    Disclaimer The views expressed here contain information derived from publicly available sources that have not been independently verified. No representation or warranty is made as to the accuracy, completeness or reliability of the information. Any forward looking information in this presentation ha

  3. Slide 3: Agenda

    Agenda • Energy Coal CSG overview • HSEC • Markets • Financials • Ingwe 3

  4. Slide 4: Energy Coal CSG overview

    Energy Coal CSG overview

  5. Slide 5: Our Energy Coal business

    Our Energy Coal business 14,000 + People 10 Operating assets 4 Continents 84,000,000 tonnes Coal produced, more than 2,000PJ 850,000,000 tonnes Dirt moved 30 products to 100+ customers via 300+ marketing contracts 5

  6. Slide 6: BHP Billiton Energy Coal Position (2001 → 2005)

    BHP Billiton Energy Coal Position (2001 → 2005) 33 Mtpa (56%) ≈3 Mtpa 26 Mtpa New NewMexico Mexico (2%) 12→→ 15 12 15Mtpa Mtpa (42%) Colombia Colombia 44→→ 99Mtpa Mtpa Pt PtArutmin Arutmin 9.8 → 9.8 → 14.5 14.5Mtpa Mtpa QLD/NSW QLD/NSWCoal Coal 33→→ 44Mtpa Mtpa Ingwe Ingwe Hunter HunterValley Valley

  7. Slide 7: Energy Coal organisation

    Energy Coal organisation President PresidentEnergy EnergyCoal Coal Mahomed MahomedSeedat Seedat Chief Asset AssetLeader ChiefCommercial Commercial President President&&COO COO President President&&COO COO Colombia Leader President President&&COO COO Officer Officer New NewMexi Mexico coCoal Coal Mt

  8. Slide 8: Energy Coal Reserves

    Energy Coal Reserves Distribution of Marketable Reserves by Asset Total Reserves Mt New 12000 Mexico 17% Hunter Ingwe 879Mt Valley Colombia 13% 10000 NMC 304Mt HVEC Other MAC 231Mt MAC Colombia 8000 NMC 19% Colombia 334 Mt Ingwe Ingwe Other 51% Ingwe Ops 6000 1000 Export and Domestic Split 4000 Dome

  9. Slide 9: BHP Billiton Strategic Framework

    BHP Billiton Strategic Framework Leverage Global Brand and Footprint Global Capabilities, Local Presence Cross-CS G Collaboration Opportunity Discovering/Capture Technology Growth Options Opportunity Retention Project Execution Project Definition Market Driven Project Pipeline Project Prioritisation

  10. Slide 10: Energy Coal Strategy: Strategic Pillars

    Energy Coal Strategy Strategic Pillars BHP Billiton’s “Black Diamond” 4. Extend Our 5. Address 3. Grow and Marketing Longer Optimise Advantage Term Dis- the Portfolio (“The continuities Perfect Cut”) 2. Well Run Operations 1. Engaged People and Enhanced Organisational Capabilities 10

  11. Slide 11: HSEC

    od bhpbilliton

  12. Slide 12: The HSEC journey

    The HSEC journey Energy Coal – where we have come from Focus on leading and lagging indicators 20 18 18 16 Fatalities 15 KPI 10 9 6 6 5 TRIFR Reduction 5 3 0 1 0 Behaviour Based Safety Systems 0 PL4 near miss reporting 96 97 98 99 00 01 02 03 04 05 06 FY FY FY FY FY FY FY FY FY FY FY Fatal Risk Cont

  13. Slide 13: Financial performance

    Financial performance

  14. Slide 14: Energy Coal EBIT by Business Unit

    Energy Coal EBIT by Business Unit Half year ended 31 December (US$M) Dec 2005 Dec 2004 % % Change Change Ingwe - 124 -100 New Mexico 44 44 - Hunter Valley 20 36 -44 Colombia 99 97 +2 Divisional Activities (6) (7) +14 Total from Operations 157 294 -47 Third party products 48 2 Energy Coal (total) 205

  15. Slide 15: EBIT Trends

    EBIT Trends Unfavorable Unfavorable price/ price/ Favorable Favorable price, price, Favorable Favorable price price variance variance partially partially 700 FX/inflation FX/inflation and and portfolio portfolio volume volume andand cost cost offset offsetby by FX FX and and inflationary inflationar

  16. Slide 16: Operations and Growth

    Operations and Growth

  17. Slide 17: Portfolio actions to build long term performance

    Portfolio actions to build long term performance BHP Billiton Merger Klipspruit mini- Anticipated NCIG wins tender Lake Mines pit approved for Newcastle 3rd Koornfontein divestment Port sale Sales of Delmas to MAC South Pit Middelburg Black Empowerment Expansion Middlings plant Feasibility approved

  18. Slide 18: Energy Coal project pipeline

    Energy Coal project pipeline Brownfield expansions/projects Greenfield expansions/projects Cerrejon Optimal Optimum Project Cerrejon Leandra Douglas/MMS to 32Mtpa NSW Port Optimisation Naudesbank Project MAC South New Mexico Pit Expansion Coal MAC Underground Klipspruit Feasibility Execution a s i b

  19. Slide 19: Ingwe - Location

    Ingwe - Location Middelburg Type O/C mine Capacity 15 Mtpa (84% ) Life 29 yrs Optimum Richards Ingwe Operations Type O/C mine Bay Capacity 14.9 Mtpa Klipspruit Life 10 yrs Type O/C mine Capacity 1.5 Mtpa PRETORIA Central Complex Life Refer project Klipspruit Middelburg Project JOHANNESBURG Koornfont

  20. Slide 20: Ingwe - key issues

    Ingwe- key issues • Ingwe Recovery Plan • Eskom contracts • Ingwe growth projects • Portfolio optimisation 20

  21. Slide 21: Ingwe Recovery Plan

    Ingwe Recovery Plan • Safety first • Started with Optimum • Now being rolled out to the rest of the operations • Key challenges – Significant management changes on all sites – Abnormal unseasonal rainfall – Exposure of coal chain weaknesses • Opportunities: – Significant cost reduction – Revenue imp

  22. Slide 22: Ingwe – Eskom Contracts

    Ingwe – Eskom Contracts Eskom Sale Volumes (Mtpa) and Prices (ZAR) Contracted volumes 16 70 14 • Duvha 8.4Mtpa (10Mtpa 100%) 12 65 supplied by Middelburg until the end of 10 60 calendar 2014. Customer's option to 8 extend for two additional 10 year periods 6 55 to 2034. 4 50 2 • Hendrina 6.5Mtpa sup

  23. Slide 23: Ingwe – Eskom Contracts cont.

    Ingwe – Eskom Contracts cont. • Ingwe’s fixed price contracts (Hendrina and Duvha) are subject to PPI and CCI (“Cost of Coal”) inflation indices with an efficiency factor, as well as a bonus/penalty structure dependent on quality parameters • As a result, the prices achieved lag the long term inflat

  24. Slide 24: Ingwe Growth Projects

    Ingwe Growth Projects Ingwe Project Status Total volume 49mtpa 18 Export and Domestic Split 16 Domestic Concept 14 Export Feasibility 12 10 8 6 Pre-feasibility 4 2 0 DMO Optimum Leandra Klipsruit Naudesbank Feasibility Pre-feasib ility Concept 24

  25. Slide 25: Ingwe Portfolio Optimisation

    Ingwe Portfolio Optimisation • Douglas and Middelburg to be combined • ZAC divested • Koornfontein sale process currently underway (BEE transaction) • Significant other transactions completed around reserve/resources sales (11) and others in process (4) 25

  26. Slide 26: Hunter Valley Energy Coal

    26 Hunter Valley Energy Coal amt Arthur Coal aS Sp —Kiver Port Hunter F NEWCASTLE ake Macquarie Tuggerah Lake Pacific Richinon s ale Pe Ocean Port Jackson SYDNEY odé bhpbilliton

  27. Slide 27: Mt Arthur Coal Growth Opportunities

    Mt Arthur Coal Growth Opportunities Mined Out Open Cut Areas 27

  28. Slide 28: Mt Arthur Coal Growth Opportunities

    Mt Arthur Coal Growth Opportunities Mined Out Open Cut Areas Focus on Process Improvement Open Cut Reserve Area - 33 Yr 28

  29. Slide 29: Mt Arthur Coal Growth Opportunities

    Mt Arthur Coal Growth Opportunities South Pit project Mined Out Open Cut Areas Small capital investment Low cost incremental tonnes Open Cut Reserve Area - 33 Yr Incremental Growth - Open Cut Area 29

  30. Slide 30: Mt Arthur Coal Growth Opportunities

    Mt Arthur Coal Growth Opportunities Mt Arthur U/G Mined Out Open Cut Areas Early assessment phase Very long life Low cost highwall access Open Cut Reserve Area - 33 Yr Incremental Growth - Open Cut Area Major Growth – Mt Arthur Underground Reserve Area 30

  31. Slide 31: NSW Infrastructure

    NSW Infrastructure • Infrastructure constraints • In CY 2004, a quota system was introduced by Port Waratah Coal Services (“PWCS”) • Establishment of the Newcastle Coal Infrastructure Group (“NCIG”) • NCIG proposal to lift coal loading capacity successful • Rail constraints are being addressed by th

  32. Slide 32: Caroona Coal Project – Gunnedah Basin

    Caroona Coal Project – Gunnedah Basin • 350km 2 Exploration Area • 260km to Newcastle Port • BHP Billiton won competitive tender from NSW Government • Too early for JORC resource number • Exploration and assessment 4 to 5 years • Initial coal quality – 6300kcal/kg ar – 10% ash – <0.5% Sulphur – Some

  33. Slide 33: New Mexico Coal

    New Mexico Coal COLORADO NEW MEXICO ARIZONA UTE MOUNTAIN UTE San INDIAN RESERVATION SanJuan NAVAJO INDIAN ta Juan a Pl a d La LaPlata Plata RESERVATION Mine L roa Mine a ul Mine Mine er H aRiv la t San Juan P La Generating DEEP LEASE Shiprock Station DEEP LEASE EXTENSION PILOT MINE Farmington r as R

  34. Slide 34: Desert Rock Energy Project

    Desert Rock Energy Project • Desert Rock Energy Project – up to 1500 MW mine-mouth power plant. • Navajo Coal Company (BNCC) will be the coal supplier. • Sithe Global’s schedule shows financial close in late Q2 of CY2007, start- DREP up of first 750 MW unit in June 2010 and second 750 MW unit in Jun

  35. Slide 35: Cerrejón - Location

    - Location on Cerre Caribbean Sea 2. Bi Ci iS : & Pacific Occan bhpbilliton 35

  36. Slide 36: Cerrejón Expansion to 32 Mtpa

    Cerrejón Expansion to 32 Mtpa • Estimated Total Cost of US$127M (100% terms) • Major Mining Equipment – 3 Komatsu PC8000 Hydraulic Excavators – 14 Euclid-Hitachi EH5000 Haul Trucks – 5 Caterpillar 789 Coal Trucks • Locomotive & Railcars – 2 GE Locomotives – 80 Railcars • Railway Upgrade – 0.3 km ext

  37. Slide 37: Cerrejón Coal Optimal Expansion Capacity

    Cerrejón Coal Optimal Expansion Capacity • Expansion Schedule – Expansion to 45Mtpa – Prefeasability Study to be completed CY 2006 – BHP Billiton execution approval to be completed Late 2007 – Optimal Expansion production possible by 2010 • Mine Infrastructure, Rail, and Port Facilities • Key Enviro