  1. Slide 1: Oyu Tolgoi – A world-class copper and gold mine

    Exhibit 99.1 A final of This relating Oyu December theTolgoi document final prospectus to the 3,prospectus, – 2013 asecurities does world-class containing notand offered, provide copper anyimportant amendment, full before anddisclosure gold making information mine is required of anall investment rel

  2. Slide 2: Forward-looking Statements and Cautionary Note

    Forward-looking This “forward-looking historical results information results. Statements” Annual investment your Investors description Cautionary produce. "measured U.S. 40-F, Qualified The 2releases contents United technical presentation registered own asand For Information amended, naming We are f

  3. Slide 3: Key investment highlights

    35421Long-term World Pure copper Flexible Commenced Partnership class growth growth with asset, and production, profile gold best-in-class opportunity strategically exposure with cashfurther operator flow located withgeneration prospectivity attractive and developer industry in 2014 fundamentals

  4. Slide 4: Copper: Oyu Tolgoi is a top-tier asset on the cost curve

    Copper 350 400 0250 Oyu Third Top One Source: Normal 1. 42. 5,000 Wood Metals Oyu 200 10 of Tolgoi largest the copper mine 10,000 Wood C1 150 Mackenzie, Tolgoi Economics largest cost –100 iscopper cost ain Mackenzie deposit tier 15,000 Other +the 50 curve gold sustaining 1first mine 2020 asset Group

  5. Slide 5: Copper fundamentals remain strong

    Fundamentals Copper Ongoing Prices 5Marketexpected anticipates continues market attrition for likely toat to copper remain a existing expect deficit to see remain above strong again small mines historical strong towards surplus demand driven in the by levels, from coming structural endChina despite

  6. Slide 6: Strategically located with large scale and long life

    Strategically Strategic At Near-term Long-life 2.2bt 1.5bt 10 332,000t 495,000oz. 2.3Moz. Source: The 6mineral the year mineral measured mineral doorstep averages resources. 2013 of of location: mine and silver of copper reserves located Oyu reserve, gold large & ofof: indicated the Tolgoi inscale:

  7. Slide 7: Our people, safety performance and impact in Mongolia

    OurInjury All HSE Mongolians Over Partnered $126People, System $1 million billion with Frequency Our now certified investment more inImpact occupy taxes, than Rate to ISO pre-payments in more 1,300 performance education 14001 than local90% and suppliers and and good OSHAS oftraining fees roles atove

  8. Slide 8: From initial production to commercial operations

    From Initial Q1’13 First Shaft Q2’13 Open Commercial Q3’13 Commenced Concentrator Underground Customers Q4’13 72,000 8We expect copper-gold #2 pit construction construction to80% slowed 77,000 to begin production sinking shipping produce continued reaches development of final to collecting tonnes co

  9. Slide 9: Current underground development plan and feasibility study

    Current Feasibility 9Core team development ready study for progressing quick plan restart and of on the track underground for H1 2014development completion

  10. Slide 10: Potential expansion options being evaluated

    Potential All Actual A decision options operating forto being significant expand performance evaluated thedevelopment concentrator to will ensure inform opportunities optimum will choice not be development of required expansion forpathway apath couple years 10

  11. Slide 11: Vast resources and exploration potential

    *11 Vast resources Already Mineralized Exploration Effort *Hugo 1.Metals focused West ranked and Economics further continues trend is on an inpotential interesting at theleast Group top prospectivity with26km ten targets modest and exploration copper 2013 which expenditure resources Oyutarget could

  12. Slide 12: Funding: rights offering and project financing

    Funding Offering Rights Objectives Main Fund Repay Diversify One Proceeds Approximately Record Commitments Ongoing Discussions Project 12 right ongoing New Financing financing date adiscussions will sources per priority Bridge with –share be December development of1 used approximately billion Govern

  13. Slide 13: Turquoise Hill summary

    Turquoise Pure Concentrator Feasibility Progressing Significant Strategically 13 copper Hill study growth, Project and located at–full gold atolong be development Financing capacity, resources exposure complete term growth generating for with with inand funding H1 further expansive opportunity expan

  14. Slide 14: Additional offering information

    Additional offering Turquoise charge Alternatively, 14 bytovisiting Hill which information Turquoise hasthis SEDAR filed communication aHill with prospectus at will the www.sedar.com Canadian arrange with relates. to the securities send Before securities or EDGAR the regulatory prospectus shareholde