Ev Resources Limited · ASX:EVR
Ev Resources — Hidden Gems webinar (November 2023)
15 slides from Ev Resources's conference presentation, Nov 24, 2023
Slide 1: Presentation to Hidden Gems webinar
ASX:EVR Advancing copper exploration in Peru Presentation to Hidden Gems webinar 24th November 2023
Slide 2: Disclaimer
Disclaimer This presentation has been prepared by EV Resources Limited (“EVR”). The information Compliance Statement contained in this presentation is a professional opinion only and is given in good faith. The This presentation contains information extracted from ASX market announcements material i
Slide 3: Corporate Snapshot
Corporate Snapshot EVR 12 Month Share Price and Volumes $0.025 70,000,000 Shares on Issue 954.6million 60,000,000 $0.020 Options on Issue 108.3 million @ $0.045 50,000,000 $0.015 52-week trading range 0.01 – 0.026 40,000,000 $0.010 30,000,000 Market Capitalisation ($A) $10.5 million 20,000,000 Cash
Slide 4: Why Copper? Deficits are looming and a barrier to "Net Zero"
Why Copper? Deficits are looming and a barrier to “Net Zero” • Incremental market expansion to reach cumulative growth of 20% by 2035¹ • Lack of new projects pushing market into a supply deficit, which looms as a barrier to the mass adoption of EV’s and the ability of nation’s globally to meet renew
Slide 5: Peru is a Tier 1 copper jurisdiction with infrastructure
Peru is a Tier 1 copper jurisdiction with infrastructure • In 2022, Peru produced 2.44 million tonnes of copper, which is an increase of 4.8% on 2021 Global Copper Production (2021) % Share 27% • Peru’s fast-growing economy is one of Latin America’s top performers, with 18 years of macroeconomic and
Slide 6: Two potentially globally significant copper projects
Two potentially globally Completed significant Works Near term market copper projects Project Commodity catalysts A 2000 metre drill programme starts shortly to test a substantial chargeability Mapping, sampling, anomaly. Don Enrique Copper-Silver geophysics completed and a drilling licence is grant
Slide 7: Don Enrique: A drill ready copper-silver project
Don Enrique: A drill ready copper-silver project • The Project is owned by EVR’s 50% owned subsidiary, Minera Montserrat SAC. • In total, 14 licences cover 1,800Ha in an area 30km Northeast of Jauja and approximately 260km from the nation’s capital, Lima. • EVR holds an option to purchase the remain
Slide 8: A 2000 metre diamond drill programme will start by year end
A 2000 metre diamond drill programme will start by year end • Channel sample results show elevated copper results over the Main Breccia Zone for a 550m strike extent. • 28 of the 108 samples demonstrated copper values greater than 0.30% and up to 3.22% Cu. • 17 of the samples recorded silver values
Slide 9: Parag – High Grade Copper-Molybdenum
Parag – High Grade Copper- Molybdenum • Parag is a copper project in a district of substantial clustered copper porphyry orebodies. • EVR holds 70% of the Parag project, and the original owner retains a 30% free carried interest to a BFS, with a non diluted interest of 12% at production. • 76 Diamon
Slide 10: 76 diamond holes drilled to date in two campaigns
76 diamond holes drilled to date in two campaigns 10
Slide 11: Selected drill holes
Selected drill holes • Drilling to date shows exceptionally high molybdenum by-product grades • Molybdenum prices at US$25.23/lb are 6.36x higher than copper prices at 26/10/2023 • Molybdenum by product grades in copper orebodies seldom exceed 0.03% and most pure molybdenum orebodies run at grades o
Slide 12: Parag – plan view and cross section (Copper Equivalent)
Parag – plan view and cross section (Copper Equivalent) Plot of historical drill holes in a SW-NE section shows Cu-Mo mineralization over a 1200m strike, 500 m width, and open at depth with substantial targets for extensional and infill drilling. Porphyry clasts in the drill core suggest potential f
Slide 13: Numerous Undrilled Targets
Numerous Undrilled Targets • Areas marked in red show areas of outcropping breccia with reported drilling • Areas shown in orange correspond to areas of mineralized breccia that have not yet been evaluated or explored – and are considered future targets within the white dotted lines • Red dots are t
Slide 14: Near-term catalysts
Near-term catalysts • 2,000m diamond core drill campaign ready to start early December at Don Enrique • Application pending for additional ground at Don Enrique to include the substantial chargeability anomaly trending to the North West • Multiple phase drill programs for 10-12,000m of diamond core
Slide 15: Contacts
Contacts Managing Director Hugh Callaghan Email hugh@evresources.com.au Telephone +1 770 203 3276 Perth Office 311-313 Hay Street, Subiaco, WA 6008, AUSTRALIA Email info@evresources.com.au Telephone +61 8 6489 0600 15