Slide 3: Corporate Summary
Corporate Summary SHARES OUTSTANDING: 223,036,470 Management / Directors / Advisors SHARES FULLY DILUTED: 275,517,729 Matt A. Turner, B.Sc. President, CEO and Director MARKET CAPITALIZATION: C$24,000,000 Manuel Estrada, B.Sc. COO WORKING CAPITAL: ~C$1,200,000 Larry Donaldson, CA CFO CORPORATE DEBT:
Slide 4: Company Highlights
COMPANY HIGHLIGHTS • Rockhaven’s road accessible Klaza project is one of Yukon’s highest grade, plus one million ounce gold deposits • Robust PEA with a Post-Tax NPV(5%) of C$378 million and an IRR of 37% ($1,450/oz Au & $17/oz Ag) • Klaza Deposit is 100% owned and royalty free • District scale land
Slide 5: Greenfields Discovery within the +15 Moz Au Dawson Gold Belt
GREENFIELDS DISCOVERY WITHIN THE +15 Moz Au DAWSON GOLD BELT Access Road to Klaza Camp Klaza Deposit TSX-V:RK OTC:RKHNF 5
Slide 6: Property Geology
PROPERTY GEOLOGY TSX-V:RK OTC:RKHNF 6
Slide 7: Property Geology Detailed
PROPERTY GEOLOGY DETAILED TSX-V:RK OTC:RKHNF 7
Slide 8: Property Ownership
PROPERTY OWNERSHIP • 100% owned by Rockhaven with no underlying royalties on resource areas • Property covers 287 sq kms • 1,273 of the total 1,478 claims are unencumbered by royalties or interests • Claims have been acquired patiently over time and in-line with our growing knowledge of the district
Slide 9: High-Grade Epithermal Gold-Silver Mineralization
HIGH-GRADE EPITHERMAL GOLD-SILVER MINERALIZATION + 94.09 g/t gold, 545 g/t silver, 2.86% lead and 4.21% zinc over 2.63 m KL-17-401 + Represents the diamond drill hole sample length. True widths are estimated to be approximately 80- 90% of the interval. Please see Rockhaven Press Release dated Octobe
Slide 10: Klaza Project Mineral Resource Estimate
KLAZA PROJECT MINERAL RESOURCE ESTIMATE Klaza Property - Total Inferred and Indicated Mineral Resource Estimate Summary1 Grade Contained Metal Category Tonnes Au Ag Pb Zn Au EQ4 Au Ag Pb Zn Au EQ4 (kt) (g/t) (g/t) (%) (%) (g/t) (koz) (koz) (klb) (klb) (koz) Indicated 5 Pit- Constrained2,3 2,447 5.3
Slide 11: Klaza Deposit Block Model
KLAZA DEPOSIT BLOCK MODEL Central Klaza Central Klaza: 325 m below surface 6.70 m grading 11.90 g/t gold Central Klaza: 450 m below surface Western Klaza: 250 m below surface 2.00 m grading 3.18 g/t gold and 1.46 m grading 15.38 g/t gold, 741 g/t silver 43.52 g/t silver Deepest Drill Intersection in
Slide 12: 2020 PEA Highlights
2020 PEA HIGHLIGHTS • NPV(5%) – After-tax C$378 m & Pre-tax C$529 million ($1450 gold, $17 silver, CAD:USD 0.72) • IRR – 37% After-tax & 45% Pre-tax • Leverage to $1,740 gold – After-tax NPV(5%) of C$540 million and IRR of 49% • Opex – LOM cash costs of $613/oz AuEq* AISC of $875/oz AuEQ* • Initial
Slide 13: 2020 PEA Details
2020 PEA DETAILS • Study completed by AMC Mining Consultants (Canada) Ltd. (mineral resource, mining, infrastructure and financial analysis), Blue Coast Metallurgy Ltd. (metallurgy and processing) and Knight Piesold Ltd (tailings). • Combined Open Pit (contractor) & UG (owner-operator) mine with a 1
Slide 14: Klaza Project – PEA Surface Overview
KLAZA PROJECT – PEA SURFACE OVERVIEW BRX Western BRX Portal Mill Area KLAZA Tailings Storage Open Pits: 1.2 Mt mined containing approximately: 90,000 oz gold, 1.3 Moz Investors should be cautioned that the preliminary economic assessment (PEA) is preliminary in nature, that it includes inferred mine
Slide 15: Klaza 2020 PEA – Mine Plan
KLAZA 2020 PEA – MINE PLAN Open Pits: 1.2 Mt mined containing approximately: 90,000 oz gold, 1.3 Moz silver, 11.1 Mlbs lead, and 18.1 Mlbs zinc Central BRX UG, 1.3 Mt mined containing approximately: 69,000 oz gold, 4.0 Moz silver, 25.6 Mlbs lead, and 26.4 Mlbs zinc Western BRX UG, 2.4Mt mined contai
Slide 16: 2020 PEA Summary
2020 PEA SUMMARY Unit July 2020 Unit July 2020 PEA PEA Total mineralized rock kt 7,464 Total net revenue C$M 1,975 Total waste production kt 10,130 Project capital costs C$M 244 Gold grade1 g/t 3.4 Sustaining capital costs C$M 114 Silver grade1 g/t 79 Operating costs (total) C$M 834 Lead grade 1 % 0
Slide 17: Production Summary
PRODUCTION SUMMARY Annual Payable Metal Production TOTAL 1 2 3 4 5 6 7 8 9 10 11 12 Gold (oz) 751,472 48,656 58,572 93,011 98,195 93,775 82,318 80,087 62,401 49,947 45,485 26,433 12,592 Silver (oz) 13,799,820 588,268 765,112 1,645,459 1,499,457 1,544,120 1,430,480 1,560,272 1,145,208 1,031,574 1,133
Slide 18: Simplified Processing Flow Sheet
SIMPLIFIED PROCESSING FLOW SHEET Lead (1.1% Mass Pull) Acacia Leach 59.8% Pb 60% Pb Sequential Flotation Crushing & Grinding 5,957 g/t Ag 4,815 g/t Ag 129.9 g/t Au 15.7 g/t Au 1,900 tpd Zinc 95% Au Recovery • High recovery of all metals to (2.2% Mass Pull) 86% to Doré three separate concentrates 48.
Slide 19: 2020 PEA Sensitivities
2020 PEA SENSITIVITIES Post-Tax Sensitivities -20% Base Case +20% Variable Unit Value NPV IRR Value NPV IRR Value NPV IRR Gold US$/oz $1,160 $211 24% $1,450 $1,740 $540 49% Silver US$/oz $13.60 $343 35% $17.00 $378 37% $20.40 $407 39% Mining Cost $/t $44.1 $417 39% $55.14 $66.2 $334 34% Processing C
Slide 20: 2021 Catalysts
2021 CATALYSTS Exploration drilling on high-grade vein and porphyry targets: • Rusk – 2.6 sq. km arsenic-in-soil anomaly with newly (2020) identified vein discoveries • Kelly/Etzel-Cyprus Porphyry – Porphyry and bulk tonnage targets adjacent to Klaza vein field • Western BRX Extension to explore exp
Slide 21: 2021 Infill Drilling
2021 INFILL DRILLING • Infill drilling of the Klaza Deposit will focus on upgrading inferred resources into indicated resources • A total of 5,000 m in 33 holes is planned for 2021 • Previous upgrading was done at a low cost ($4/ounce) • This drilling will also support additional metallurgical test
Slide 22: Rusk Target – 2021 Follow-up on New Discovery
RUSK TARGET – 2021 FOLLOW-UP ON NEW DISCOVERY A Cross- A’ Section A A’ For additional information about the 2020 Klaza property and the Klaza property Preliminary Economic Assessment, TSX-V:RK OTC:RKHNF please see Rockhaven’s technical report with an effective date of July 10 2020 and titled, “Techn
Slide 23: 2020 Discoveries at the Rusk Target
2020 DISCOVERIES AT THE RUSK TARGET 2020 Drill Highlights* from the Rusk Target Include: 16.35 g/t gold, 321 g/t silver, 1.98% lead and 1.01% zinc over 0.63 m 16.15 g/t gold, 581 g/t silver, 2.06% lead and 1.26% zinc over 0.50 m 2.10 g/t gold, 657 g/t silver, 12.98% lead and 6.17% zinc over 1.00 m 2
Slide 24: Company Goals
COMPANY GOALS • Continued increase in overall resources • Infill drilling for conversion of remaining inferred resources • Trade-off study to evaluate off-site shipping of arsenopyrite concentrate • Accelerated engineering, metallurgy & permitting studies • Pre-feasibility study and advancement into
Slide 25: Thank You!
Contact Info: Matt Turner Phone: 604-688-2568 E-mail: mturner@rockhavenresources.com Website: www.rockhavenresources.com Thank You! TSX-V:RK OTC:RKHNF