TerraCom Limited · ASX:TER

TerraCom — Guildford Coal — Investor Presentation (May 2012)

23 slides from TerraCom's investor presentation, May 16, 2012

  1. Slide 1: Investor Presentation

    Slide 1: Investor Presentation

    Investor Presentation 16 May 2012

  2. Slide 2: Cautionary Statement

    Slide 2: Cautionary Statement

    2 CAUTIONARY STATEMENT The information contained in this document (Presentation) has been prepared by Guildford Coal Limited (Company). This presentation does not constitute an offer or invitation to any person to subscribe for or apply for any securities in the Company. While the information contai

  3. Slide 3: Agenda

    Slide 3: Agenda

    3 AGENDA Corporate Mongolia Queensland Moving forward to become the next independent ASX listed coal miner

  4. Slide 4: Corporate Snapshot

    Slide 4: Corporate Snapshot

    4 CORPORATE SNAPSHOT ASX Code: GUF Capital Structure Share Price Chart Listed on ASX 22 July 2010 Shares on Issue 476.8 million Share Price $0.67 (10/5/12) Market Cap A$319.5 million Options on Issue Nil Cash (30 April 2012) A$25 million Enterprise Value A$294.5 million

  5. Slide 5: Coal Sector – GUF Coverage and Comparables

    Slide 5: Coal Sector – GUF Coverage and Comparables

    5 COAL SECTOR – GUF Coverage and Comparables Broker GUF Target Price Date issued Recommendation (NPV) Fosters $2.20 March 2012 BUY Patersons $1.50 May 2012 BUY UBS $1.30 March 2012 BUY 8.00 CKA 7.00 CLR MTE 6.00 NCR SMR 5.00 EOC 4.00 GUF 3.00 2.00 1.00 - Jul-10 Sep-10 Nov-10 Jan-11 Mar-11 May-11 Jul

  6. Slide 6: Guildford Coal Highlights

    Slide 6: Guildford Coal Highlights

    6 GUILDFORD COAL HIGHLIGHTS • Large coal mineral resources totaling 2.172Bt* • Exploration upside with further Exploration Target# of 0.975Bt to 8.893Bt across managed projects • Access to rail and port through existing infrastructure • Sufficient funds to commence mining in South Gobi • One of the

  7. Slide 7: Mongolian Project Update

    Slide 7: Mongolian Project Update

    7 MONGOLIAN PROJECT UPDATE Overview South Gobi Middle Gobi

  8. Slide 8: Mongolian Snapshot

    Slide 8: Mongolian Snapshot

    8 MONGOLIAN SNAPSHOT Summary of Portfolio • South Gobi Project and Middle Gobi Project South Gobi Project: • South Gobi Project is the priority project which covers large open cut coking coal prospects • Consisting of 1 mining licence, 1 pre-mining agreement and 3 exploration licence’s • Adjacent to

  9. Slide 9: Mongolian Project Location Map

    Slide 9: Mongolian Project Location Map

    9 MONGOLIAN PROJECT LOCATION MAP

  10. Slide 10: Mongolian South Gobi Update

    Slide 10: Mongolian South Gobi Update

    10 MONGOLIAN SOUTH GOBI UPDATE • Scoping Study confirms project economics • Final stages of contractor selection and mining fleet mobilisation • 10 international parties bidding for offtake • Targeting coal production mid 2012 • Considerable potential to significantly increase JORC resources

  11. Slide 11: South Gobi Project

    Slide 11: South Gobi Project

    11 SOUTH GOBI PROJECT North Pit 70.4Mt JORC Resource 14Mt to 73Mt Exploration Target# Central Pit 56Mt to 279Mt Exploration Target# East Pit 56Mt to 241Mt Exploration Target# West Pit 0 to 300Mt Exploration Target#

  12. Slide 12: South Gobi

    Slide 12: South Gobi

    12 SOUTH GOBI North Pit Indicative Quality Seams Total Sulphur Moisture % AD Ash % AD Volatile % AD FSI Combined % Mean 1, 2, 4 0.6 14.3 23.7 8.5 0.23 Minimum 1, 2, 4 0.3 7.1 20.8 6.7 0.08 Maximum 1, 2, 4 1.5 24.1 28.5 9.0 0.43 Mean 3,5 0.4 19.3 18.2 2.8 0.28 Minimum 3,5 0.3 11.1 16.1 1.5 0.14 Maxim

  13. Slide 13: Mid Gobi Project

    Slide 13: Mid Gobi Project

    13 MID GOBI PROJECT • Planning to expand JORC resource on the thermal coal deposit in 2012 • Evaluation of Fluorite mineralisation discovered outcropping on tenement Location of JORC Resource LOCATION of FLUORITE MINERALISATION LOCATION of 221.4 Mt JORC COAL RESOURCE AND EXPLORATION TARGET# OF 165Mt

  14. Slide 14: Mid Gobi Project Fluorite Evaluation

    Slide 14: Mid Gobi Project Fluorite Evaluation

    14 MID GOBI PROJECT Fluorite Evaluation • Outcropping Fluorite mapped • Quality of grab samples of outcropping material showed potential for a high grade Fluorite deposit MAGNETIC FEATURE • Magnetic survey identified a feature that corresponds with surface mapping SAMPLE LOCATION • Commenced evaluat

  15. Slide 15: Queensland Project Update

    Slide 15: Queensland Project Update

    15 Queensland Project Update Overview Project Update

  16. Slide 16: Queensland Snapshot

    Slide 16: Queensland Snapshot

    16 QUEENSLAND SNAPSHOT Summary of Portfolio: Estimated 20,000km2 of exploration tenement located across Queensland’s major coal bearing basins including: Guildford • Bowen Queensland • Galilee Projects • Maryborough Target Coal Products: • Hard Coking • Thermal • PCI Priority Projects: • Hughenden I

  17. Slide 17: Queensland Project Location Map

    Slide 17: Queensland Project Location Map

    17 QUEENSLAND PROJECT LOCATION MAP

  18. Slide 18: Queensland Project Update Key Goals for 2012

    Slide 18: Queensland Project Update Key Goals for 2012

    18 QUEENSLAND PROJECT UPDATE Key Goals for 2012 • Complete the feasibility on the Hughenden Coal Project transport (ARG/QR) and shipping solution (Port of Townsville) and progress to binding contracts • Upgrade and increase the JORC compliant underground resource on Hughenden Thermal Start Up Projec

  19. Slide 19: Board of Directors

    Slide 19: Board of Directors

    19 BOARD OF DIRECTORS Honourable Peter Lindsay Independent Chairman Peter served as a member of the Australian Liberal Party for more then 15 years. Peter was first elected to the Townsville City Council in 1985 and served five terms undefeated. In 1996 he was elected to the Australian Parliament an

  20. Slide 20: Board of Directors (continued)

    Slide 20: Board of Directors (continued)

    20 BOARD OF DIRECTORS (continued) Tony Bellas Non – Executive Director Mr Bellas is an experienced company director who currently serves as Chairman of CTM Travel Limited and Non-Executive Director of ERM Power Limited and Australian Water (Qld) Pty Ltd. As well, Mr Bellas has served as a Non-Execut

  21. Slide 21: Mineral Resource Summary

    Slide 21: Mineral Resource Summary

    21 MINERAL RESOURCE SUMMARY JORC Resources Exploration Target# Potential Coal Independent Guildford Coal (Mt) (Mt) Type Geologist Measured Indicated Inferred Total Lower Upper Hughenden* 1,619 1,619 285 2,830 Thermal MDM Pentland% 295 2,890 Thermal MDM White Mountain@ 262 262 40 815 Thermal MDM/Pala

  22. Slide 22: Contact

    Slide 22: Contact

    Contact David Broomhead - Investor Relations PH 07 3005 1539

  23. Slide 23: Competent Persons Statement

    Slide 23: Competent Persons Statement

    23 Competent Persons Statement # Exploration Target References to Exploration Targets in this document are in accordance with the guidelines of the JORC Code (2004). As such it is important to note that in relation to reported Exploration Targets any references to quality and quantity are conceptual

Source: Internet Archive copy of terracomresources.com

More decks from TerraCom Limited

All 42 TerraCom decks