Pivotal Metals Limited · ASX:PVT
Pivotal Metals — Investor Presentation (October 2023)
18 slides from Pivotal Metals's investor presentation, Oct 9, 2023
Slide 1: Corporate Presentation
For personal use only PIVOTAL METALS LTD Corporate Presentation BUILDING CRITICAL METALS BUSINESS IN ASX:PVT THE WORLDS BEST October 2023 MINING JURISDICTION
Slide 2: Disclaimer
Disclaimer For personal use only The release, publication or distribution of this presentation in certain jurisdictions may be restricted by law and therefore persons in such jurisdictions into which this presentation is released, published or distributed should inform themselves about and observe s
Slide 3: Investment Highlights
Investment Highlights For personal use only Critical Metals Leverage High Quality Assets • Copper, Nickel, PGMs • Horden Lake • Vital for energy transition • 27.8mt @ 1.49% CuEq2 • Robust supply demand dynamics • Significant exploration upside • Beneficiaries of green political and • BAGB capital ta
Slide 4: Quebec: Premier Global Mining Location
Quebec: Premier Global Mining Location For personal use only Strong mining pedigree • Prolific cluster of projects, mines and smelters centred around the world-famous Abitibi Greenstone belt. • Mining is the region’s lifeblood, with 22 active mines. The industry directly employs 19,000 people. • ‘Fu
Slide 5: Horden Lake
For personal use only Horden Lake 28Mt at 1.5% CuEq* CU-NI-PGM DEVELOPMENT PROJECT The Company confirms that it is not aware of any new information or data that materially affects the information included in this presentation and that all material assumptions and technical parameters underpinning th
Slide 6: Horden Lake Highlights
Horden Lake Highlights For personal use only 27.8 mt @ 1.49 % CuEq ✓ 412kt contained CuEq ✓ Cu 0.73%, Ni 0.22%, 0.19 g/t Pd, 0.12 g/t Au ✓ Majority in indicated category Grade upside potential ✓ Majority in pit-shell Development potential • Complete multielement assay compilation across • Open pitta
Slide 7: Horden Lake – Grade Upside Potential
Horden Lake – Grade Upside Potential For personal use only Gold domain Historical focus only on Copper domain Cu and Ni • But 2008/12 drilling assayed multi element • Au, Ag, Co, Pt, Pd all consistently encountered Current resource understates grade • Gold currently only modelled over part of deposi
Slide 8: Horden Lake – Resource Upside Potential
Horden Lake – Resource Upside Potential For personal use only Elevation of Horden Lake deposit 27.8mt JORC resource envelope in colour, with optimised pit constrained outline in grey shadow 11m @ 0.9% CuEq (61m) 16m @ 1.22% CuEq (291m) H25301, 0.2% Cu, 0.2% Ni, 0.2g/t Pd H33280, 0.4% Cu, 0.3% Ni, 0.
Slide 9: Horden Lake – Development Considerations
Horden Lake – Development Considerations For personal use only 62% of resource is pit constrained ✓ Low cost open pit front-end potential Thick zones of mineralisation, at 50-60 dip ✓ Amenable to bulk mining techniques High recoveries in testwork ✓ 95% Cu to 23% con in rougher Paved highway within 1
Slide 10: Horden Lake – Deposit Geology
Horden Lake – Deposit Geology For personal use only • Magmatic sulphide deposit associated with mafic and ultramafic rocks • Mineralisation occurs along the contact of the gabbroic complex and metasedimentary rocks • Mineralisation extends to north-east and is open at depth • Two main mineral styles
Slide 11: Belleterre-Angliers Greenstone Belt (BAGB)
For personal use only Belleterre-Angliers Greenstone Belt (BAGB) EARLY-STAGE EXPLORATION ASSETS WITH SUBSTANTIAL POTENTIAL 11
Slide 12: Ultra high grades already drilled
Ultra high grades already drilled For personal use only • 157km2 land package covering a prospective suite of gabbroic intrusives in southern Quebec • Ultra-High grades drilled into gabbroic intrusions by previous operators. Focus always on shallow targets. Selected Intercepts for Midrim (MR) and Al
Slide 13: Strategy to target feeder zone
Strategy to target feeder zone For personal use only Previous operators kept targeting the same high grade, but small anomalies in top ~200m What will we do differently? ✓ Target broader intrusive complex that could host substantial massive and semi-massive sulphide accumulations ✓ 20 priority VTEM
Slide 14: Key catalysts and expected news-flow
Key catalysts and expected news-flow For personal use only BAGB Geophysics Horden Lake Metallurgy Horden Lake Geophysics Horden Lake Drilling See ASX announcement dated 2 October 2023 “Exploration and Development Work Program for Quebec Projects” 14
Slide 15: Corporate Overview
Corporate Overview For personal use only Board and Management Position Name Expertise Non-Exec Chair Simon Gray Corporate and Commercial Lawyer, Corporate Governance, Capital Markets Managing Director Ivan Fairhall Mechanical Engineer, Private Equity, Mining Executive Non-Exec Director Robert Wrixon
Slide 16: Why Invest in Pivotal Metals?
Why Invest in Pivotal Metals? For personal use only ✓ Exposure to key commodities essential in the transition to sustainable technologies ✓ Projects in tier 1 mining jurisdiction with tangible incentives on offer ✓ Large (28Mt @ 1.5% CuEq) defined Horden Lake copper-nickel-PGM deposit near infrastru
Slide 17: Pivotal Metals Limited
For personal use only Pivotal Metals Limited ABN 49 623 130 987 Level 32, 71 Eagle Street Brisbane QLD 4000 GPO Box 2517 WA 6831 T: +61 8 9481 0389 E: info@pivotalmetals.com W: www.pivotalmetals.com 17
Slide 18: Appendix: JORC Resource
Appendix: JORC Resource For personal use only Grade Contained Metal Category Tonnes CuEq (%) Cu (%) Ni (%) Au (g/t) Pd (g/t) CuEq (kt) Cu (kt) Ni (kt) Au (koz) Pd (koz) Indicated 15.2 1.50 0.77 0.20 0.13 0.19 228.6 117.6 30.5 59.4 91.3 Inferred 12.5 1.47 0.67 0.25 0.02 0.20 184.3 84.0 31.4 6.9 76.7
Pivotal Metals — Investor Presentation (October 2023) on 6ix