    i STILLWATER MINING COMPANY RBC GLOBAL MINING & MATERIALS CONFERENCE June 15, 2016

  2. Slide 2: Forward-Looking Statements

    SOME STATEMENTS CONTAINED IN THIS PRESENTATION ARE FORWARD-LOOKING STATEMENTS WITHIN THE MEANING OF SECTION 27A OF THE SECURITIES ACT OF 1933, AS AMENDED, AND SECTION 21E OF THE SECURITIES EXCHANGE ACT OF 1934, AS AMENDED, AND, THEREFORE, INVOLVE UNCERTAINTIES OR RISKS THAT COULD CAUSE ACTUAL RESULT

  3. Slide 3: Stillwater Mining Company Overview

    STILLWATER MINING COMPANY OVERVIEW World-class assets, stable jurisdiction, highest-grade Platinum Group Metals (PGMs) deposit in the world Operational Highlights © Leading low-cost PGM producer © Business segments: Montana Mines and Recycling 520.8k oz mined in 2015 ® Total historical production of

  4. Slide 4: Disciplined Team with a Focus on Shareholder Returns

    DISCIPLINED TEAM WITH A FOCUS q ON SHAREHOLDER RETURNS EE Board of Directors Shares Outstanding (3/31/2016) Independent Leadership with a Strong Market Capitalization (6/8/2016) Mining Focus. Share Price (6/8/2016) Brian Schweitzer — Non-Executive Chairman Platinum Investment Management Ltd Mick McM

  5. Slide 5: Stillwater Mine – Operations began in 1986

    Operations began in 1986 Mill design capacity of 3,000 tpd, historical recovery of 92% 80,900 ounces produced in Q1 2016, a 3.3% reduction from 83,700 ounces produced in Q1 of 2015 Cash costs' of $446/oz in Q1 2016, down 16.0% from $531/oz in Q1 2015 Total employees (non-project) at the end of Q1 20

  6. Slide 6: East Boulder Mine – Operations began in 2002

    Operations began in 2002 Mill capacity of 2,000 tpd, mill recovery of 91% in 2015 56,400 ounces produced in Q1 2016 (record high), a 13.7% increase from 49,600 produced in Q1 of 2015 Cash costs! of $446/oz in Q1 2016 (record low), down 18.5% from $547/oz in Q1 2015 20,400 oz produced in March (recor

  7. Slide 7: Low-Cost PGM Producer

    LOW-COST PGM PRODUCER f 2016E All-in Sustaining Costs (AISC) by PGM Asset (assumes BofA forecast SWC AISC of $648/ounce) Stillwater Mines. sustaining costPGM oz 8 3287 4382 5478 6574 7670 8765 10957 12053 PGM production, cumulative Norilsk Two rivers mStilwater Mototolo mMogalakwena Booysendal =Maru

  8. Slide 8: Smelter, Base Metal Refinery and PGM Recycling

    Smelter Base Metal Refinery 2 furnaces - provides Significant operating operational risk mitigation leverage Recovery of Cu and Ni Minimal incremental by-products provide capital needs credits and serve as PGM collectors for smelting catalyst Produces palladium, platinum, rhodium-rich filter cake PG

  9. Slide 9: PGM Recycle Ounces Fed

    PGM Recycle Ounces Fed 160,000 L 440,000 = as 120,000 —_—- i a 400,000 Qa Q4 Qi Q2. Qs a4 Qi Q2 2014 2014 2015 2015 2015 2015 2016 2016 (est. Recycling market improving with the recovery of PGM and scrap steel prices Significant capacity in metallurgical complex that provides ability to grow with mi

  10. Slide 10: Scrap Steel Price and PGM Recycle Correlation

    SCRAP STEEL PRICE AND PGM RECYCLE q CORRELATION sang Scrap Steel Price and SWC Recycle Volume $300 40 $250 36 5 30 ie >. ; $200 26 3 8 $150 203 -_ 74 $ stoo g <) 10 $60 -— es + i) © © © © © © © © SF PS SF FASS FS Le ~~ Scrap Steel Price --Total PGM Tons Fed/Day & There is a significant correlation b

  11. Slide 11: First Quarter Results

    FIRST QUARTER RESULTS Mined Production Ounces (000’s) (Combined palladium and platinum) Average Realized Price (per mined ounce) Total Cash Costs (per mined ounce net of credits)" All-In Sustaining Costs (per mined ounce)! General and Administrative Expenses (millions) Sustaining Capital Expenditure

  12. Slide 12: Delivery on Guidance

    DELIVERY ON GUIDANCE y Original 20: Updated Guidance 2015 Guidance | Result Mined Production Ounces (000's) — _ (Combried palladium and pletinum) 520.8 520-535 500-515 Ss Total Cash Costs (per mined ounce net of credits)' $495 $480 - $520 $490 - $530 All-In Sustaining Costs (per mined ounce)* $709 $

  13. Slide 13: 2016 Guidance

    2015 2016 Guidance Actual (May 6, 2016) Mined Production Ounces (000's) 515 —535 (Combined pallacium and platinum) Total Cash Costs (per mined ounce net of credits)" g $445 - $485 All-In Sustaining Costs (per mined ounce)* g $615 - $665 General and Administrative (millions) $30 - $40 Exploration (mi

  14. Slide 14: Enviable Balance Sheet

    ENVIABLE BALANCE SHEET Retired $30M 8% Revenue Bonds Cash and Cash Equivalents Plus Highly Liquid Investments Repurchased $63.3M 6 nae of Convertible Debt for $61.0M $500 — = 2 $452.4M = $450 — — — — — - @ $400 — — — — — — a — $350 222014 Q32014 Q42014 Q12015 Q22015 3.2015 Q42015 ~ Q12016 = Conserva

  15. Slide 15: Ounces per employee increased as AISC improved

    » Ounces per employee have increased at both mines as all-in sustaining costs (AISC)' and productivity have improved s Increasing productivity offers the best route for further AISC reductions towards the new goal of the mid to high $500’s Fixing the historical structural issue in the business of lo

  16. Slide 16: Productivity Improvements

    PRODUCTIVITY IMPROVEMENTS i s Decline advance rates have increased significantly in 2016 8? May development rates in the Blitz 56 Incline increased by 69% compared to 2015 average and still increasing Blitz 56 Incline Development Rates (m/month) 120 100 80 60 40 20 2013 2014 2015 Jan 16 Feb 16 March

  17. Slide 17: Mine Productivity

    MINE PRODUCTIVITY 2 At the Stillwater Mine, stoping productivity has increased by 27.4% since the start of the year 2 Similar trend for capital development productivity and reduction in unit rates — sustaining capital being reduced while maintaining developed state Stillwater Mine Stope Tons/employe

  18. Slide 18: Blitz: Key development project

    2 Key development project — looking to accelerate development and ramp up > Overall grades consistent with historical off-shaft (0.6-0.7 ounce/ton) Benbow portal construction almost complete Contract awarded for Benbow decline 2 First production expected in 2018 — 150,000 to 200,000 PGM ounces/year

  19. Slide 19: Projects – Blitz

    PROJECTS - BLITZ GOLDEN GATE BRIDGE 1.7miles BLITZ PROJECT 10,000E Stope Block 61,000 ounces @6.690pt PGM oan ane erFaK aon zoe total ° (itech em 2 ° oimanrcu B80 oy tia 1.989066 ont PM, EAB) 1980.8 cet PGI 0 29 1Se0tPGU ~ STILLWATER ___ MINE en . PROVEN AND PROBABLE PGM —— TBM DRIVE a (7) Biivz pro

  20. Slide 20: Projects – Conceptual Lower East Boulder

    PROJECTS - CONCEPTUAL LOWER EAST BOULDER EAST BOULDER MINE SHOWING LOWER EAST BOULDER PROJECT LOWER EAST BOULDER PROJECT - YEAR 3 FROG POND. “Aoi sumpson crook EAST BOULDER MINE SHOWING LOWER EAST BOULDER PROJECT LOWER EAST BOULDER PROJECT - YEAR 25 ———— — EXISTING DEVELOPMENT — PLANNED DEVELOPMENT

  21. Slide 21: Evaluating all alternatives to realize value (Altar)

    Evaluating all alternatives to realize value Large porphyry copper-gold project in San Juan Province, Argentina MI+I contained! Cu of 8.1Mt and 6.3M oz Au — in the top 15 largest undeveloped Cu assets globally Previous exploration by Stillwater was focused on the existing resource Recently completed

  22. Slide 22: Projects – Altar Drilling

    PROJECTS — ALTAR DRILLING s2 New discovery of copper-gold porphyry 400m SE of QDM sz Hole QDM029 significantly extended the gold mineralization and encountered first copper mineralization at QDM Ww 2,355,500mE NEW DISCOVERY at QDM GOLD EQUIVALENT LONG SECTION (looking north) \ 43-104 pit \, outing ‘

  23. Slide 23: Projects – Altar Conceptual Plan

    PROJECTS — ALTAR CONCEPTUAL PLAN S 6514,500mn 6,515,000mN 6,516,500mN ASL 4200 ALTAR U/G NSR LONG SECTION (looking west) Net Smelter Return $USDitonne [iy $5-$15 Hl $15-S30 [1 >s30

  24. Slide 24: Platinum and Palladium market

    Platinum Palladium (100) (200) (00) (300) o (400) EP Co Po (om) (700) (1,600), 25 «WE «OTE |—=«CMOE«=«CDONE Wie —«KE—«CDOITE «OE |—«DOTGE Saree HSBC Joy 1, 2016 soe HBC “Janay 1,2018 ie ae _ == ‘oe a 2 S——S= rs 2018 014 2015 2016 2017 18) 2010 Sauce: Goanoa, oer Rese -Ap 29,2018 300 Bi ia 21 016 17

  25. Slide 25: Significant Market Support Over the Long-Term

    SIGNIFICANT MARKET SUPPORT OVER THE LONG-TERM Platinum Long Term Price Analysis Palladium Long Term Price Analysis 49% Potential Upside 43% Potential Upside 4,600 900 650 4,075 4,000 Gale Spot Price LT Min LT Max Spot Price UT Min LT Max Sas Beker Rasen fon 28 2016 sour: ter Reson Ap 28,016 % of Bro

  26. Slide 26: Investment highlights

    World-class PGM mining and recycling assets 2 Stable jurisdiction Superior liquidity profile » Ability to withstand volatile PGM market « Capacity to invest at the bottom of the cycle » Conservative balance sheet Successfully reducing costs and now a low-cost producer Disciplined focus on mining eco

  27. Slide 27: Appendix

    APPENDIX June 2016 Investor Presentation

  28. Slide 28: Montana Operations

    MONTANA OPERATIONS mt) Tietauwureicat comptex, RECYCLING FACILITIES ) | \ opt excouy MINE clam’ a ARK COUNT Stiuwaren Mine

  29. Slide 29: Environmental Excellence

    ENVIRONMENTAL EXCELLENCE i Environmental excellence is a competitive differentiator, positioning the Company as a supplier-of-choice 2015 SO, Emissions vs. Permitted Limit State-of-the-art dual alkaline scrubbing system . reduces gases discharged from smelting to 3% of i permitted loads to the envir

  30. Slide 30: Demand by End Market – 2015

    DEMAND BY END MARKET — 2015 Palladium Platinum 2% 1% 1% 5% 10% a, 5% 6% 43% 35% 76% 3% 3% 7% Autocatalysts = Chemical = Dental Autocatalysts = Chemical mElectrical = Jewelry ‘= Other Electrical =Glass Jewelry ™ Medical & Biomedical Petroleum Other Souree’ Johnson Matthey, excludes investment demand

  31. Slide 31: 2015 Primary Palladium Production

    2015 Primary Palladium Production is me WP south afical Zimbabwe 41%. = af \ Source: Johnson Matthey, Company reports

  32. Slide 32: Global PGM Supply – 2015

    GLOBAL PGM SUPPLY — 2015 i Palladium Platinum Rhodium Total % of Primary % of Primary % of Primary % of Primary (ounces '000s) Ounces Production Ounces Production _ Ounces _ Production _Ounces _ Production canada 464 % 201 3% 20 3% 685 5% & Russia 2034 38% 670 11% 80 11% 3,184 24% } South Africa 2,6

  33. Slide 33: Long-Lived PGM Reserves in Montana

    LONG-LIVED PGM RESERVES INMONTANA 9 Nearly 20 million oz. of proven and probable palladium and platinum ore reserves & 78% of reserves are palladium = Implies a 35-40 year reserve life at current production rates © Average ore reserve grade of 0.46 oz./ton (15.77 gram/tonne) stllwater Mine East Boul

  34. Slide 34: Blitz Project Drilling Data

    BLITZ PROJECT DRILLING DATA Blitz project drill detail — 5000 East level 37919 40178 40178 40178 40179 40180 40180 40224 40225 40273 40308 40308 40309 40309 40309 50E89) 50E8 9 50E8 9 50E8 9 50E8 2 50E89 50E69 50E8 9 50E¢ 9 50E8 9 50ES 9 50E8 9 S0E89 50E8.9 50E89 Mine Grid Mine Grid Mine Grid Drill

  35. Slide 35: Blitz Project Drilling Data

    BLITZ PROJECT DRILLING DATA Blitz project drill detail - 5600 East level egrees) From {feet Drill Hole Mine Grid Mine Grid Mine Grid DrillHole Angle DoHis__Program Collar X__Collar¥ Collar Z_ Azimuth 9207 SEES. ‘7 2816~=«C«S62B_—=« BOCA 39208 S5Ea8 97728165628 390-270 39209 S5E98 S777 2a16 562538901

  36. Slide 36: Blitz Project Drilling Data

    BLITZ PROJECT DRILLING DATA i Blitz project drill detail - 5600 East level (cont. Dil Hole stim Mine Grid Mine Grid Mine Grd DrilHole Angle Length Prspd Tue Width oi tram al ale cit toh Segee) Grom) feel os) ai) eile) sono Sens Sve ase Seas 1 Tee 100 a a a ee er ny Cy er seen SESE © «974 «2H SE{S_«S

  37. Slide 37: Blitz Project Drilling Data

    BLITZ PROJECT DRILLING DATA i Blitz project drill detail - 5600 East level (cont. Drill Hole Estimated Mine Grid Mine Grid Mine Grid OriltHole Angle Length PtsPd True Width DbHe__Program __CollacX__collar¥__CollarZ_Azimuth (Degrees) from {fect) To(fect) (feet) __Pt{opt) _ed(opt) opt) fect) “40467 Se

  38. Slide 38: Blitz Project Drilling Data

    BLITZ PROJECT DRILLING DATA Blitz project drill detail - 5600 East level (cont.) “40427 40427 40428 40028 40829 40829 40829, 40430 40420, 40431 40481 40422 40432 40432 40439, 40402, 40482 40438 oan 4oa12 40491 40410 ‘SEE10.4 SeE10.4 5610.4 s6e10.4 S6E10.4 S6E10.8 5610.4 566104 S6e10.4 566104 S6e10.4

  39. Slide 39: Blitz Project Drilling Data

    BLITZ PROJECT DRILLING DATA i Blitz project drill detail - Surface Drill Hole Estimated Mine Grid Mine Grid Mine Grid DrilHole Angle From Length Pt+Pd True Width DDH __Program _CollarX__CollarY__CollarZ_Azimuth (Degrees) (fect) Tofeet) (feet) ___Pt(opt) _ed(opt) opt) feet) 36098 Surface 12103 ~—~«36

  40. Slide 40: Altar Technical Report Disclosure

    ALTAR TECHNICAL REPORT DISCLOSURE A, Total Altar and Quebrada de La Mina, Mineral Resources" Gator TWineral Resources Contained Metat ciassiicavon | Grae [Ore Tota | Sulfide | Gold] Siver | Arwen | Soltdece] Gold | Siver se s/t | Ktonnes cu | cux | cme | cmt _| x | milion tbs | 0251000 | 02s 1000 hs

  41. Slide 41: Altar Project Drilling Data – 2016

    ALTAR PROJECT DRILLING DATA — 2016 i Altar project drill detail — 2016 Campaign Drill General Collar* Collar* Collar* Azimuth Dip__—Total. Down-Hole Copper Gold Hole 1D Location astm _Northm _Elevm Degrees _Degrees_Depthm Drilled m Fromm Tom _intervalm percent g/t ALD 206 AlterEast 2360970 6,516,590

  42. Slide 42: WAAR ce AcPROSEC

    WAAR ce AcPROSEC OTB |DnilProgrants “[ea)and ALES) catcultet using S27 55 CHENISTHZOCBY)

Stillwater Mining — RBC Global Mining & Materials Conference 2016 on 6ix