Kgl Resources — Kentor Gold — Shareholder Meeting (May 2006)
12 slides from Kgl Resources's shareholder meeting presentation, May 25, 2006
Slide 1: Annual General Meeting May 2006
Slide 2: Kentor Tenements — November 2005
K KENTOR GOLD LTD Kentor Tenements — November 2005 LEGEND Kentor Licence Areas Multi-miilion Oz Au Deposit FIGURE 1 KENTOR GOLD LTD - TENEMENT LOCATION MAP
Slide 3: Recent analysis has defined 2 new prospective corridors
| KENTOR GOLD LTD Recent geological, geochemical & geophysical analysis has defined 2 new prospective corridors — extensions of the Kumtor Trend hosting a string of gold deposits — this is the PRIZE The most prospective sites worthy of drilling in those corridors have been pinpointed using on-site a
Slide 4: Akbel 2006 Drill Plan
Ki! KENTOR GOLD LTD 258000 E 260000 262000 E AKB-DD04 ee fe 2 f 4632000 N wail - ill lan Zi Kumtor Mine Map Coverage LEGEND ef” Conductive zone Drillhole - completed / in progress ; Chargeability zone © Drillhole - proposed AKBEL 77 Prospective corridor mma Tenement boundary 2006 DRILL PLAN
Slide 5: Akbel Drill Sections
Ki! KENTOR GOLD LTD Temas §=AKDe! Drill Sections AKB DDO2 AKB-DD02 4Az'330°-/ Dec -70°) Glacial Moraine Black Shale Black Shale Possitie “ore phase" pyrite alteration identified withia tite || associated with interpreted south dipping Fault Zone Structurally complex graphitic shear zone in black pyr
Slide 6: Akbel Drill Sections - Schematic Section 24,215 mE
Ki! KENTOR GOLD LTD Schematic Section 24,215 mE soum Sea tr ea Akbel Drill Sections AKB DD04 AKB-DD04 et {Az 387 / Dac -60 } Q1Z, CARD, GRA SER, PYY, Mn} ‘ace SEAR PYY, Fe SPHAL hale dominant sequence IM dominan? sequence ime Bink Shao lane trace - Ginawage trace EF Fault Shear with infested movemen
Slide 7: The RD drill rig is not coping technically due to tough conditions
KENTOR GOLD LTD The RD 850 drill rig is not coping technically due to the tough environmental conditions — ground conditions (moraine), altitude, and permafrost This means that we now understand the job / project better and have come up with staged solutions to address the problems In the short-term
Slide 8: Coarse fragmented gravel and transition from moraine to bedrock
Coarse fragmented gravel & loose sand Transition from moraine to bedrock — carbonaceous shale
Slide 9: The current RD rig will be directed to specific sites
KENTOR GOLD LTD gQ The current RD 850 rig will be directed to the specific sites for which it is most suitable — where the moraine cover is thinner and less difficult To penetrate the thickest (+150M) and most resistant moraine cover, we are moving to site a much more powerful rig — RD 1500 (equival
Slide 10: Focus of activities outside of Akbel
Mm KENTOR GOLD LTD Focus of activities outside of Akbel will be on the follow-up of multiple gold targets in the Bashkol licence area This February we have completed initial drill testing at Uzunbulak. Analysis has given mixed results and we are considering future options We have progressed all of o
Slide 11: Akbel and Bashkol anomalous gold drainages
K KENTOR GOLD LTD 78° OY OD" & 79° 00} OO" Foner. 10 kilometers 20 TSO Oo" E 79" 00" Oo" E a2 OF OH Akbel — Bashkol anomalous gold drainages
Slide 12: i ve oo
KENTOR GOLD LTD i ve 7 oo . Lo oD . . - a He ee eae