  1. Slide 1: Welcome to PSE&G's Third Party Supplier Electric Workshop

    Welcome to PSE&G’s Third Party Supplier Electric Workshop Last update 03/1/2022

  2. Slide 2: Purpose of Presentation

    Purpose of Presentation  To communicate essential information to Third Party Suppliers about participating in Retail Choice and Customer Account Services with PSE&G  To review process requirements and business rules so Third Party Suppliers can effectively do business with PSE&G

  3. Slide 3: How to become a Supplier

    How to become a Supplier  Becoming a New Jersey Third Party Supplier with PSE&G  Obtain License from NJBPU  Execute appropriate PJM certifications and agreements  Submit a Third Party Supplier Application  Execute the Confidentiality Agreement  Submit a Billing Services Agreement (if doing con

  4. Slide 4: Third Party Supplier Support (TPSS)

    Third Party Supplier Support (TPSS)

  5. Slide 5: Third Party Supplier Support

    Third Party Supplier Support  Business Relationship  Responsible for the flawless execution of retail choice changes in PSE&G service territory  Addressing all questions and issues that arise between PSE&G and third party suppliers  Communicating the latest retail choice information to suppliers

  6. Slide 6: Third Party Supplier Support

    Third Party Supplier Support  Website –  Information you need is on our website; check there first before calling TPSS https://nj.myaccount.pseg.com/myservicepublic/energychoiceandthird partysuppliers/thirdpartysuppliers TPS Problem Resolution  If you don’t know who to call, call TPSS and we will

  7. Slide 7: Third Party Supplier Support Contact Information

    Third Party Supplier Support TPSS Contact Information Phone 1-800-664-4761 Option 1 Or Email – TPSupplier@pseg.com NO CUSTOMER CALLS PLEASE

  8. Slide 8: Third Party Supplier Support

    Third Party Supplier Support  Organizational Structure  Dedicated, technically competent group who interact with Third Party Suppliers  Built around the one phone number/one phone call concept  Aligned with Customer Service’s Relationship Management Process to guarantee consistency of informatio

  9. Slide 9: Third Party Supplier Support

    Third Party Supplier Support  Examples of TPSS Interactions  Customer billing and usage issues  Measurement services  Remittance inquiries  EDI testing  Tariff interpretation/implementation  TPS training and coordination  Operating Manual updates  Dispute resolution

  10. Slide 10: TPS Electric Operating Manual

    Third Party Supplier Support  TPS Electric Operating Manual  Includes description of business and technical processes and is available on https://nj.myaccount.pseg.com/myservicepublic/energychoiceandthirdpart ysuppliers/-/media/174384e5a41f40fd9bdd3bfe45420db9.ashx  TPSS is responsible for update

  11. Slide 11: Tariff Standard Terms and Conditions

    Third Party Supplier Support  Tariff Standard Terms and Conditions  Defines relationship between PSE&G and Customer  Available on: https://nj.pseg.com/aboutpseg/regulatorypage/- /media/64E01807464143D6970E1D0C79B2437B.ashx  TPS should be familiar with section 14 and 15 as it contains Third Party

  12. Slide 12: Electronic Data Interchange

    Electronic Data Interchange

  13. Slide 13: Electronic Data Interchange

    Electronic Data Interchange  Objective of EDI Section  To communicate essential information to Third Party Suppliers about participating in Retail Choice with PSE&G in New Jersey  To explain the steps necessary to begin exchanging EDI transactions with PSE&G  To provide an overview of EDI and it

  14. Slide 14: What is EDI?

    Electronic Data Interchange  What is EDI?  Electronic Data Interchange is the computer-to- computer exchange of business documents in standard, machine-readable (ANSI X12) format  Why EDI?  To standardize the transfer of great numbers of documents, and to assure the accuracy of information  EDI

  15. Slide 15: Proven benefits of EDI

    Electronic Data Interchange  Proven benefits of EDI  Uniform communications with trading partners  Reduced errors, improved error detection  Better auditability and control  More timely communications  Rapid exchange of business information  Reduced paperwork and associated costs  One time d

  16. Slide 16: EDI Technical Requirements

    Electronic Data Interchange  EDI Technical Requirements  EDI documents are maintained on the NJBPU website: https://www.state.nj.us/bpu/about/divisions/energy/edi.html Translate data into ANSI X12 Standards  Must be able to transmit and receive these documents electronically using GISB Internet T

  17. Slide 17: How do you talk EDI?

    Electronic Data Interchange  How do you talk EDI?  814E, C, or D  814R  814ND  867  810  820  824

  18. Slide 18: EDI Documents

    Electronic Data Interchange  Documents  GISB - Connectivity between PSE&G and the TPS  814 - Information pertinent to account  Enrollment, Change, or Drop  Reinstatement  Notification of possible switch to dual billing  Advance notice to drop/switch billing options  867 - Usage information 

  19. Slide 19: Invoice Validation

    Electronic Data Interchange  810 Invoice Validation  Our customer bill will show supplier’s current charge, adjustment and total charge  Example: Current charge = $50.00 Adjustment = -$10.00 Total Charge = $40.00  Sales tax should be included in the TPS rate  The current charge and adjustment m

  20. Slide 20: Validation (continued)

    Electronic Data Interchange  810 Validation (continued)  The first accepted invoice closes the bill window  Negative amounts are accepted  PSE&G only accepts code ADJ000 for adjustments  EDI 810 may contain only one adjustment  EDI 810 with multiple adjustments will be rejected  Adjustment mu

  21. Slide 21: Invoice

    Electronic Data Interchange  810 Invoice  If rejected, suppliers can resubmit a correct 810 within the bill window.  If the TPS misses the bill window, the TPS should submit the missed charges during the next open bill window as an adjustment charge along with their current charges in the same ED

  22. Slide 22: EDI Enrollment Flow (example)

    Electronic Data Interchange EDI Enrollment Flow (example) Scenario: Customer Contacts TPS to Initiate TPS Selection EDI -- 814 Enrollment Request TPS PSE&G EDI -- 814 Enrollment Response Contact Customer

  23. Slide 23: Invoice to Payment Process Data Flow

    Electronic Data Interchange Invoice to Payment Process Data Flow Advanced Clearinghouse (ACH)Transaction Step 1: 867 Monthly Usage Step 2: 810 Invoice PSE&G TPS Step 3: 820 Remittance Advice Monthly Bill Payment Payment Step 4: Bank Customer

  24. Slide 24: Schedule – EDI Transactions

    SCHEDULE – EDI TRANSACTIONS  Inbound Transactions 814s (Enrollments, Changes, Drops, HU) – Last pickup is approximately 5:00 pm EST Monday through Sunday. Transactions received after 5:00 pm EST will be considered the next business day. 810s (Invoices) – Last pickup is approximately 2:30 pm EST Mon

  25. Slide 25: Customer Activation/Enrollment

    Customer Activation/Enrollment

  26. Slide 26: Customer Activation/Enrollment

    Customer Activation/Enrollment  PSE&G does not provide eligible customer lists  PSE&G does not provide TPS with sync lists  PSE&G does not maintain a DNC (Do not call) list

  27. Slide 27: Enrollment Package

    Customer Activation/Enrollment  Enrollment Package  Customer requests enrollment package by calling 1-800-436-PSEG (7734)  Enrollment package includes:  Choice Brochure  12 months usage data  Capacity and Transmission Obligations  PSE&G account number  Electric meter number  Billing rate 

  28. Slide 28: Enrollment Package (continued)

    Customer Activation/Enrollment  Enrollment Package (continued)  Enrollment Package includes:  NJBPU approved Electric Third Party Supplier list (updated quarterly)

  29. Slide 29: Customer Enrollment or Switch

    Customer Enrollment or Switch  Electric PODids begin with PE  A TPS can enroll one service or PODid at a time  The customer may have an account with multiple electric PODids  Suppliers can choose the service they want to serve  Only one active supplier per service or PODid

  30. Slide 30: Enrollment/Switching Process

    Customer Activation/Enrollment  Enrollment/Switching Process  Historical usage can be obtained by the customer or sent directly to a TPS with customer authorization  Facilitates the customer signing a contract  Internet sign up approved  TPS retains the contract and notifies PSE&G through an ED

  31. Slide 31: Enrollment/Switching Process

    Customer Activation/Enrollment  Enrollment/Switching Process  Enrollments based on last-in rule (most recent contract date and time on EDI enrollment request win)  Enrollment must be received at least 13 days prior to the current month’s meter reading date  Enrollment effective date occurs on a

  32. Slide 32: Activation

    Customer Activation/Enrollment  Activation  Steps required to enroll customers  NJBPU approved contract with customer is maintained by the Third Party Supplier  EDI 814 Enrollment request sent to PSE&G  Enrollment request must include valid customer’s PODid and the selected billing option (dual

  33. Slide 33: Activation: Validation (continued)

    Customer Activation/Enrollment  Activation  Validation (continued)  If customer’s balance is over 60 days old the enrollment response acceptance will contain field AMT*PJ indicating the number days of arrearage  If customer has a net meter the field REF*KY*NETMETER will appear in the enrollment

  34. Slide 34: Consolidated Billing Creditworthiness

    Customer Activation/Enrollment  Consolidated Billing Creditworthiness  Customers are qualified to enroll in the Consolidated Billing Option as long as they have a balance of less then 120 days old  Customers who have previously been switched or dropped to the Dual Billing Option due to arrearages

  35. Slide 35: Customer Drops TPS

    Customer Activation/Enrollment  Customer Drops TPS  Customers who call after the rescind period to return to PSE&G Basic Generation Service (BGS) will first be asked to call the TPS to drop the account  At the Customer’s request PSE&G may return the Customer to PSE&G’s BGS supply  PSE&G sends an

  36. Slide 36: TPS Drops Customer

    Customer Activation/Enrollment  TPS Drops Customer  TPS sends EDI transaction to PSE&G to drop customer  Must provide 30 days notice to individual customers  13 day rule for EDI Drop notification to PSE&G  90 days notice for dropping entire Rate Class  90 day notification to BPU, Advocate, PSE

  37. Slide 37: Net-Meter Accounts

    Net-Meter Accounts 3) PSEG

  38. Slide 38: Net-Meter accounts

    Net-Meter accounts  EDI 867HU  EDI 867HU response will have the field REF*KY*NETMETER to identify net meter accounts  867HU will have the NET usage and the IN (consumption) usage. If the customer generates more usage than consumed through the meter then NET usage will be reported as 0.  EDI 814E

  39. Slide 39: Net-Meter accounts

    Net-Meter accounts  EDI 814C  REF*KY*NETMETER is populated on 814C transactions. REF*TD field will be the following:  Change from net meter to net meter - REF*TD*REFKY*A  Change from regular meter to net meter -REF*TD*REFKY*A  Change from net meter to regular meter -REF*TD*REFKY*D Note: “A” ind

  40. Slide 40: Net-Meter accounts

    Net-Meter accounts  EDI 867MU  PM (detail) loop:  contains IN (consumption) usage which is identified with QD (actual) and KA (estimate)  Contains OUT (generation) usage which is identified with 87 (actual) and 9H (estimate)  SU (summary) loop:  contains NET usage which is identified with QD (

  41. Slide 41: Net-Meter accounts

    Net-Meter accounts  EDI 867MU  BB (billed) loop:  Contains billable usage for the start and end dates in the 867MU transaction. NOTE – this may not be the actual usage billed to the customer due to excess generation in previous months.  If the generation is greater than consumption for the start

  42. Slide 42: Net-Meter accounts

    Net-Meter accounts  EDI 867IU  PM (detail) loop:  First PM loop contains IN (consumption) usage which is identified with QD (actual) and KA (estimate) for each hour  Second PM loop contains OUT (generation) usage which is identified with 87 (actual) and 9H (estimate) for each hour  BO (summary)

  43. Slide 43: Net-Meter accounts

    Net-Meter accounts  EDI 867IU  BB (billed) loop:  Contains billable usage for the start and end dates in the 867IU transaction. NOTE – this may not be the actual usage billed to the customer due to excess generation in previous months.  If the generation is greater than consumption for the start

  44. Slide 44: Net-Meter accounts: General Information

    Net-Meter accounts  General Information  The net meter annual period will begin the month the customer is enrolled with a third party supplier.  The customer has an once in a lifetime option to change the anniversary month. If the customer chooses to exercise this option, we will notify the suppl

  45. Slide 45: How to bill a net meter customer

    Net-Meter accounts  How to bill a net meter customer  Scenario 1 – IN usage always greater than OUT usage  if the IN usage is always greater than the OUT usage then supplier should bill the usage in the BB loop of the usage transaction.

  46. Slide 46: How to bill a net meter customer

    Net-Meter accounts  How to bill a net meter customer  Scenario 2 – IN usage is not always greater than OUT usage  First month:  if the IN usage is greater than the OUT usage then supplier should bill the usage in the BB loop of the usage transaction.  Second month: 1. if the IN usage is greater

  47. Slide 47: How to bill a net meter customer

    Net-Meter accounts  How to bill a net meter customer  Third month :  if second month was scenario 2 and in third month the IN usage is greater than the OUT usage then supplier should apply the excess KWH to the usage in the BB loop of the usage transaction. This will provide the supplier with the

  48. Slide 48: Additional Resources for Net Metering

    Net-Meter accounts  Additional Resources for Net Metering  http://www.njcleanenergy.com/renewable-energy/program-updates-and- background-information/solar-transition/solar-market-faqs  PSE&G Electric Tariff: section 15 includes information regarding net metering: https://pseg.com/family/pseandg/t

  49. Slide 49: PSE&G Consolidated Bill

    PSE&G Consolidated Bill 3) PSEG

  50. Slide 50: Customer Billing Information

    PSE&G Consolidated Bill  Customer Billing Information  Customer sees the “price-to-compare” on their bill (prorated)  The “price-to-compare” is made up of basic generation service and transmission costs  If a customer decides to shop, they must contract with a Third Party Supplier based on appro

  51. Slide 51: PSE&G is Bill Ready

    PSE&G Consolidated Bill  PSE&G is BILL READY  PSE&G will provide TPS with monthly or hourly customer usage information via EDI  Within 48 hours, TPS provides PSE&G with calculated energy charges in an 810 invoice  PSE&G will include these charges on the LDC bill  Do not send PSE&G non energy re

  52. Slide 52: PSE&G Consolidated Bill

    PSE&G Consolidated Bill  A TPS is required to send residential kWh and unit price via the rolling text page (EDI 810 PID segment)  PSE&G bill-ready consolidated bill will include up to one rolling TPS page at no charge to the TPS  PSE&G will assume TPS receivables if the customer qualifies for Co

  53. Slide 53: Consolidated Bill

    PSE&G Consolidated Bill  Consolidated Bill  Included, at a minimum, will be the TPS’s name, telephone number, current charges, adjustment, total charges and rolling page information (kWh, unit price, message)  With PSE&G’s agreement, the TPS’s logo can be included provided it meets requirements 

  54. Slide 54: Rolling Page

    PSE&G Consolidated Bill  Rolling Page  What happens if there are errors?  If the billing data is valid but the rolling page text contains an error, the charges will still be processed and an EDI 824 will be sent to the TPS advising of the text error  Is the window for returning the 810 the same?

  55. Slide 55: TPS's Logo

    PSE&G Consolidated Bill  TPS’s Logo  What are the conditions to have a TPS logo printed on the PSE&G bill?  The logo must be provided to PSE&G in advance to enable sufficient time for testing and implementation  The logo must be provided in JPEG and TIF format

  56. Slide 56: TPS's Logo

    PSE&G Consolidated Bill  TPS’s Logo  What are the conditions to have a TPS logo printed on the PSE&G bill?  The dimensions for the logo cannot exceed:  Width: 1.17 inches  Length: .68 inches  The logo will be printed in black and white  The logo will be the same for all customers

  57. Slide 57: Bill Inserts

    PSE&G Consolidated Bill  Bill Inserts  Communication and approval will be coordinated through TPSS  PSE&G may allot up to 3 inserting slots per month for use by the TPS  Contained in the bills of residential customers that are currently supplied by the respective TPS  PSE&G will need the propos

  58. Slide 58: Consolidated Billing Switch ("Drop") to Dual Billing

    Consolidated Billing Switch (“Drop”) to Dual Billing

  59. Slide 59: Creditworthiness – Switch "Drop" to Dual

    Creditworthiness – Switch “Drop” to Dual  A customer is entitled to receive a consolidated bill if the billing party determines that the customer is creditworthy (see Enrollment slides)  PSE&G will inform the customer on the enrollment letter that failure to pay bills on time will result in being

  60. Slide 60: Creditworthiness – Switch "Drop" to Dual

    Creditworthiness – Switch “Drop” to Dual  The supplier will be informed via EDI (814C) of the switch “drop” to dual billing  The customer will be informed via letter of the switch “drop” to dual billing  The switch date to dual billing will begin on the following scheduled meter reading date (plu

  61. Slide 61: Account Receivables

    Account Receivables 3) PSEG

  62. Slide 62: PSE&G Remittance

    PSE&G Remittance  If PSE&G provides consolidated billing service, PSE&G shall remit to the TPS all undisputed TPS energy charges by the 20th day from the accepted EDI invoice  PSE&G shall make payments of funds to the TPS by ACH to the bank designated by the TPS found on the TPS Application sent t

  63. Slide 63: Disputed Charges

    Disputed Charges  Customer Billing Disputes  Once PSE&G receives a customer billing dispute, the TPS will be provided with a minimum of one week to contact the customer to resolve the billing dispute. Additional time may be granted if required on a case by case basis.  PSE&G will notify the TPS t

  64. Slide 64: Disputed Charges

    Disputed Charges  Customer Billing Disputes (continued)  If the TPS plans to send a refund check to the customer then the TPS would have to communicate to PSE&G that a check for a specific amount will be sent to the customer within a specific timeframe as the resolution. If the customer contacts P

  65. Slide 65: Measurement – Usage Data

    Measurement — Usage Data 3) PSEG

  66. Slide 66: Measurement – Usage Data

    Measurement – Usage Data  Existing types of meters  Watthour (includes bi-directional)  Demand Register  Time of Day  Interval

  67. Slide 67: Measurement: Net-Metering Set Up

    Measurement  Net-Metering Set Up  A Bi-Directional Meter (Digital) measures the IN (consumed) and OUT (generated) kilowatt hour usage on a monthly basis  An Interval Device Recorder measures the IN and OUT kilowatt hour usage separately on an hourly basis

  68. Slide 68: Rates with Interval Meters

    Measurement – Usage Data Rates with Interval Meters  HTS  LPLP  Some LPLS (Some - based on customer’s capacity load – See Electric Tariff)

  69. Slide 69: Interval Data Options

    Measurement – Usage Data  Interval Data Options  A TPS will receive hourly interval data soon after the monthly meter reading date for their interval metered customers  Data will be sent via EDI (867)  Suppliers can request hourly historical data via email at no charge  Suppliers must maintain

  70. Slide 70: Historical Usage Requests

    Measurement – Usage Data  Historical Usage Requests  Monthly historical usage will be sent in all Customer Enrollment Packages (paper copy). Up to 12 months of data will be provided.  A TPS can request monthly historical usage for a customer via EDI 814HU. Up to 15 months of usage will be provide

  71. Slide 71: Historical Usage Requests

    Measurement – Usage Data  Historical Usage Requests  Historical interval data requests  PSE&G will provide historical interval data via email to a TPS request. It is the supplier’s responsibility to obtain written consent from the customer.  Up to 24 months of data will be provided for each mete

  72. Slide 72: Load Profiles and Capacity Obligations

    Load Profiles and Capacity Obligations

  73. Slide 73: Load Profiles

    Load Profiles  An estimate of how a customer uses energy each hour of the day  Used in the settlement process to determine the hourly usage of your customers who do not have hourly metering installed at their facilities  Dynamic load profiling – profiles produced daily  One load profile per rate

  74. Slide 74: Capacity Transmission Obligation

    Capacity Transmission Obligation  Consistent with PJM zonal obligation  Transmission Load Obligation  Information on website: https://nj.myaccount.pseg.com/myservicepublic/energychoiceandthirdpartysup pliers/energychoicedocuments  Types of customers  Customers without demand meters  Customers

  75. Slide 75: Capacity Transmission Obligation

    Capacity Transmission Obligation  Calculations (adhere to PJM principles)  Impact on customer  Impact on Third Party Supplier  Component of Price-to-Compare  Peak Load set in June  Capacity Obligation usually adjusted in January, June and October  Transmission Load Obligation adjusted in Janu

  76. Slide 76: Active Load Management

    Active Load Management  Types  PSE&G Policy  Impact on Third Party Supplier Obligations

  77. Slide 77: Energy Supply Acquisition and Operations (ESA&O)

    Energy Supply Acquisition and Operations (ESA&O)

  78. Slide 78: Energy Supply Acquisition and Operations

    Energy Supply Acquisition and Operations  Responsibilities  TPS enrollment and accreditation  Capacity and Transmission Obligations  Load estimation/scheduling  Settlement/reconciliation  TPS invoicing/payments  Energy Settlement  Phone: 973-430-8055  Email: settlements@pseg.com

  79. Slide 79: Creditworthiness

    Energy Supply Acquisition and Operations  Creditworthiness  No additional credit requirements for suppliers with investment grade bond rating  For all others, alternative credit arrangements in an amount calculated in accordance with the “Creditworthiness Standards for Suppliers” in Appendix B1,

  80. Slide 80: Capacity and Transmission Obligations

    Energy Supply Acquisition and Operations  Capacity and Transmission Obligations  “Per customer” peak load allocations are established on an annual basis and submitted to PJM via the eCapacity system 2 to 5 days prior to the operating day  Capacity and Transmission Obligations are settled and bill

  81. Slide 81: Load Estimating/Scheduling

    Energy Supply Acquisition and Operations  Load Estimating/Scheduling  TPS may submit it’s forecast energy obligation to PSE&G by noon day-ahead via the PSE&G private website  Hourly load estimated reported to PJM via eSchedules  Interval meters  Dynamic Load Profiles  Adjusted for losses

  82. Slide 82: Settlement and Reconciliation

    Energy Supply Acquisition and Operations  Settlement and Reconciliation  PSE&G will provide PJM with information regarding the TPS’s customer usage once all meters are read  PJM conducts reconciliation billing based on this information  PJM will make customer usage adjustments beyond the 60-day

  83. Slide 83: Scheduling Coordinators

    Energy Supply Acquisition and Operations  Scheduling Coordinators  A TPS may authorize an Agent, called a Scheduling Coordinator, to act on it’s behalf in the Retail Settlement Operations functions  TPS retains primary responsibility for satisfying the requirements of the TPS agreement  A Schedu

  84. Slide 84: Scheduling Coordinator Model

    Energy Supply Acquisition and Operations Scheduling Coordinator Model RAA obligates TPS/LSE/Principal Signed by Scheduling Coordinator/Agent SC signs on behalf of TPS/LSE TPS/LSE Licensed by BPU Scheduling Coordinator/Agent Supply/Settlement Arrangements (eSchedules/eCap) Meets Prudential Requiremen

  85. Slide 85: TPS Invoicing/Payments

    Energy Supply Acquisition and Operations  TPS Invoicing/Payments  ESA&O will render monthly invoices reflecting transaction fees, metering charges and other charges  PSE&G reserves the right to “net” receivables and payables  All payments must be made by ACH wire transfer to JP Morgan Chase bank

  86. Slide 86: Dispute Resolution

    Energy Supply Acquisition and Operations  Dispute Resolution  TPS to notify ESA&O Manager –Energy Supply Admin in writing, within 20 days from the due date of the invoice of any TPS billing disputes  All disputes will be addressed promptly and in accordance with the provisions in the TPS Agreemen

  87. Slide 87: Thank You

    The End Thank You 3) PSEG