  1. Slide 1: Emerging Gold Producer in the Arabian-Nubian Shield

    EMERGING GOLD PRODUCER IN THE ARABIAN-NUBIAN SHIELD INVESTOR PRESENTATION 29 JUNE 2015 FOCUSING ON OUTCOMES OF 2015 DEFINITIVE FEASIBILITY STUDY FOR TULU KAPI GOLD PROJECT IN ETHIOPIA NORMAN LING, DIRECTOR OF KEFI MINERALS WAYNE NICOLETTO, MANAGING DIRECTOR KEFI MINERALS ETHIOPIA

  2. Slide 2: Disclaimer

    DISCLAIMER The information contained in this document (“Presentation”) has been prepared by KEFI Minerals plc (the “Company”). While the information contained herein has been prepared in good faith, neither the Company nor any of its shareholders, directors, officers, agents, employees or advisers g

  3. Slide 3: Timetable to Initial Production at Tulu Kapi

    TIMETABLE TO INITIAL PRODUCTION AT TULU KAPI Q3-15 • Optimise financing structure and syndicate • Arrange full development funding Q4-15: • Commence major construction works 2016: • Build workforce of 700 + 300 for construction • Start commissioning 2017: • Gold production 3

  4. Slide 4: Ethiopia – KEFI's First Production Centre

    ETHIOPIA – KEFI’S FIRST PRODUCTION CENTRE KEFI’S IN-COUNTRY FRAMEWORK • Ethiopia: 15 years of 7-10%pa GDP growth. Extractive industries now prioritised for development • Mining Agreement signed in April 2015 and includes: • Mining Licence covering an area of 7km2, for a period of 20 years • Fully pe

  5. Slide 5: Corporate Summary

    CORPORATE SUMMARY Focused on gold and copper in the highly prospective Arabian-Nubian Shield Ethiopia: 100% of KEFI Minerals Ethiopia (KME), which has 100% ownership of Tulu Kapi, with Gov’t right to 5% free carry o Investors’ outloook re Tulu Kapi project : o At $1,250/oz: o EBITDA c. $45M p.a. (un

  6. Slide 6: Ethiopia Tulu Kapi Gold Project Site

    ETHIOPIA TULU KAPI GOLD PROJECT SITE

  7. Slide 7: Tulu Kapi on Track for Production 2017

    TULU KAPI ON TRACK FOR PRODUCTION 2017 • Project plans completely overhauled by KEFI. Tulu Kapi is now robust and financeable • Mining Licence and all major permits approved • DFS completed in June 2015 and now being reviewed by the banks’ independent experts • New lands have been selected by the di

  8. Slide 8: Geology – Drill Holes in Tulu Kapi Deposit

    GEOLOGY – DRILL HOLES IN TULU KAPI DEPOSIT Drill hole spacing: • Main central area – 40m x 40m with some areas 20m x 20m • Outside central area – ranges from 40m x 40m to 80m x 80m 8

  9. Slide 9: Ore Reserves

    ORE RESERVES Ore Reserve totals 15.4 million tonnes at 2.12g/t gold, containing 1.05 million ounces: Cut-off Tonnes Gold Ounces JORC (2012) Reserve category (g/t Au) (million) (g/t) (million) Probable - High grade 0.90 12.0 2.52 0.98 Probable - Low grade 0.50 - 0.90 3.3 0.73 0.08 Total 15.4 2.12 1.0

  10. Slide 10: Tulu Kapi Open Pit, High Grade Underground for Expansion

    TULU KAPI OPEN PIT HIGH GRADE UNDERGROUND FOR EXPANSION 15

  11. Slide 11: Key Open Pit Mining Parameters

    KEY OPEN PIT MINING PARAMETERS Conventional open-pit drill and blast mining , load and haul on 7.5m benches, reflecting a semi-selective mining approach using 120 tonne backhoe configured excavators. Key pit slope design recommendations: • standard minimum berm width is 6.0m for 15m high batters, in

  12. Slide 12: Key Open Pit Mining Parameters

    KEY OPEN PIT MINING PARAMETERS • Conventional open-pit mining operation and a 1.2Mtpa carbon-in-leach (“CIL”) processing plant • Utilising semi-selective mining techniques, it is planned to: • process ore mined above 0.9g/t gold for first ten years; and • stockpile ore mined between 0.5g/t gold and

  13. Slide 13: Capex and Unit Operating Costs

    CAPEX AND UNIT OPERATING COSTS Components of the estimated peak funding requirement based on contract mining and an all-new processing plant: US$ millions Processing 65.6 Infrastructure 19.7 Tailings (TSF) 7.5 Indirects (EPCM, etc) 14.3 Owners Cost 8.9 Subtotal 113.0 Pre-Production Funding 2.4 Worki

  14. Slide 14: Key Financial Parameters for Tulu Kapi Open Pit

    KEY FINANCIAL PARAMETERS FOR TULU KAPI OPEN PIT Unleveraged Leveraged IRR 28% 52% NPV (0%) US$263M US$187M NPV at start construction 2015 (8% real discount US$125M US$106M rate) NPV at start production 2017 US$256M US$156M (8% real discount rate) Payback 2.5 years 4.5 years Average Operating cash fl

  15. Slide 15: Financial Sensitivities

    FINANCIAL SENSITIVITIES NPV Sensitivity Analysis IRR Sensitivity Analysis 300 60.0% 250 50.0% 200 40.0% 150 30.0% IRR NPV 100 20.0% 50 10.0% 0 30% 20% 10% Base Case -10% -20% -30% 0.0% -50 30% 20% 10% Base Case -10% -20% -30% -10.0% -100 Gold Price Capex Opex Gold Price Capex Opex Sensitivities for

  16. Slide 16: Processing Plant - Flowsheet

    PROCESSING PLANT - FLOWSHEET 1 2 3 4 5 6 7 8 Sections: ROM Hard Rock Crushing Area Hoist Trash Linear Screen A Static Grizzly Phase 2 secondary FUTURE crushing circuit A for harder ore • Crushing, stockpiling ROM Bin Cyclone Cluster Apron Feeder Primary Jaw Crusher and reclaim B Primary Crusher Seco

  17. Slide 17: Mining Licence Layout

    KEFI MINING LICENCE LAYOU MINERALS 7eqp08 751900 702000 703000 Keley to Tulu Kapi INew Access Road EXlopen Pit Limit Crit Blast Limit T ooamn0 Mine Maintenance Se N to Mine rat Access Road J i ~ J [Administration & —- bypass Road nin Mine Maintenance Existing Road a lAccess Road Pre-rnining Road 720

  18. Slide 18: Environmental and Social

    ENVIRONMENTAL AND SOCIAL • Project modus operandum is industry standard with 100’s of examples internationally • Cyanide destruct circuit designed into process plant and no acid mine drainage issues due to lack of sulphides • Ample provision for use of international expertise and training of local w

  19. Slide 19: Timetable to Initial Production at Tulu Kapi

    TIMETABLE TO INITIAL PRODUCTION AT TULU KAPI Q3-15 • Optimise financing structure and syndicate • Arrange full development funding Q4-15: • Commence major construction works 2016: • Build workforce of 700 + 300 for construction • Start commissioning 2017: • Gold production 19

  20. Slide 20: Contacts

    CONTACTS Harry Anagnostaras-Adams, Executive Chairman Mobile: +357 99457843 Jeff Rayner, Exploration Director Wayne Nicoletto, Head of Operations England - Registered office Cyprus - Group corporate team Ethiopia - Development and exploration teams Saudi Arabia - Exploration team Turkey - Support Em

  21. Slide 21: Appendices

    KEF] 2015 DFS MINERALS APPENDICES

  22. Slide 22: 2015 DFS

    2015 DFS The following slides provide further information to KEFI’s 2015 DFS announcement dated 24 June 2015 and are arranged as follows: • Human resources • Geology, Mineralisation and Exploration • Mineral Resources and Ore Reserves • Mining and Processing • Location and Infrastructure • Environme

  23. Slide 23: Location and Infrastructure

    LOCATION AND INFRASTRUCTURE • Tulu Kapi is located in Western Ethiopia, in the Western Wellega Zone of the Oromia Region approximately 360 km due west of Addis Ababa • The Project is accessible by main road from Addis Ababa, a distance of 520 km • The project area is about 9 km south of the village

  24. Slide 24: Directors of KEFI Group Companies

    DIRECTORS OF KEFI GROUP COMPANIES FOUR WITH KEFI SINCE FOUNDING IN 2006 Ian Plimer Harry Anagnostaras-Adams Non-Executive Deputy Chairman Executive Chairman Numerous geology Professorships including Founder or co-founder Citicorp Capital Investors Newcastle, Melbourne, Munich and Adelaide Australia,

  25. Slide 25: Experienced Development Team

    EXPERIENCED DEVELOPMENT TEAM Kebede Belete Country Manager Ethiopia Fabio Granitzio Geologist (PhD, Austria; MPhil, UK; BSc, Ethiopia). Exploration Manager Over 25 years of experience working in exploration Geologist (PhD. Cagliari, Italy). Track record of gold projects as Exploration Manager and Co

  26. Slide 26: Experienced Specialist Consultants

    EXPERIENCED SPECIALIST CONSULTANTS SENET SNOWDEN Ore Processing, Infrastructure and DFS Coordination Mineral Resources and Ore Reserves EPOCH CUBE CONSULTING Tailings Management Grade control and Optimisation GOLDER ENDEAVOUR FINANCIAL Environmental and Social Impact Project Finance Adviser and Arra

  27. Slide 27: Planned Organisation Structure at Tulu Kapi

    PLANNED ORGANISATION STRUCTURE AT TULU KAPI The mine creates ≈700 jobs during operations Majority of workforce will be recruited locally 27

  28. Slide 28: The People of Tulu Kapi

    THE PEOPLE OF TULU KAPI People living at and near Tulu Kapi: • Major source of income is production and sales of coffee • Food is self-sufficient; cereal and grain crops, fruits, vegetables, livestock • Schools, health services, roads, local government, water and markets available within short walki

  29. Slide 29: Geology - Competent Persons Statement

    GEOLOGY - COMPETENT PERSONS STATEMENT The information in this presentation that relates to exploration results, Mineral Resources and Ore Reserves is based on information compiled by Mr Jeffrey Rayner. He is the Exploration Director of KEFI Minerals and a Member of the Australasian Institute of Mini

  30. Slide 30: Geology - Regional Setting

    GEOLOGY - REGIONAL SETTING 30

  31. Slide 31: Geology - Ethiopia

    KEFI MINERALS OLOGY - ETHIOPIA ETHIOPIA: GEOLOGY and GOLD POTENTIAL ‘SUDAN Sey \ey * 7 somaual South SUDAN Geology of Ethiopia includes: Precambrian basement (north, western & Southern parts) Mesozoic Sediments Tertiary and Quaternary sediments and volcanic Ethiopian gold occurrences & deposits are

  32. Slide 32: Geology – Regional and Local

    GEOLOGY – REGIONAL AND LOCAL 32

  33. Slide 33: Geology – Mine Scale

    KEFI MINERALS GEOLOGY — MINE SCALE - x - ~ ~ tad f : a ( " j on ( mt ms [Geological Map of Tul Kapi Gold Resource Area ific mineral_rich syenite old bearing albitised Syenite with isseminated sulphide Sheared albitised syenite with concordant mineralized quartz > Tulu Kapi resource area is dominantl

  34. Slide 34: Mineral Resources

    MINERAL RESOURCES Mineral Resource totals 20.2 million tonnes at 2.65g/t gold, containing 1.72 million ounces: Cut-off Tonnes Gold JORC (2012) Resource category Reporting elevation Ounces (million) (g/t gold) (Mt) (g/t) Indicated Above 1400 RL 0.45 17.7 2.49 1.42 Inferred Above 1400 RL 0.45 1.28 2.0

  35. Slide 35: Geology – Near-Mine Exploration Targets

    GEOLOGY – NEAR-MINE EXPLORATION TARGETS 35

  36. Slide 36: Processing Plant – Key Process Design Criteria

    PROCESSING PLANT – KEY PROCESS DESIGN CRITERIA 36

  37. Slide 37: Processing Plant - Metallurgical Testwork

    PROCESSING PLANT - METALURGICAL TESTWORK Tulu Kapi gold is free milling and all the processes included in the CIL plant design are standard and common to many current gold operations 37

  38. Slide 38: Processing Plant - Metallurgical Testwork

    PROCESSING PLANT - METALURGICAL TESTWORK Grade-Recovery Curves • Overall life-of-mine gold recoveries are 100.0% estimated to be 91.5% 95.0% • Steady increase in recovery as the Calculated Recovery head grade increases 90.0% • Recovery declines as the ore becomes more competent 85.0% • Recoveries ra

  39. Slide 39: Processing Plant - Comminution Testwork

    PROCESSING PLANT - COMMINUTION TESTWORK Fresh Comp Fresh Comp Test Unit or Type Oxide Comp Lode1 Lode2 Abrasion Index g 0.3139 0..3898 0.6522 BRWi kWh/t 11.3 12.2 19.7 BBWi (106µm) kWh/t 15.5 15.5 18 A× b 111.9 81.8 38.6 JK Drop Weight ta 1.07 0.72 0.29 Optimum grind 80%-75µm Optimum cyanide additio

  40. Slide 40: Processing Plant - Ore Characteristics

    PROCESSING PLANT - ORE CHARACTERISTICS Description Unit Oxide Shallow Fresh Deep Fresh Ore Type Oxide Fresh Harder Fresh Maximum Lump Size F100 mm 800 800 800 Ore Head Grades: Ore Grade - Gold g/t Au 1.78 2.23 2.86 Ore Grade - Silver g/t Ag <2 1.40 1.40 Moisture Content % 5.0 % 5.0 % 5.0 % Water SG

  41. Slide 41: Processing Plant - Operating Costs by Ore Type

    PROCESSING PLANT - OPERATING COSTS BY ORE TYPE 41

  42. Slide 42: Processing Plant – Ore Processing Schedule

    PROCESSING PLANT – ORE PROCESSING SCHEDULE • The processing plant is designed to treat 1.2Mtpa of ore based on crushing utilisation of 67%, mill availability of 96%, optimum grind size of 75 microns and a residence time of 24 hours 42

  43. Slide 43: Environmental and Social

    KEFI ENVIRONMENTAL AND SOCIAL MINERALS Environmental & Social Monitoring & Management Plans Air Quality Dust mitigation and monitoring will be done. The Air Quality Management Plan includes control measures for minimizing dust. Noise & Vibration KEFI will implement a number of measures according to