Slide 1: Integrated service logistics to overcome every offshore challenge
Integrated service logistics to overcome every offshore challenge.
Slide 2: For maximum yield, overcome a sea of challenges
For maximum yield, overcome a sea of challenges. The new generation of offshore wind farms is located far from shore, which means: Increased travel time for spare parts and technicians Significant wave heights Unstable weather Plants and wind conditions turbines continue to increase in size
Slide 3: Integrated service logistics are the solution
Integrated service logistics are the solution. SOV Jack-Up Vessel Helicopter CTV Floating warehouse and hub with For heavy component Fast service response in Flexible transport for walk-to-work turbine access exchange difficult weather conditions diverse service tasks
Slide 4: SOV
SOV Service Operation Vessels (SOVs) are able to stay on-site for up to four weeks, for significantly diminished transport and transfer time. Innovative features make them the most effective way to service far-from-shore wind power plants. 60 people can live on board 420 m2 warehouse for spare parts
Slide 5: Jack-Up Vessel
Jack-Up Vessel Jack-Up Vessels are self-elevating platforms used for complex heavy-lift tasks such as main bearing, gearbox, and blade exchanges – giving you peace of mind, whatever your asset size. Can lift up to 400 tons Heavy-lift operations can begin 2 weeks from contract confirmation Lifting he
Slide 6: Helicopters
Helicopters Helicopters are used with other vessels for fast and wave-independent transfers directly to the top of the turbine, and enable a range of useful service tasks, including the transfer of technicians or spare parts and tools. 6x faster than a CTV 12x faster than an SOV Can operate in 88 km
Slide 7: CTVs
CTVs Used for a variety of service tasks including transfer and transport, Crew Transfer Vessels (CTVs) are multipurpose, high-speed vessels designed for wind parks closer to shore. Continually updated tech Backbone of offshore service Versatile service ability
Slide 8: siemens.com/wind-service
For further information on these logistics solutions, please don’t hesitate to ask any of the Siemens Gamesa booth assistants. Visit the Siemens Gamesa Renewable Energy site to learn more about the diverse range of reliable wind energy services that will optimize your assets. siemens.com/wind-servic