  1. Slide 1: Obuasi Surface

    OBUASI SURFACE MARCH 2025 NYSE │ JSE │GSE MINING TO EMPOWER PEOPLE AND ADVANCE SOCIETIES

  2. Slide 2: Investor Note | Disclaimer

    INVESTOR NOTE │ DISCLAIMER Certain statements contained in this document, other than statements of historical fact, including, without limitation, those concerning the economic outlook for the gold mining industry, expectations regarding gold prices, production, total cash costs, all-in sustaining c

  3. Slide 3: Processing

    PROCESSING

  4. Slide 4: Processing | Process Flow

    PROCESSING | PROCESS FLOW OBUASI SITE VISIT 2025 4

  5. Slide 5: Processing | Improvements

    PROCESSING | IMPROVEMENTS PROJECT IMPACT Installation, density and air supply optimization of first flash cell Improved flotation mass pull from 0.8% to 2.14% Installation and optimization of Vertimill (Regrind mill) Improved BIOX feed grind (5%) and sulphur oxidation (8%) ILR electrowinning cells r

  6. Slide 6: Processing | Performance Trends (2020 – 2024)

    PROCESSING | PERFORMANCE TRENDS (2020 – 2024) Milled Throughput • Phase 1 - 2000 tpd • Phase 2 - 4,000 tpd Flotation Mass Pull & Recovery • Improvement after installation of first flash cell BIOX Oxidation • Improved after commissioning of flash cell and VTM CIL Recovery Decreased with lower CIL fee

  7. Slide 7: Processing | Future Plant Work (LOM Projects)

    PROCESSING | FUTURE PLANT WORK (LOM PROJECTS) Improve Overall Plant Recovery • ILR Solid Tails Treatment • Flash flotation concentrate accounting (mass measurement and auto-sampling) Recovery Improvement • 2nd ILR installation (projected increase in gravity gold content of mill feed) • KC throughput

  8. Slide 8: Environment

    ENVIRONMENT Pompora TSF

  9. Slide 9: Environment | Overview of TSFs

    ENVIRONMENT | OVERVIEW OF TSFs Permits for Operations of Tailings and Water Infrastructure at Obuasi mine ► issued on May 6, 2021 The site has four tailings storage facilities Active Inactive TSF BIOX TSF Pompora Kokoteasua • Obuasi processing plant produces two separate tailings streams namely: • F

  10. Slide 10: Environment | Tailings Management

    ENVIRONMENT | TAILINGS MANAGEMENT South TSF - Active BIOX TSF - Active South Tailings Storage Facility (STSF) • Ring dyke impoundment located c.4km to northwest processing plant • Total land take - 215 hectares • Ongoing deposition for closure • Expected to be decommissioned 2030 BIOX TSF • Develope

  11. Slide 11: Environment | Water Management

    ENVIRONMENT | WATER MANAGEMENT Water management Obuasi Mine Water Treatment Plants for Operational and remains a key activity of Domestic use include the following; the Obuasi mine. • Four Wastewater Treatment Plants • South Process Plant (SPP) Wastewater Pre-Treatment Plant; • South Wastewater Trea

  12. Slide 12: Environment | Reclamation

    ENVIRONMENT | RECLAMATION Liability Estimates Movement (BP23) $M 200 191.55 189.70 2.40 3.90 0.30 0.00 0.65 150 100 50 Closure Plan Summary 0 Dec-22 Escalation Rehab Method Demolished Others Dec-23 • Operations Commenced - 2019 Changes • Life of Mine: 2052 (28 years) • Life of Asset: 2067 i.e. to re

  13. Slide 13: Social

    SOCIAL

  14. Slide 14: Obuasi Socio-Political Landscape

    SOCIAL | OBUASI SOCIO-POLITICAL LANDSCAPE Obuasi Mine Concession • 141 km² lease (previously 201 km²) • Five municipalities/districts • Ashanti King, 2 Paramountcy’s, 4 Divisional Stools • 62 host communities • 200,000+ population • AngloGold Ashanti Ghana the largest employer in the Ashanti region

  15. Slide 15: Relinquished Assets

    SOCIAL | RELINQUISHED ASSETS North and South Mine Infrastructure Legend • Obuasi mine initiated the footprint reduction strategy in 2016 □ North Mine footprint □ South Mine footprint □ South mine TSF Foorprint • Some mine assets became redundant which necessitated relinquishment to the Government, i

  16. Slide 16: Challenges and Mitigation Measures

    SOCIAL | CHALLENGES AND MITIGATION MEASURES No. Challenge Mitigation Measures  Concession monitoring  ASM Livelihood Programme 1 Encroachment by illegal miners  Sensitization on negative impact of illegal mining  Local employment  Stakeholder engagement, including government agencies  Capacity

  17. Slide 17: 10-Year Socio-Economic Development Plan (SEDP)

    SOCIAL | 10-YEAR SOCIO-ECONOMIC DEVELOPMENT PLAN (SEDP) Intensive engagement was undertaken with local and national stakeholders in developing a multi-year socio-economic development plan to improve long-term resilience of host communities through investment in infrastructure, education, healthcare

  18. Slide 18: SEDP - Improved Social Development

    SOCIAL | SEDP- IMPROVED SOCIAL DEVELOPMENT Medical Outreach Programmes Improved School Facilities Community Water Systems Health Facilities Roads Book Donations OBUASI SITE VISIT 2025 18

  19. Slide 19: SEDP - Diversified and Sustained Local Economy

    SOCIAL | SEDP- DIVERSIFIED AND SUSTAINED LOCAL ECONOMY Artist's rendering of future project Obuasi Business Park Business Exposure Tour Apprenticeship Training Sustainable Palm Oil Farming SME Training Maize Cultivation OBUASI SITE VISIT 2025 19

  20. Slide 20: SEDP Provides Improved Cross Sector Partnership

    SOCIAL | SEDP PROVIDES IMPROVED CROSS SECTOR PARTNERSHIP Partnership with Partnership with NGO Solidaridad for Absa Partnership for SME Development Otumfuo Foundation implementation of Climate Resilient Palm Oil c.$ 370,000 loan disbursed to 16 SME’s for Basic Education 90,000 palm seedlings distrib

  21. Slide 21: Prioritising Improvement of Local Content

    SOCIAL | PRIORITISING IMPROVEMENT OF LOCAL CONTENT Current employees as at Dec 2024 Local content spend 2018 – 2024 – Obuasi Total – 5,441 Employees Total spend - $2,274m 1% 12% 22% 43% 45% 77% Host Communities Nationals Expat Local Local Multinational Foreign OBUASI SITE VISIT 2025 21

  22. Slide 22: Economic Benefits to Stakeholders

    SOCIAL | ECONOMIC BENEFITS TO STAKEHOLDERS • Salaries and wages: $58.3m • Direct taxes (incl. royalties): $31.8m • Indirect taxes: $29.4m OBUASI SITE VISIT 2025 22

  23. Slide 23: Obuasi Community Trust Fund

    SOCIAL | OBUASI COMMUNITY TRUST FUND • Launched in 2012 to support long-term sustainable development of stakeholder communities • Obuasi mine contributes $2/oz produced into the Fund • Focus areas of Trust Fund include education, health, water and sanitation; affordable housing and livelihood empowe

  24. Slide 24: AGA Health Foundation (AGAHF) Hospital

    SOCIAL | AGA HEALTH FOUNDATION (AGAHF) HOSPITAL • With a bed capacity of 150, this is one of the largest referral Hospitals in the Ashanti Region; 395,000 patient visits annually (350,000 are outpatients) • Accounts for 60% of all outpatient visits in the Obuasi East District, with estimated populat

  25. Slide 25: AGA Malaria Control Programme (AGAMal) - Established 2005

    SOCIAL | AGA MALARIA CONTROL PROGRAMME (AGAMal) - ESTABLISHED 2005 This is a world-class example of a long-term public-private health partnership that has weathered all operational challenges to bring life- changing benefits to millions of people over the past two decades • AGAMal currently has a pa

  26. Slide 26: AGA Schools and KNUST Obuasi University Campus

    SOCIAL | AGA SCHOOLS AND KNUST OBUASI UNIVERSITY CAMPUS • AngloGold Ashanti Schools established 1961 • Donated renovated North Mine properties to Kwame Nkrumah University of Science & Technology for satellite campus in 2019 • Best-performing BECE* School in Ashanti Region since 2019 • 2,575 students

  27. Slide 27: Artisanal Small Scale Mining Strategy

    SOCIAL | ARTISANAL SMALL SCALE MINING STRATEGY • Proposed project to improve local livelihoods by transforming ASM in Obuasi into a sustainable sector in formerly relinquished parts of concession • Initial consultations with Minerals Commission and Solidaridad has established their alignment with th

  28. Slide 28: Community Investment Spend

    SOCIAL | COMMUNITY INVESTMENT SPEND OBUASI – TOTAL COMMUNITY INVESTMENT SPEND FROM 2019-2024 -- $11.4M OBUASI COMMUNITY INVESTMENT SPEND ($m) 3.50 3.00 2.88 2.91 2.50 2.30 2.00 1.55 1.50 1.14 1.00 0.61 0.50 - 2019 2020 2021 2022 2023 2024 OBUASI SITE VISIT 2025 28

  29. Slide 29: Investor Relations Contacts

    w w w. a n g l o g o l d a s h a n t i . c o m ANDREA MAXEY YATISH CHOWTHEE INVESTOR RELATIONS Telephone: +61 08 9435 4603 Telephone: +27 11 637 6273 General e-mail enquiries Mobile: +61 400 072 199 Mobile: +27 78 364 2080 amaxey@anglogoldashanti.com yrchowthee@anglogoldashanti.com Investors@anglogo