Purepoint Uranium Group Inc. · TSXV:PTU

Purepoint Uranium — Investor Presentation (October 2018)

21 slides from Purepoint Uranium's investor presentation, Oct 1, 2018

  1. Slide 1: Partnered with two of the world's largest uranium producers

    Partnered with two of the world’s largest uranium producers to explore the most prospective projects in the Athabasca Basin Corporate Presentation - Q4 2018 TSXV: PTU

  2. Slide 2: Disclaimer

    Disclaimer Forward Looking Statements This presentation contains certain “forward-looking statements”. All statements, other than statements of historical fact, that address activities, events or developments that Purepoint believes, expects or anticipates will or may occur in the future are forward

  3. Slide 3: Strategically Positioned in the Athabasca Basin

    Strategically Positioned in the Athabasca Basin High-grade discoveries in Saskatchewan’s Patterson Uranium District • Spitfire discovery (53.3% U3O8 over 1.3 metres within a 10.0 metre interval of 10.3% U3O8) by the Hook Lake JV • Patterson Uranium District hosts Fission’s Triple R Deposit (indicate

  4. Slide 4: Athabasca Basin Portfolio

    Athabasca Basin Portfolio 10 Projects All Active • Advanced stage exploration  Dozen of drill targets well defined  Low priority property all exited  Assessment requirements current • Support and continued spending by two of the largest Uranium Producers in the world • Most speculative phase of i

  5. Slide 5: Strategic Partnership

    Strategic Partnership Hook Lake Project Smart Lake Project Ownership: Ownership: • 21% Purepoint Uranium • 23% Purepoint Uranium • 39.5% Cameco Corporation • 77% Cameco Corporation • 39.5% Orano Canada 2019 Hook Lake Drill Program Budget Cameco Corporation (39.5%) $1,185,000 Orano Canada Inc. (39.5%

  6. Slide 6: Leadership

    Leadership • Chris Frostad (President, CEO, Director) • Roger Watson (Chief Geophysicist) • Current: President & CEO of Minera Alamos Inc. • Previous: 40 yrs Geophysical Consultant and founder of the firm Patterson Grant & Watson • Previous: 30 yrs in various exec. roles in both public and private c

  7. Slide 7: Capital Structure

    Capital Structure Fully funded to continue aggressive exploration programs at Patterson Uranium District As of October 1, 2018 Market Capitalization 13,312,199 Share Price $0.065 52 Week Range: $0.10 - $0.055 Shares Outstanding 204,803,072 Options (@$0.08 weighted avg.) 18,180,000 Warrants (@$0.08 w

  8. Slide 8: Uranium Prices

    Uranium Prices Excess inventory and historic lows in U Prices spurred various tactics reducing global U inventories by 6.5% - 7.5% with ongoing annual reductions expected of 3% to 4% $29 Kazatomprom Kazatomprom Kazatomprom Announces Announces Cameco Announces 20% $27 10% reduction Suspends 20% reduc

  9. Slide 9: Pending Price Correction

    Pending Price Correction Unlike the Spot Price, the LT Price has maintained a steady level of $30-32.00 / lb U3O8 resulting from no significant contracts signed in over two years now $50 $45 Marginal $40 Production Cost $35 $30 $25 LT Price $20 Spot Price $15 2016 2017 2018 2019 As the Spot Price ap

  10. Slide 10: Canada's Prolific Athabasca Basin

    Canada’s Prolific Athabasca Basin Saskatchewan’s High-Grade deposits (ranging from 1% - 20%) result in the lowest cost, open pit and underground uranium mines in the world • 15.6 g/t Gold (U$1,200/oz) One uranium pellet • 1,215 g/t Silver (U$14/oz) Produces the Equivalent Power of: 1% U3O8 = • 10.78

  11. Slide 11: Hook Lake Project

    Hook Lake Project Location Q4 2018 TSXV: PTU 11

  12. Slide 12: Hook Lake Project

    Hook Lake Project Neighbors & Topography • The Patterson Uranium District is a structural corridor situated on the SW edge of the Athabasca Basin, interpreted to extend at least 50 km • The Patterson Uranium District host Fission Uranium’s Triple R Deposit, NexGen’s Arrow deposit and Purepoint’s Spi

  13. Slide 13: Hook Lake Project

    Hook Lake Project Underlying Geology • Latest drill program was completed Mid-April for a total of 12,733 metres in 24 diamond drill holes, guided by 350m step-outs towards the northeast along the 8km Patterson trend • The most important discovery this winter drill season was a large, mineralized gr

  14. Slide 14: Patterson Lake Uranium District

    Patterson Lake Uranium District Spitfire/Harpoon Deposit High-Grade Intersections Hole ID From (m) To (m) Width (m) U3O8 (wt %) HK15-27 389.0 391.8 2.8 2.23 includes 390.4 390.8 0.4 12.9 HK16-37 269.6 275.0 5.5 1.21 includes 269.6 270.2 0.6 9.87 HK16-43 244.05 247.6 3.1 4.07 includes 245.2 245.5 0.3

  15. Slide 15: Patterson Lake Uranium District

    Patterson Lake Uranium District Spitfire/Harpoon Deposit • Three holes drilled at Spitfire, stepping out towards the northeast, hit mineralization extending the strike length by approximately 85 metres • HK18-82 returning 1.04 %eU3O8 over 14.6 metres including 8.7% eU3O8 over 1.3 metres • An additio

  16. Slide 16: Patterson Lake Uranium District

    Patterson Lake Uranium District Spitfire/Harpoon Deposit – Inclined Longitudinal Section Q4 2018 TSXV: PTU 16

  17. Slide 17: Patterson Lake Uranium District

    Patterson Lake Uranium District Dragon Zone • The Dragon shear zone is known to be approximately 200 metres wide and is composed of 3 to 4 separate graphitic shears dipping SE, and tested overt a strike length of 750 metres • As with the Spitfire discovery, the strong hydrothermal alteration is asso

  18. Slide 18: Patterson Lake Uranium District

    Patterson Lake Uranium District 2018 Discoveries • This year’s drilling discovered an untested, previously unidentified, mineralized shear on trend with, and with identical attributes to, Spitfire • The “Primary Shear” (identified in Pink) represents the conductor interpreted to be controlling the k

  19. Slide 19: Patterson Lake Uranium District

    Patterson Lake Uranium District Derkson Corridor Geophysical Survey – Winter 2018 • Derkson represents the third and most easterly band of graphitic conductors crossing through the Hook Lake Project • Diamond drill hole DER-04 was the earliest discovery of uranium mineralization in the area (SMDC 19

  20. Slide 20: Project Pipeline

    Project Pipeline Size Ownership Stage of Purepoint Investment to Next Steps Held Until 10 Projects – All Active Project (hectares) Partners Completion Date 21% Follow Up March Hook Lake 28,598 Discovery $6,750,000 • Precise and strategic approach, securing Cameco & Orano Drilling 2028 highly prospec

  21. Slide 21: Contact Us

    TSX Venture: PTU Contact Us Chris Frostad President & CEO cfrostad@purepoint.ca 416.603.8368 Jeanny So Corporate Communications info@jeannyso.com 647.202.0994 Head Office 120 Adelaide St. West. Suite 2500 Toronto . Ontario . Canada . M5H 1T1 Exploration Office 111- 2nd Avenue South, Unit 530 Saskato

Purepoint Uranium Group — Investor Presentation (October 2018) on 6ix