Eminence Minerals Limited · ASX:EMA
Eminence Minerals — Investor Presentation
22 slides from Eminence Minerals's investor presentation
Slide 1: Exploring the Future of Rare Earths
Exploring the Future of Rare Earths ASX : EMA
Slide 2: Disclaimer
DISCLAIMER Summary Information This document contains a summary of information about Eminence Minerals Limited (“Eminence” Not Financial Product Advice This document does not constitute financial product advice or take into account your “EMA” or “the Company”) and its activities that is current as a
Slide 3: Led by an Experienced Resources Board
Led by an Experienced Resources Board Agha Shahzad Pervez Ming Tsen (Vincent) Chye Ali Raza Anthony Hills Non-Executive Chairman Non-Executive Director Non-Executive Director Chief Executive Officer Mr Pervez is a seasoned corporate Mr Chye is an experienced corporate Mr Raza is a highly accomplishe
Slide 4: Campo Grande: A Rare Earth Hub
CAMPO GRANDE: A RARE EARTH HUB • Mineralisation Potential The project demonstrates significant potential for hosting Rare Earth Elements (REE) deposits, with a particular emphasis on Medium Rare Earth Elements (MREE) within ionic clays, saprolite, and hard rock formations. • Strategic Location Locat
Slide 5: Campo Grande Project
CAMPO GRANDE PROJECT Location and Infrastructure District-Scale Rare Earth Opportunity: ~1,755 km² tenure across 97 licenses, providing significant scale for exploration and discovery Strategic Location in Emerging REE Province: Positioned within a prospective rare earth region in Bahia, Brazil. One
Slide 6: Strategic Positioning in Brazilian Rare Earth Province
Strategic Positioning in Brazilian Rare Earth Province Campo Grande Project v • Adjacent to Brazilian Rare Earths (ASX:BRE): Positioned alongside one of the most active rare earth explorers in Brazil, with multiple high- grade discoveries across the region and a market cap of ~$1.1B. • Located Withi
Slide 7: Exploration Highlights
Exploration Highlights Campo Grande Project v • High-Grade Surface Results: Surface sampling has returned results up to 17,346 ppm TREO, confirming strong rare earth mineralisation at surface • Consistent Drill Intercepts: Drilling has delivered broad intercepts including 15m @ 3,910 ppm TREO from s
Slide 8: Rare Earth Market & Strategic Positioning
Rare Earth Market & Strategic Positioning Campo Grande Project Global Rare Earth Reserves by Country (2026) Rank Country Reserves (Mt REO) • Critical to Energy Transition: Rare earth elements are essential for 1 China 44.0 permanent magnets used in electric vehicles, wind turbines and advanced techn
Slide 9: Significant Exploration Upside
Significant Exploration Upside Campo Grande Project • Large Underexplored Landholding: Current drilling has covered only a small portion of the ~1,755 km² project area, highlighting substantial exploration upside • Multiple Targets Identified: Several priority target areas defined across the project
Slide 10: Next Phase of Exploration
Next Phase of Exploration Campo Grande Project Targeted & Disciplined forward plan: Three high-priority target areas have been defined for systematic auger drilling campaigns across interpreted extensions of the Sulista, Monte Alto and Amargosa rare earth corridors associated with neighbouring tenur
Slide 11: Next Phase of Exploration
Next Phase of Exploration Campo Grande Project Lateritic Index indications High LI values effectively map "windows" of advanced weathering where the primary rock has been sufficiently degraded to release REE ions, which are then adsorbed onto the surfaces of neoformed clays (halloysite and kaolinite
Slide 12: Mata da Corda Project
MATA DA CORDA PROJECT A Strategic Critical Minerals District Tier-1 Jurisdiction. A District-Scale Project located in Minas Gerais, Brazil’s premier mining state ~970 km² landholding within the Alto Paranaíba Alkaline Province Strong Titanium Mineralisation: Drilling has returned intercepts includin
Slide 13: Mata da Corda Project
MATA DA CORDA PROJECT A Strategic Critical Minerals District Titanium Dioxide Potential REE Potential
Slide 14: Mata da Corda Project: Next steps
MATA DA CORDA PROJECT Next steps Composite sample amalgamation from previous drilling campaigns. Initial sample characterization for mineralization guidance. Metallurgical testwork & physical beneficiation feasibility for classification/separation/extraction. Determination of conceptual resource and
Slide 15: Hamersley Iron Ore Project
HAMERSLEY IRON ORE PROJECT One of the largest undeveloped hematite resources in the Pilbara wholly owned by Eminence
Slide 16: Hamersley Project
HAMERSLEY PROJECT Strategically located Located in Tier-1 Iron Overview: Strategically positioned in the Pilbara, Western Australia, one of the world’s premiere iron ore regions Existing JORC Mineral Resource Defined: Total resource of 343.2Mt, including inferred 108.5Mt @ 58% Fe DSO, highlighting n
Slide 17: Hamersley Project: A Significant Iron Ore Resource
HAMERSLEY PROJECT A SIGNIFICANT IRON ORE RESORUCE • Mining lease M47/1450; 10.36 km2 with an inferred large scale iron ore resource. Over 22,000m of drilling completed. • Adjacent exploration tenement E47/4987: 3.18 km2, & significant tonnage upgrade & resource upside potential based on similar detr
Slide 18: Hamersley Project: Multiple value pathways
HAMERSLEY PROJECT Multiple value pathways FMG Solomon is in late-life management. Hub production of 66 MTPA, down from 75MTPA in 2023. And predicted to stabilise at 49 MTPA from 2027 onwards. FMG require strategic resource backfill. Acquisition potential: Red Hawk Mining (ASX:RHK). Similar distance
Slide 19: Hamersley Project
HAMERSLEY PROJE | ICeNTRAL PRLBARA NORTH IRON ORE PTY LTD ‘CENTRAL PRLRARA SOUTH IRON ORE PTY LTD | Doncwesrer meracs Pry Lr ZERO TNO EXPLORATION PTY UNITED. (Ce PRBARAINFRASTRUCTURE PTY LTD. EMINENCE MINERALS
Slide 20: Hamersley Project
HAMERSLEY PROJECT For Information relating to past Eminence Minerals (ASX:EMA) announcements dated 6 June 2024, Please refer to announcements on ASX Announcements - Eminence Minerals
Slide 21: Hamersley Project
HAMERSLEY PROJECT • Top left, view from the south eastern corner of M47/1450 • Top right, survey peg from absolute corner • Bottom left, looking north west from Ute vantage
Slide 22: Thank you
Thank you For more information, please contact: Anthony Hills – Chief Executive Officer T: +61 8 6109 6689 E: info@eminenceminerals.com.au ASX : EMA W: eminenceminerals.com.au