Winston Gold Corp. · OTC:WGMCF

Winston Gold — Winston Gold Mining — Investor Presentation (November 2016)

28 slides from Winston Gold's investor presentation, November 2016

  1. Slide 1: High Grade. Low Cost. Near-Term Gold Production

    N GOLD M TO I S NI WI N NG WGM Wh g in re e K g ra d e is CSE - WGC OTC - WGMCF HIGH GRADE. LOW COST. NEAR-TERM GOLD PRODUCTION

  2. Slide 2: Safe Harbour

    SAFE HARBOUR The following presentation may include certain “forward-looking statements” within the meaning of the United States Private Litigation Reform Act of 1995 and applicable Canadian Securities Laws. All statements, other than statements of historical fact, included in the presentation, incl

  3. Slide 3: Mission and Vision

    MISS ION Our expert team has acquired two exciting high-grade gold projects and plans to quickly advance both of these assets into low-cost, profitable mining operations. VISION Gold has regained its luster in the market and we believe that the next precious metal super-cycle is just commencing. The

  4. Slide 4: Why Invest

    WHY INVEST WGM has acquired two high-grade gold mining opportunities and intends to advance these mines into production. Resource growth will occur both organ- ically, through exploration, and via quality acquisitions. THE RIGHT TIME THE RIGHT PEOPLE THE RIGHT ASSETS With a Precious Metal WGM has a

  5. Slide 5: Management Team

    Management Team Harold (Mike) Gunsinger Murray Nye Director of Operations CEO and Director Mike has over 5 decades of experience in putting mines Murray served in the capacity of President/CEO of RX into production. In 1982 – 1985 Mike worked as the Exploration. Murray’s communication skills and bus

  6. Slide 6: Management Team

    Management Team Max Polinsky Ben Porterfield Al Fabbro President, CFO and Director Director Director Max has a proven track record, having (M.Sc. University of Arizona). Ben is a Al has over 30 years of experience in both served RX Exploration, an $80 million consultant geologist who has worked in th

  7. Slide 7: The Winston Project

    The Winston Project THE WINSTON PROJECT Located 37 km southeast of Helena, Montana. Year round access by paved road. Excellent infra- structure in a mining friendly jurisdiction. Property hosts the past producing high-grade Custer Vein. There is no modern drilling on this mesothermal vein system. Hi

  8. Slide 8: Untested Opportunity

    The Winston Project UNTESTED OPPORTUNITY Total Production from the Win- Historic records indicate that Modern exploration records a ston district was estimated to the Custer mine was a major database of over 46,000 meters be 100,000 ounces of gold from contributor to this production of drilling in 6

  9. Slide 9: Claim Map & Ownership

    The Winston Project CLAIM MAP & OWNERSHIP Acquired option in July of 2014 TERMS OF AGREEMENT: 4.5 million shares of WGM (issued) US$200,000 per year work commit- ment US$3,500 monthly advance royalty payment until 2019. Lease can be extended to 2021 for US$40,000 cash and US$7,000 month- ly advance

  10. Slide 10: Drill Plan Map

    The Winston Project DRILL PLAN MAP Phase 1 and 2

  11. Slide 11: Long Section of Custer Vein

    The Winston Project LONG SECTION OF CUSTER VEIN 11

  12. Slide 12: The Path to Success

    The Winston Project THE PATH TO SUCCESS Two Phase Advancement plan for Winston Gold Project PHASE I – EXPLORATION PHASE II – TEST MINING/BULK SAMPLING A 5,500 ft (~1,675 m) drill program will test two priority targets – the Edna Trend and the Custer vein – The program will facilitate underground acc

  13. Slide 13: Drill Intercepts in the Edna

    The Winston Project DRILL INTERCEPTS IN THE EDNA There are numerous historic drill intercepts in the Edna Trend that is around 200 feet wide and cuts across the stock for over 1000 feet. Some drill holes encoun- tered up to 6 separate veins. 14 13

  14. Slide 14: Drill Intercepts in the Vein Parallel to the Custer Vein

    The Winston Project DRILL INTERCEPTS IN THE VEIN PARALLEL TO THE CUSTER VEIN 14

  15. Slide 15: Expansion Potential

    The Winston Project EXPANSION POTENTIAL We believe the Custer vein This opens the potential for a The historic development of may continue to depth for at new resource that could the #1 and #2 Winze down to least another 500 ft (150 measure 2,400 ft laterally, the 300 level indicates the metres) ver

  16. Slide 16: Drill Intercepts at Winston Project

    The Winston Project DRILL INTERCEPTS at at Winston Winston Project Project Selection of Historic Drill Intercepts HOLE DEPTH (ft) FROM (ft) TO (ft) INTERVAL (ft) GOLD (opt) GOLD (g/t) BW-48 85 80 85 5 0.86 29.4 C-171-C 400 213 222 9 0.38 13 CW-14 100 15 35 20 1.63 55.8 EX 11B 300 285 290 5 0.61 20.9

  17. Slide 17: The Gold Ridge Project

    Gold Ridge Property THE GOLD RIDGE PROJECT Located near Willcox, Arizona, 90 miles east of Tucson. Established mining region with with excellent access and infra- structure. The Gold Prince mine produced 22,000 ounces of gold from mul- tiple gold veins with grades aver- aging 0.344 ounces gold per t

  18. Slide 18: Claim Map & Ownership

    Gold Ridge Property CLAIM MAP & OWNERSHIP In exchange for a 100% interest in the Gold Ridge property subject to under- lying royalties (highlighted below), WGM will provide the following: 1. A Cash Payment of US$175,000 2. 27,250,000 common shares of WGM at a deemed value of CDN$0.15 per share distr

  19. Slide 19: A Historic Opportunity

    Gold Ridge Property A HISTORIC OPPORTUNITY Uncovered Three mines lie within the project Most of the development work boundaries: Gold Prince, Gold focused on the Gold Prince mine Ridge and Dives, with an estimated which has five developed levels. 5,862 ft of underground develop- ment work. 19

  20. Slide 20: Expansion Potential

    Gold Ridge Property EXPANSION POTENTIAL Based on previous work, considerable Gold-bearing veins are exposed on potential exists to discover new, mine- the roof and floor of the 6-Level, the able mineralization, both below the lowest level developed and mined, current 6-Level of the Gold Prince mine i

  21. Slide 21: The Path to Success

    Gold Ridge Property THE PATH TO SUCCESS Advancement Plan for the Gold Ridge Project Long section showing underground development in Gold Prince Mine Set up underground Acquire necessary per- drill stations on Level 6 mits to commence test of the Gold Prince Mine. mining at a rate of 150 tons per day

  22. Slide 22: Favourable Features at Gold Prince

    Gold Ridge Property FAVOURABLE FEATURES at Gold Prince NO METALLURGY ENVIRONMENTAL LIABILITIES PERMITTING Two separate metallurgical stud- Permitting requirements for A Phase I Environmental Site ies were performed on mineraliza- development and operation are Assessment was conducted of the tion tak

  23. Slide 23: Gold Ridge Geology

    Gold Ridge Property GOLD RIDGE GEOLOGY The high-grade gold-bearing vein system at the Gold Prince mine is part of a three-mile vein swarm that includes both barren and mineralized veins. The productive veins in the Gold Prince Mine par- allel the regionally dominant Apachi Pass Fault zone and are lo

  24. Slide 24: An Un-Common Goal

    AN UN-COMMON GOAL Be on pace to produce over 50,000oz per year as quickly as possible Spend less than $10,000,000 Acquire growth Drill and explore for blue sky “A gold company focused on cash-flow” N GOLD M TO I S NI WI N NG WGM Wh g in 24 re e K g ra d e is

  25. Slide 25: At a Glance

    AT A GLANCE A summary of Historic Mining Data Winston Project, Montana Gold Ridge Project, Arizona Custer and Edna Mines Gold Prince Comments Total Historic Gold Production 100,000 ounces* 22,023 ounces *Historic Estimate: Includes other producers in the Winston District Total Tons of Ore Mined 150,

  26. Slide 26: Share Structure

    SHARE STRUCTURE 79,536,018 2,300,000 2,666,083 Shares Outstanding at $0.20 expire Aug 24 2021 at $0.10 expire Mar.23 2021 Options Warrants 873,853 1,000,000 85,542 151 at $0.15 expire Sept.23 2018 at $0.20 expire July 26, 2018 Fully diluted Warrants Warrants N GOLD M TO I S NI WI N NG WGM Wh g in 26

  27. Slide 27: Head Office

    HEAD OFFICE TO N GOL D M I Winston Gold Mining Corp. S NI WI N NG WGM 201-919 Notre Dame Ave. W g in h re e K g ra d e is Winnipeg, MB R3E 0M8 Tel: 204.989.2434 CSE - WGC OTC - WGMCF CONTACTS Murray Nye, CEO murray@winstongold.com Mobile: 204.792.3211

  28. Slide 28: Qualified Persons

    QUALIFIED PERSONS The technical results contained in this presentation have been reviewed by Dr. Criss Capps PhD. P.Geol., an independent consultant to AGM. Dr. Capps is a Qualified Person as defined in National Instrument 43-101, and has reviewed and approved the contents of this Power Point Presenta

Winston Gold Mining — Investor Presentation (November 2016) on 6ix