Pivotal Metals Limited · ASX:PVT

Pivotal Metals — Investor Presentation (October 2023)

18 slides from Pivotal Metals's investor presentation, Oct 9, 2023

  1. Slide 1: Corporate Presentation

    For personal use only PIVOTAL METALS LTD Corporate Presentation BUILDING CRITICAL METALS BUSINESS IN ASX:PVT THE WORLDS BEST October 2023 MINING JURISDICTION

  2. Slide 2: Disclaimer

    Disclaimer For personal use only The release, publication or distribution of this presentation in certain jurisdictions may be restricted by law and therefore persons in such jurisdictions into which this presentation is released, published or distributed should inform themselves about and observe s

  3. Slide 3: Investment Highlights

    Investment Highlights For personal use only Critical Metals Leverage High Quality Assets • Copper, Nickel, PGMs • Horden Lake • Vital for energy transition • 27.8mt @ 1.49% CuEq2 • Robust supply demand dynamics • Significant exploration upside • Beneficiaries of green political and • BAGB capital ta

  4. Slide 4: Quebec: Premier Global Mining Location

    Quebec: Premier Global Mining Location For personal use only Strong mining pedigree • Prolific cluster of projects, mines and smelters centred around the world-famous Abitibi Greenstone belt. • Mining is the region’s lifeblood, with 22 active mines. The industry directly employs 19,000 people. • ‘Fu

  5. Slide 5: Horden Lake

    For personal use only Horden Lake 28Mt at 1.5% CuEq* CU-NI-PGM DEVELOPMENT PROJECT The Company confirms that it is not aware of any new information or data that materially affects the information included in this presentation and that all material assumptions and technical parameters underpinning th

  6. Slide 6: Horden Lake Highlights

    Horden Lake Highlights For personal use only 27.8 mt @ 1.49 % CuEq ✓ 412kt contained CuEq ✓ Cu 0.73%, Ni 0.22%, 0.19 g/t Pd, 0.12 g/t Au ✓ Majority in indicated category Grade upside potential ✓ Majority in pit-shell Development potential • Complete multielement assay compilation across • Open pitta

  7. Slide 7: Horden Lake – Grade Upside Potential

    Horden Lake – Grade Upside Potential For personal use only Gold domain Historical focus only on Copper domain Cu and Ni • But 2008/12 drilling assayed multi element • Au, Ag, Co, Pt, Pd all consistently encountered Current resource understates grade • Gold currently only modelled over part of deposi

  8. Slide 8: Horden Lake – Resource Upside Potential

    Horden Lake – Resource Upside Potential For personal use only Elevation of Horden Lake deposit 27.8mt JORC resource envelope in colour, with optimised pit constrained outline in grey shadow 11m @ 0.9% CuEq (61m) 16m @ 1.22% CuEq (291m) H25301, 0.2% Cu, 0.2% Ni, 0.2g/t Pd H33280, 0.4% Cu, 0.3% Ni, 0.

  9. Slide 9: Horden Lake – Development Considerations

    Horden Lake – Development Considerations For personal use only 62% of resource is pit constrained ✓ Low cost open pit front-end potential Thick zones of mineralisation, at 50-60 dip ✓ Amenable to bulk mining techniques High recoveries in testwork ✓ 95% Cu to 23% con in rougher Paved highway within 1

  10. Slide 10: Horden Lake – Deposit Geology

    Horden Lake – Deposit Geology For personal use only • Magmatic sulphide deposit associated with mafic and ultramafic rocks • Mineralisation occurs along the contact of the gabbroic complex and metasedimentary rocks • Mineralisation extends to north-east and is open at depth • Two main mineral styles

  11. Slide 11: Belleterre-Angliers Greenstone Belt (BAGB)

    For personal use only Belleterre-Angliers Greenstone Belt (BAGB) EARLY-STAGE EXPLORATION ASSETS WITH SUBSTANTIAL POTENTIAL 11

  12. Slide 12: Ultra high grades already drilled

    Ultra high grades already drilled For personal use only • 157km2 land package covering a prospective suite of gabbroic intrusives in southern Quebec • Ultra-High grades drilled into gabbroic intrusions by previous operators. Focus always on shallow targets. Selected Intercepts for Midrim (MR) and Al

  13. Slide 13: Strategy to target feeder zone

    Strategy to target feeder zone For personal use only Previous operators kept targeting the same high grade, but small anomalies in top ~200m What will we do differently? ✓ Target broader intrusive complex that could host substantial massive and semi-massive sulphide accumulations ✓ 20 priority VTEM

  14. Slide 14: Key catalysts and expected news-flow

    Key catalysts and expected news-flow For personal use only BAGB Geophysics Horden Lake Metallurgy Horden Lake Geophysics Horden Lake Drilling See ASX announcement dated 2 October 2023 “Exploration and Development Work Program for Quebec Projects” 14

  15. Slide 15: Corporate Overview

    Corporate Overview For personal use only Board and Management Position Name Expertise Non-Exec Chair Simon Gray Corporate and Commercial Lawyer, Corporate Governance, Capital Markets Managing Director Ivan Fairhall Mechanical Engineer, Private Equity, Mining Executive Non-Exec Director Robert Wrixon

  16. Slide 16: Why Invest in Pivotal Metals?

    Why Invest in Pivotal Metals? For personal use only ✓ Exposure to key commodities essential in the transition to sustainable technologies ✓ Projects in tier 1 mining jurisdiction with tangible incentives on offer ✓ Large (28Mt @ 1.5% CuEq) defined Horden Lake copper-nickel-PGM deposit near infrastru

  17. Slide 17: Pivotal Metals Limited

    For personal use only Pivotal Metals Limited ABN 49 623 130 987 Level 32, 71 Eagle Street Brisbane QLD 4000 GPO Box 2517 WA 6831 T: +61 8 9481 0389 E: info@pivotalmetals.com W: www.pivotalmetals.com 17

  18. Slide 18: Appendix: JORC Resource

    Appendix: JORC Resource For personal use only Grade Contained Metal Category Tonnes CuEq (%) Cu (%) Ni (%) Au (g/t) Pd (g/t) CuEq (kt) Cu (kt) Ni (kt) Au (koz) Pd (koz) Indicated 15.2 1.50 0.77 0.20 0.13 0.19 228.6 117.6 30.5 59.4 91.3 Inferred 12.5 1.47 0.67 0.25 0.02 0.20 184.3 84.0 31.4 6.9 76.7

Pivotal Metals — Investor Presentation (October 2023) on 6ix