  1. Slide 1: Achieving >50% Renewables at Agnew Gold Mine

    ACHIEVING >50% RENEWABLES AT AGNEW GOLD MINE JAMES KOERTING – ENERGY MANAGER Energy & Mines Australia 4 August 2020

  2. Slide 2: Forward Looking statements

    Forward Looking statements Certain statements in this document constitute “forward looking statements” within the meaning of Section 27A of the US Securities Act of 1933 and Section 21E of the US Securities Exchange Act of 1934. In particular, the forward looking statements in this document include

  3. Slide 3: Agenda

    Agenda 1 About Gold Fields 2 Problem statements 3 Agnew hybrid renewable microgrid 4 Project derisking process 5 Agnew’s lessons Agnew Hybrid Project | James Koerting | 4 August 2020 3

  4. Slide 4: Gold Fields Limited

    Gold Fields Limited 9 gold mines  1 project  5 countries  2.2 Moz annual gold production  GFI (JSE, NYSE) Agnew Hybrid Project | James Koerting | 4 August 2020 4

  5. Slide 5: Climate change impacts are being realised and miners have set decarbonisation deadlines

    Problem Statement 1 THE NEGATIVE IMPACTS OF CLIMATE CHANGE ARE BEING REALISED AND MINING COMPANIES HAVE SET DEADLINES TO DECARBONISE THEIR OPERATIONS

  6. Slide 6: To fully decarbonise we must also electrify our fleets

    Problem Statement 2 TO FULLY DECARBONISE WE MUST ALSO ELECTRIFY OUR FLEETS SO OUR PLANS FOR RENEWABLE ENERGY PRODUCTION MUST (DOUBLE)

  7. Slide 7: High penetration renewables present a stability risk to mine site microgrids

    Problem Statement 3 HIGH PENETRATION RENEWABLES PRESENT A STABILITY RISK TO MINE SITE MICROGRIDS AND SAFETY AND PRODUCTION ARE KING

  8. Slide 8: Agnew Hybrid Renewable Microgrid: Project recap

    AGNEW HYBRID RENEWABLE MICROGRID Project recap 4MW SOLAR PV 18MW WIND 10,710 X SUNTECH PANELS 5 MVA SMA CENTRALISED SOLAR INVERTER MICROGRID CONTROL SYSTEM 5 x GOLDWIND GW140 3.57MW NEXTRACKER SINGLE AXIS TRACKING SYSTEM PERMANENT MAGNET DRIVE WITH FULL ENTURA HYBRID MICROGRID CONTROL STEADYSUN CLOU

  9. Slide 9: Agnew Hybrid Renewable Microgrid

    AGNEW HYBRID RENEWABLE MICROGRID Project recap Energy & Mines | James Koerting | 4 August 2020

  10. Slide 10: Agnew Hybrid Renewable Microgrid: Project recap

    AGNEW HYBRID RENEWABLE MICROGRID 2.1MW 2.3MW Project recap 2.3MW 2.2MW 2.1MW 8.2m/s WIND 11MW SOLAR 2.5MW GAS 2.0MW BESS MINE 15MW Energy & Mines | James Koerting | 4 August 2020

  11. Slide 11: Agnew Energy Production 22 July 2020

    MEGAWATTS 0.0 5.0 10.0 15.0 20.0 25.0 12:00:00 AM 12:30:00 AM 1:00:00 AM 1:30:00 AM 2:00:00 AM 2:30:00 AM 3:00:00 AM 3:30:00 AM 4:00:00 AM 4:30:00 AM 5:00:00 AM Energy & Mines | James Koerting | 4 August 2020 5:30:00 AM 6:00:00 AM 6:30:00 AM 7:00:00 AM 7:30:00 AM 8:00:00 AM Solar 8:30:00 AM 9:00:00

  12. Slide 12: Hybrid Microgrid Derisking

    HYBRID MICROGRID DERISKING Agnew’s process INTEGRATION STAGED DEPLOYMENT TECHNOLOGY ARENA FUNDING IPP CAPABILITY 54% MARKET EOI, RISK APPROPRIATION 6 CIVIL DESIGN 5 GEOTECHNICAL DRILLING 4 CONFIGURATION & SIZING 3 CONSULTANTS, MODELLING 2 RENEWABLE RESOURCE 1 AREMI, SODAR Energy & Mines | James Koer

  13. Slide 13: Agnew Energy Production 22 July 2020

    MEGAWATTS 0.0 5.0 10.0 15.0 20.0 25.0 12:00:00 AM 12:30:00 AM 1:00:00 AM 1:30:00 AM 2:00:00 AM 2:30:00 AM 3:00:00 AM 3:30:00 AM 4:00:00 AM 4:30:00 AM 5:00:00 AM Energy & Mines | James Koerting | 4 August 2020 5:30:00 AM 6:00:00 AM 6:30:00 AM 7:00:00 AM 7:30:00 AM 8:00:00 AM Solar 8:30:00 AM 9:00:00

  14. Slide 14: Agnew Energy Production with Curtailment

    MEGAWATTS 0.0 5.0 10.0 15.0 20.0 25.0 12:00:00 AM 12:30:00 AM 1:00:00 AM 1:30:00 AM 2:00:00 AM 2:30:00 AM 3:00:00 AM 3:30:00 AM 4:00:00 AM 4:30:00 AM 5:00:00 AM 5:30:00 AM 6:00:00 AM Energy & Mines | James Koerting | 4 August 2020 Solar 6:30:00 AM 7:00:00 AM 7:30:00 AM Wind 8:00:00 AM 8:30:00 AM 9:0

  15. Slide 15: Potential Energy Production with Inertia Support

    MEGAWATTS 0.0 5.0 10.0 15.0 20.0 25.0 12:00:00 AM 12:30:00 AM 1:00:00 AM 1:30:00 AM 2:00:00 AM 2:30:00 AM 3:00:00 AM Energy & Mines | James Koerting 3:30:00 AM 4:00:00 AM 4:30:00 AM Solar | 4 August 5:00:00 AM 5:30:00 AM 6:00:00 AM 6:30:00 AM 7:00:00 AM 7:30:00 AM 8:00:00 AM 8:30:00 AM 9:00:00 AM 9:

  16. Slide 16: Potential Energy Production with Inertia Support + Storage

    MEGAWATTS 0.0 5.0 10.0 15.0 20.0 25.0 12:00:00 AM 12:30:00 AM 1:00:00 AM Energy & MinesSolar 1:30:00 AM 2:00:00 AM 2:30:00 AM 3:00:00 AM | James Koerting 3:30:00 AM 4:00:00 AM 4:30:00 AM 5:00:00 AM Wind | 4 Renewables 5:30:00 AM 6:00:00 AM 6:30:00 AM 7:00:00 AM 7:30:00 AM 8:00:00 AM August 2020 with

  17. Slide 17: Microgrid Formula for Emissions Reduction

    MICROGRID FORMULA FOR EMISSIONS REDUCTION RENEWABLES + INERTIA + STORAGE + THERMAL BACKUP = 99% EMISSIONS REDUCTION

  18. Slide 18: Renewable Microgrid Derisking: Agnew's lessons

    RENEWABLE MICROGRID DERISKING Agnew’s lessons CAPACITY FACTORS WIND: TWICE THE CF SAME COST STORAGE BATTERY, POTENTIAL ENERGY, H2 INERTIA SYN CON, FLYWHEELS 99% 6 PIPELINE VS LNG VS DIESEL 5 AT 99% THERMAL IS A CONTINGENCY 4 BESS DESIGN 3 EXPANDABLE DC BUS FOR STORAGE 2 GAS SUPPLY 1 DESIGN FOR NO FL

  19. Slide 19: Thank you

    Thank you JAMES KOERTING GOLD FIELDS AUSTRALIA