EnerNOC Inc

EnerNOC — Reg A Offering (June 2012)

11 slides from EnerNOC's offering presentation, June 2012

  1. Slide 1: National Grid STOR Aggregators Meeting

    National Grid STOR Aggregators Meeting June 2012 © EnerNOC Inc.

  2. Slide 2: EnerNOC Issues for Discussion

    EnerNOC Issues for Discussion Issue Recommendation Impact IANU failures unfairly penalise DR Eliminate IANU penalties or Current rules and impose penalties even when align IANU failures with favour generators resources are able to fully perform performance requirements Aggregators’ inability to decl

  3. Slide 3: Moment of Despatch Baseline is Not Appropriate for STOR

    Moment of Despatch Baseline is Not Appropriate for STOR The current STOR Baseline would be fair if call-offs were limited to 30 minutes or less However, STOR call-offs can and usually do last longer than 30 minutes Providers need to be fairly compensated for removing the load from the grid that woul

  4. Slide 4: Issues With the Current (Moment of Despatch) Baseline

    Issues With the Current (Moment of Despatch) Baseline Two issues The current moment of despatch baseline does not fairly compensate assets for the actual load removed from the grid 1. Providers are under compensated when load profile is rising 2. Providers are over compensated when load profile is f

  5. Slide 5: X of Y Baseline - Introduction

    X of Y Baseline - Introduction A “X of Y” profile baseline considers the Y most recent like- days preceding an event and uses data from the X days with the highest load to calculate the baseline. – An example is a high 5 of 10 baseline Non working days, and previous event days are excluded on workin

  6. Slide 6: Rising Profile

    Rising Profile Start End Despatch Despatch Moment of Despatch Baseline 6

  7. Slide 7: Falling Profile

    Falling Profile Start End Despatch Despatch Moment of Despatch Baseline 7

  8. Slide 8: X of Y Day-Of Baseline Adjustment

    X of Y Day-Of Baseline Adjustment Baseline adjustments are necessary to more accurately reflect load conditions on the day of despatch. While the baseline predicts the shape of a facility’s energy usage, the baseline adjustment predicts the magnitude of a facility’s energy usage on a given day. Symm

  9. Slide 9: Baseline Adjustment - Example

    Baseline Adjustment - Example DR Dispatch (2- 6pm) Adjustment Window (11-1pm) 9

  10. Slide 10: Performance Baseline - Recommendations

    Performance Baseline - Recommendations Implement an X of Y baseline (such as 5 of 10) with a day-of adjustment based on load in a pre defined period prior to call-off instruction This would: – Ensure that DR resources are being compensated for removing the load that would exist throughout the event

  11. Slide 11: Summary-Baseline Comparison

    Summary-Baseline Comparison Moment of Despatch Baseline High 5 of 10 Baseline Baseline cannot be predicted in Baseline can be calculated as much advance as 24 hours in advance Single value flat-line baseline Variable baseline, follows general load profile Higher likelihood of measured Higher likelih

EnerNOC — Reg A Offering (June 2012) on 6ix