at June 30, 2026 USD:CAD closing foreign exchange rate of 1.42. (1) Includes no

  42. Slide 42: Strong Investment-Grade Credit Ratings

    STRONG INVESTMENT-GRADE CREDIT RATINGS Company Fortis Inc. A-(1) A (low) BBB+ -(2) ITC Holdings Corp. A-(1) - - Baa2 ITC Regulated Subsidiaries A+ - - A1 TEP A- - - A3 Central Hudson BBB+ - BBB+ Baa1 FortisBC Energy - A - A3 FortisBC Electric - A (low) - Baa1 FortisAlberta A- A (low) - Baa1 Newfound

  43. Slide 43: Glossary

    GLOSSARY ACC Arizona Corporation Commission ITC Investment Holdings Inc., an indirect 80.1%-owned subsidiary of Fortis, together with its subsidiaries, AMI Advanced Metering Infrastructure ITC including International Transmission Company, Michigan Electric Transmission Company, LLC, ITC ATM At-the-m

Fortis — Investor Presentation (2026) on 6ix