Kingsgate Consolidated Limited · ASX:KCN

Kingsgate Consolidated — Corporate Update (May 2011)

16 slides from Kingsgate Consolidated's corporate update, May 2011

  1. Slide 1: Kingsgate Update May 2011

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements: These materials include forward looking statements. Forward looking statements inherently involve subjective judgment & analysis & are subject to significant uncertainties, risks & contingencies, many of which are outside of the control of, & may be unknown to, the compan

  3. Slide 3: Group Gold Production 32,973oz

    Group Gold Production 32,9730z (Chatree 16,7840z, Challenger 16,1890z) Total Cash Costs, Chatree US$425/oz, Challenger USS814/oz (Incl. royalties) Chatree Expansion on Schedule & Budget Dividend of 10 cps declared on 22 February and paid on 17 March 2011 FY2011 Group Production 125Koz -— 130Kozs

  4. Slide 4: advance

    advance aavance derway

  5. Slide 5: Challenger Exploration Drilling

    Challenger Exploration Drilling SIGNIFICANT CHALLENGER WEST INTERSECTIONS from surface and underground drilling From | To Comments (=) _| (=) (git gold) Other § Structures surtoce dnl ; 820 Level sure dl = Area of current drilling inc! 1.2m @ 65.87 — ee 7 800 Level Exploration Drive incl 059m @ 11.1

  6. Slide 6: Challenger Long Section

    Challenger Long Section 800 Level Exploration Drive Identified Structures 280 Level Exploration Drive

  7. Slide 7: Challenger Oblique Section

    Challenger Oblique Section Challenger West 800 Level Exploration Drive Upside 280 Level Exploration Drive

  8. Slide 8: Chatree processing plant capacity increase from 2.3 to +5 Mtpa

    Chatree processing plant capacity increase from 2.3 to +5 Mtpa Completion expected in September Quarter 2011 Increase production rate up to 200,000 ounces per year Total project capex US$125M; EPCM contract US$100M Expensed ~US$75M; Remaining ~USS$50M Tax incentives granted for production from new p

  9. Slide 9: Loan Facilities Finalised

  10. Slide 10: Kingsgate Grows

    Beijing - e y(Bangkok Kingsgate Grows 2013 Three Mines Three Countries 400 Gold Production Growth var ~ New York = D 2008 2009 2010 «=2011F 892012F 6 2013F Challenger BArqueros (100%) [MP Arqueros » sntiogg enos ires 5000 Kilometres — —

  11. Slide 11: Arqueros Au/Ag project

    ros Au/Ag pre eros /A 1.3001 ( 1 2UUKM

  12. Slide 12: www.kingsgate.com.au

    www.kingsgate.com.au

  13. Slide 13: General Disclaimer

    General Disclaimer: The information contained in this presentation is for informational purposes only and does not constitute an offer to issue, or arrange to issue securities or other financial products. The information contained in this presentation is not investment or financial product advice an

  14. Slide 14: Chatree Ore Reserves as at June 2010

    atree Ore Reserves as at 30 June 2010 (>0.4g/t gold cut-off grade) Source Category 's GoldGrade Silver Grade — Gold Contained Comba (o) (at) (million ounces) (million ounces) From Pits Proved 374 1.00 9.5 1.20 11.42 Probable 18.7 0.98 8.4 0.59 5.02 Stockpiles 56 0.79 12.1 0.14 219 Chatree Total Tota

  15. Slide 15: Challenger Ore Reserves as at June 2010

    Challenger Ore Reserves as at 30 June 20 Source Category Tonnes Gold Grade Gold Contained (thousands) @v (thousand ounces) From Mine Proved 318 58 59 Probable 1,834 60 352 Stockpiles 157 24 9 Challenger Total Total 2,310 57 420 Challenger Mineral Resources as at 30 June 2010 Category Tonnes Gold Gra

  16. Slide 16: 17,751 31,075 48,826

    17,751 31,075 48,826

Kingsgate Consolidated — Corporate Update (May 2011) on 6ix