  1. Slide 1: Tanami Site Tour

    CREATING VALUE & IMPROVING LIVES THROUGH SUSTAINABLE, RESPONSIBLE MINING Tanami Site Tour 13 NOVEMBER 2024

  2. Slide 2: Cautionary Statement Regarding Forward-Looking Statements, Including Outlook

    CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING STATEMENTS, INCLUDING OUTLOOK This presentation contains “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended, which are intended to

  3. Slide 3: Tanami Overview

    TANAMI OVERVIEW TIER 1 ASSET WITH SIGNIFICANT GROWTH POTENTIAL ▪ 855 employees1 and 1,420 contractors2; primarily fly-in fly-out operations ▪ Over 40-year history of production with first gold produced in 1983; Newmont acquired Tanami from Normandy in 2002 ▪ One underground mine at Dead Bullock Soak

  4. Slide 4: Tanami Underground: One of Australia's Largest Open Stope Mines

    Processing overview MINING TANAMI UNDERGROUND ONE OF AUSTRALIA’S LARGEST OPEN STOPE MINES ▪ Four mining areas at Dead Bullock Soak (DBS): Auron, Callie, Federation, Liberator ▪ Operation teams focus on mine development, mine services, paste fill, drill and blast and haulage ▪ Head grade ranging betw

  5. Slide 5: Underground Ventilation Management

    Processing overview MINING TANAMI UNDERGROUND UNDERGROUND VENTILATION MANAGEMENT ▪ Development depth of 1.7 kilometers and further expansion of 245 meters ▪ Significant heat is added to the system due to extreme surface temperatures in summer, ambient rock temperatures of 60 degrees Celsius, thermal

  6. Slide 6: Ground Support and Geotechnical

    Processing overview MINING TANAMI UNDERGROUND GROUND SUPPORT AND GEOTECHNICAL ▪ Dead Bullock Soak (DBS) has a well-established mining method, appropriate for the depth of the mine; this will be modified as the mine progresses deeper ▪ DBS has relatively good ground conditions and uses several types

  7. Slide 7: Processing Overview: Expansion Projects

    Processing P R O C E S S I Noverview G OVERVIEW EXPANSION PROJECTS: SIGNIFCANT INCREASE IN MILL CAPACITY ▪ Ore transported via road train 44 kilometers to processing plant at the Granites ▪ First mill expansion in 2017 increased mill capacity to 2.6 million tonnes per year ▪ Second expansion project

  8. Slide 8: Future Direction of Tanami: Exploration

    FUTURE DIRECTION OF TANAMI Processing EXPLORATION overview DELIVERING VALUE THROUGH SUSTAINED EXPLORATION SUCCESS ▪ Reserve & resource growth of nearly 150 percent since 2012 ▪ Growth case includes inventory and exploration upside extending life to 2047 ▪ Reinvigorating near-mine exploration at Dead

  9. Slide 9: Full Potential at Tanami

    FULL POTENTIAL AT TANAMI Diagnose Design Deliver Refresh TRANSFORMATIONAL SUCCESS INTO A TIER 1 ASSET ▪ Delivered over $400 million in Full Potential improvements at Tanami since 2015 (over $290 million delivered in the last 5 years alone) ▪ Improved site performance driven by Full Potential led to

  10. Slide 10: Technology & Innovation: Minestar Implementation

    TECHNOLOGY & INNOVATION: MINESTAR IMPLEMENTATION ENHANCED FLEET TRACKING, DATA CAPTURE, AND ACCURACY ▪ Launched in Q2 2024, Minestar Fleet Management System replaced the previous manual dispatch system with real-time fleet tracking and data capture ▪ Underground Wi-Fi network now tracks machine move

  11. Slide 11: Environmental and Social Overview

    ENVIRONMENTAL AND SOCIAL OVERVIEW MANAGING EXTREME WEATHER IMPACTS ON OPERATIONS ▪ Flooding in the Northern Territory is common during the wet season from November to April, impacting critical consumables delivery to site ▪ Newmont is working closely with the Northern Territory government on upgrade

  12. Slide 12: Tanami Expansion Overview

    TANAMI EXPANSION 2 OVERVIEW SECURES FUTURE AS A LONG-LIFE, LOW-COST TIER 1 PRODUCER Transforms Tanami into Additional 150 to 200 Reduction of operating a state-of-the-art crush thousand gold ounces costs by ~30 percent and hoist operation per year 1,460 METER DEEP SHAFT 86 METER HIGH HEADFRAME Deepe

  13. Slide 13: Tanami Expansion 2 Progress: Shaft Construction

    TANAMI EXPANSION 2 PROGRESS SHAFT CONSTRUCTION REMAINS CRITICAL PATH ▪ Lining of the upper shaft leg and 2018 mid shaft are complete; lining is Initial shaft pilot hole commenced underway in the lower shaft leg Transition to blind sink 2019 Blind sink to 212 meters ▪ Project remains on track for com

  14. Slide 14: Tanami Expansion 2 Progress: Lining Challenges

    TANAMI EXPANSION 2 PROGRESS SUCCESSFULLY ADDRESSED FOUR MAIN CHALLENGES TO IMPROVE LINING PERFORMANCE 1. OVERBREAK REMEDIATION Project remains on track for ▪ Overbreak requires substantially more commercial production in the ground support and concrete (ongoing) second half of 2027 ▪ Lower shaft bot

  15. Slide 15: Surface Works – Crusher Chamber Mid Shaft Station

    SURFACE WORKS – CRUSHER CHAMBER MID SHAFT STATION WINDER BUILDING START LAST 16 MONTHS CURRENT SIGNIFICANT ADVANCEMENT OVER THE

  16. Slide 16: Overview of Key Shaft Features

    OVERVIEW OF KEY SHAFT FEATURES SHAFT OVERVIEW Upper leg Lower leg MID SHAFT LOWER SHAFT

  17. Slide 17: Surface Facilities Overview

    SURFACE FACILITIES OVERVIEW COMPLETED FACILITIES IN PROGRESS & PLANNED FACILITIES ❑ Power plant expansion ▪ Process plant upgrade: increase current capacity to meet the ❑ Refrigeration plant increased 3.3Mpta throughput by increasing flow through the ❑ Bulk air cooler secondary ball mill (in design)

  18. Slide 18: Surface Facilities Overview

    SURFACE FACILITIES OVERVIEW POWER PLANT UPGRADE HEADFRAME, WINDERS AND ROPE UP FOR SHAFT LINING & EQUIPPING DBS CAMP STAGE 1 AND 2 ADMINISTRATION OFFICES BATCH PLANT WATER TREATMENT PLANT REFRIGERATION PLANT & BULK AIR COOLER

  19. Slide 19: TE2 Winder & Skips Overview

    TE2 WINDER & SKIPS OVERVIEW PRODUCTION WINDER ▪ ABB Koepe Friction winder ▪ Full automated; Full speed 16m/s ▪ One of the few ‘Safety Integrity Level’ rated winders in the world ▪ Regenerative with BESS PERSONNEL WINDER ▪ ABB Single Drum winder ▪ 623kW DC Motor with gearbox TE2 WINDER BUILDING and 3

  20. Slide 20: Materials Handling System Flow Sheet

    MATERIALS HANDLING SYSTEM FLOW SHEET Fixed Rock Breaker Coarse Ore Bin Primary 1 Crusher Fine Ore 2 Silo CV102B 5 Transfer Silo 6 CV101 7 (Slewing Conveyor) 3 CV103 4 CV102A

  21. Slide 21: Materials Handling System Flow Sheet

    MATERIALS HANDLING SYSTEM FLOW SHEET PRIMARY CRUSHER FINE ORE SILO 2 1 3 TRANSFER CONVEYOR 5 4 TRANSFER SILO AND SLEWING CONVEYOR 6 7