Algoma Steel — Corporate Update (March 2025)

25 slides from Algoma Steel's corporate update, Mar 18, 2025

  1. Slide 1: Community Liaison Committee, Tuesday March 18, 2025

    Community Liaison Committee Tuesday March 18, 2025 ArSOMA

  2. Slide 2: Safety and values statement

    With every decision, every action, every day, we will work safely with teamwork, integrity and deep care for our people, their families and the environment.

  3. Slide 3: Meeting agenda

    1. Review of December 10th, 2024 Meeting Notes 2. Review CLC Term of Reference Proposed Revision 3. Membership Items 4. Cokemaking Emissions Performance 5. Review 2024 Fourth Quarterly Report – Ambient Air Quality Monitoring Program 6. Electric Arc Steelmaking and Environmental Permit Applications 7

  4. Slide 4: CLC Terms of Reference proposed revision

    After reviewing the current Terms of Reference for the CLC committee, Algoma Steel would like to propose a change. Specifically, we suggest the following revision to the "Membership" section: Current wording: "One member representing the First Nations” Proposed change: “One member representing each

  5. Slide 5: CLC membership representation

    Representation Primary Member Alternate Algoma Steel Corey Jackson Giancarlo Perra MECP Lori Jalak Rick Lalonde Public David Trowbridge Anton Schoahs Public Jillian Marquis Dan Gabor SSM Tribe of Chippewa Indians TBD Algoma Public Health Melissa Francella Virginia Huber Chippewa County Health Dept.

  6. Slide 6: Cokemaking emissions limits and performance

    30 Day Rolling Average % Implementation Charging Pushing Doors Lids Off-takes Date Emissions Opacity (%) average intensity of pushing emissions average duration of charging emissions July 2, 2015 38 0.8 25 12 sec 50 % lid leaks Jan. 1, 2016 22.5 0.8 15 12 sec 50 % off-takes leaks Jan. 1, 2017 7 0.8

  7. Slide 7: Cokemaking Emissions Performance

    Cokemaking Emissions Performance 30-Day Rolling Average of Door Emissions 30-Day Rolling Average of Offtake Emissions as ——7 Battery 2 A a Battery —7esttery as 9 Battery 7 —sater rani =e a g \aJ —nroieient |B ee Pas —rorateestart |S 3 ran 20edent 3, —sovayrestat | z 2 ar sa restart gis = 30 Day Rest

  8. Slide 8: Cokemaking Emissions Performance

    Cokemaking Emissions Performance ‘Average Pushing Opacity erceare a SB OR ° All Batteries Average Pushing Opacity by Year Number of Audited Pushes by Opacity 3000 2500 3 2000 id é 550% 8 1500 5 40-50% 2 1000 = 30-40% 5 <30% 500 oO 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2015 2016 2017

  9. Slide 9: Cokemaking Stack Opacity

    Cokemaking Stack Opacity 30 Day Rolling Average of Opacity >20% For Each Coke Battery in Hours Per Day 30 Day Rolling Average of Opacity | Pf Na Nay wl fa Att MS Bao N\ ff Ay \a A rl aap gon ANE VA Mou >20% opacity € q al average Opaci Vi oa a a oa a a eo io oO cs > > > ~ > > 2 x os wy oa a Se a a e

  10. Slide 10: 2024 Fourth Quarterly Report - Ambient Air Quality Monitoring Program

    2024 Fourth Quarterly Report —- Ambient Air Quality Monitoring Program Maximum Minimum Arithmetic Mean (Quarterly) Standard Number of Excursions Guideline, AAQC Criteria Bonney Street Station (71042) Parameter U Continuous Parameters (Quarterly) Total Reduced Sulphur (TRS) - 10 minute ppb 76.0 0 2.0

  11. Slide 11: 2024 Fourth Quarterly Report - Ambient Air Quality Monitoring Program

    2024 Fourth Quarterly Report - Ambient Air Quality Monitoring Program Parameter Units Maximum Minimum Arithmetic Mean (Quarterly) Standard Number of Excursions Guideline, AAQC Criteria Fourth Avenue - David Kyle Park Station (71082) Continuous Parameters (Quarterly) Total Reduced Sulphur (TRS) — 10

  12. Slide 12: 2024 Fourth Quarterly Report - Ambient Air Quality Monitoring Program

    2024 Fourth Quarterly Report - Ambient Air Quality Monitoring Program Parameter Units Maximum Minimum Arithmetic Mean (Quarterly) Standard Number of Excursions Guideline, AAQC Criteria West & Cathcart Station (71083) Continuous Parameters (Quarterly) Total Reduced Sulphur (TRS) ~ 10 minute ppb 205 0

  13. Slide 13: 2024 Fourth Quarterly Report - Ambient Air Quality Monitoring Program

    2024 Fourth Quarterly Report - Ambient Air Quality Monitoring Program Parameter Maximum Minimum Arithmetic Mean (Quarterly) Standard Number of Excursions Guideline, AAQC Criteria Wallace Terrace Station (71090) Casein oe — Benzene <MDL <MDL <MDL 0.45 (Annual) ° 2.3 gim® (24-hour) Bevclajpyrene (Pass

  14. Slide 14: Building a New Era in Steelmaking

    vy AC Building a New Era in Steelmaking

  15. Slide 15: Slide 15

  16. Slide 16: Electric arc furnace transition benefits

    Adds ~700kt of finished steel capacity aligning steelmaking capacity to rolling capacity. ~70% fewer total CO2 emissions (annual reduction of 3 million tonnes of CO2). More flexible operations capable of responding dynamically to market conditions. Reduced sustaining CapEx. Improves employee product

  17. Slide 17: EAF construction progress photos

    Dust system complete. Axial Cyclone installation on Baghouse EAF #2 ready for assembly and installation. Photos taken February 2025

  18. Slide 18: Algoma expected to become a leading green steel producer

    3.0mm tonnes 70% 1.33 tonnes 75% 4,060 tonnes 82% 1,604 tonnes 52% Complete elimination of Stack 100% and Fugitive Emissions Algoma expected to become one Improves profile with select of the leading producers of green customers who are similarly steel in North America. ESG focused. Improves competit

  19. Slide 19: Environmental Compliance Approval applications for EAF steelmaking

    Environmental Compliance Amendment to the existing industrial Approval for air and noise based sewage works Environmental on the facilities associated with Compliance Approval that incorporates: the transition to electric arc New recirculating non-contact cooling furnace steelmaking. Application wat

  20. Slide 20: Abatement Plan accepted by the MECP

    Algoma steel has prepared an Abatement Plan, which has been accepted by the MECP, to bridge the gap until an alternate standard is available under O.Reg. 419. The Abatement Plan is an evolving emissions management plan which aligns with industry best practices and future requirements of the ITS. A s

  21. Slide 21: Shoreline stabilization and site greening project

    Algoma’s shoreline stabilization project consists of a four year plan to install 4.1 km of shoreline protection along the St. Mary’s River to prevent future erosion. As of December 2024, the project is valued at $4.07 million. The project will resume this summer with the placement of the clean rip-r

  22. Slide 22: 2025 Business Sustainability Award

    We are proud to share we have been recognized with the \ AWARD WINNER 202.5 at the 2025 Business ALGOMA Sustainability — STEEL INC, — Awards! ArSOMA

  23. Slide 23: Community engagement

    Quarterly Community Liaison Committee meetings. Donated $10,000 to Save Our Young Adults (SOYA) to support their relocation and renovation costs. Sponsored and participated in the Gathering at the Rapids Pow Wow. Welcomed students from Sault College Manufacturing Processes class for an informative s

  24. Slide 24: Next Community Open House

    Our next Community Open House will be held: Wednesday, June 11% , 2025 at Algoma Steel We hope to see you there! ArSOMA

  25. Slide 25: Proposed meeting schedule

    Proposed Schedule: June 3, 2025 September 2025 December 2025