Turquoise Hill Resources — Investor Presentation (July 2017)
26 slides from Turquoise Hill Resources's investor presentation, July 2017
Slide 1: Oyu Tolgoi: Advancing value, creating options
Investor Presentation July 2017 Oyu Tolgoi: Advancing value, creating options
Slide 2: Forward-looking statements
Forward-looking statements 2 This presentation includes certain “forward-looking information” within the meaning of applicable Canadian securities legislation and “forward-looking statements” within the meaning of the “safe harbour” provisions of the United States Private Securities Litigation Refor
Slide 3: Turquoise Hill's investment thesis
Turquoise Hill’s investment thesis 3 1. Oyu Tolgoi expected to be world’s third-largest copper mine 2. Significant cash flow expected from underground development 3. Hugo North Lift 1 financing in place1 4. Turquoise Hill should benefit from expected drop in copper supply (~2020) 5. Oyu Tolgoi’s res
Slide 4: Oyu Tolgoi's expected production growth
Oyu Tolgoi’s expected production growth 4 Copper ('000 tonnes) Gold ('000 ounces) Expected copper production growth 2017 – 2025: +320% 669 +450% 622 612 Expected gold production growth 2017 – 2025: 583 522 521 475 450 397 369 Source: 2016 Oyu Tolgoi Technical Report 256 264 221 175 156 156 149 145 1
Slide 5: Long-term copper fundamentals strong
Long-term copper fundamentals strong 5 Copper mine supply/demand outlook Copper market likely to enter a temporary deficit in 2017. Base Highly Probable Primary Demand Average copper price 30 Forecast 4.00 Ongoing attrition at existing mines driven by declining 25 grade Copper mine supply/demand
Slide 6: First quartile producer
First quartile producer 6 C/lb, 2016$ Normal C1 + Sustaining CAPEX 400 (Oyu Tolgoi’s costs and volumes for 2025 – 2030) Q1 Q2 Q3 Q4 300 Oyu Tolgoi Other Mines 200 100 0 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 Cumulative production (‘000 tonnes) -100 Source: Wood Mackenzie (Q4’16
Slide 7: Underground development
Underground development Photo: Jumbo working on main access lateral development off of Shaft 1.
Slide 8: 2016 Resources Case: ~3.4 billion tonnes
2016 Resources Case: ~3.4 billion tonnes 8 Oyut Open Pit ~900Mt (reserve) 0.44% copper; 0.28 g/t gold Hugo South ~300Mt (resource) Heruga 1.07% copper ~700Mt (resource) 0.06 g/t gold 0.42% copper 0.43 g/t gold; >100Mlb moly Hugo North Lift 1, panels 0,1,2 ~500Mt (reserve) 1.66% copper; 0.35 g/t gold
Slide 9: Alternative production cases
Alternative production cases 9 Resources 120 Case • ~Year 20, concentrator capacity ~120mtpa • NPV8% $8.8 billion1 • Expansion capex ~$14.9 billion3 Resources 100 Case • ~Year 20, concentrator capacity ~100mtpa • NPV8% $8.9 billion1 • Expansion capex ~$13.5 billion3 Resources 50 Case • Assumes conce
Slide 10: Underground mining sequence
Underground mining sequence 10 Panel 0 Panel 2 Panel 1 Initial production South North Average grade 2.5% cu Initial underground production begins with Panel 0 Highest copper grades occur during ramp up exceeding 2.5% in several years 2024-2026: Oyu Tolgoi peak copper production during period e
Slide 11: Underground development status
Underground development status 11 2,600 equivalent metres completed (January 2016 – end Q1’17) Increased metres expected in 2H’17 with larger crusher Lateral development Additional third crew expected to start mid-2017 Fourth and fifth crews expected to start training mid-2017 Approximatel
Slide 12: Complete ramp-up expected by 2027
Complete ramp-up expected by 2027 12 Sustainable underground production Complete convey-to-surface Project First draw Complete concentrator Complete re-start bell firing upgrade ramp-up 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Expansion capital Pre-start Sustaining capital Ex
Slide 13: Sources and uses of development capital
Sources and uses of development capital 13 Uses of development capital (2016 – 2022) Uses Amount ($B) Note Underground development $5.3 Includes concentrator upgrade Debt service $3.3 Debt repayment, interest and financing fees Total $8.6 Sources of development capital (2016 – 2022) Sources Amount (
Slide 14: Open-pit operations
Open-pit operations Photo: Oyu Tolgoi’s open-pit mine.
Slide 15: Production highlights
Production highlights 15 All Injury Frequency Rate Concentrator throughput (per 200,000 hours worked) ('000 tonnes) 0.47 38,152 0.43 34,537 0.33 27,872 20,317 0.22 2013 2014 2015 2016 2013 2014 2015 2016 Industry-leading safety performance Multiple productivity initiatives have led to improved throu
Slide 16: Financial highlights
Financial highlights 16 Cash position Operating cash flow ($'000,000) ($'000,000) $1,418 $1,344 $719 $651 $863 $399 Cu:$3.10 Cu:$2.49 Cu:$2.21 Au:$1,266 Au:$1,160 Au:$1,251 2014 2015 2016 2014 2015 2016 Strong cash position Consecutive periods of positive operating cash flow *Source: Average quarter
Slide 17: Production and financial guidance
Production and financial guidance 17 2016 2017 Copper in concentrates 201,300 tonnes (actual) 130,000 – 160,000 tonnes 175,000 – 195,000 tonnes Gold in concentrates ~300,000 ounces (actual) 100,000 – 140,000 ounces 255,000 – 285,000 ounces Operating cash costs $775 million (actual) $720 million $840
Slide 18: Reserves case concentrator performance
Reserves case concentrator performance 18 Annual concentrator throughput (million tonnes) Cu % grade Au g/t Copper grade Gold grade 45 2.00 40.0 39.7 40.0 40.1 40.0 40.0 40 39.2 38.2 37.9 37.1 34.5 35.1 35 1.50 30 27.9 25 1.00 20.3 20 15 0.50 10 5 0 0.00 2013a 2014a 2015a 2016a 2017e 2018e 2019e 202
Slide 19: Managing near-term ore grade challenges
Managing near-term ore grade challenges 19 Open-pit plan view Phase 7 Phases 6 and 4a as well as Phase 6 low-grade stockpile ore processed in 2017 Phase 10 Phase 5 Phase 8 Phase 4 stripping provides access to higher ore grades in 2018 Phase 4A Phase 9 Phase 4B Source: 2016 Oyu Tolgoi Technical R
Slide 20: Oyu Tolgoi – a long-term growth opportunity
Oyu Tolgoi – a long-term growth opportunity 20 Advancing underground development Creating long-term development options Demonstrated productivity and cost improvements Best copper asset in development
Slide 21: Appendix
Appendix
Slide 22: Oyu Tolgoi at China's doorstep
Oyu Tolgoi at China’s doorstep 22
Slide 23: Hugo North Lift 1 production schedule
Hugo North Lift 1 production schedule 23 Figure: 2016 Oyu Tolgoi Technical Report, OreWin, 2016.
Slide 24: Project finance flow of funds
Project finance flow of funds 24 At March 31, 20171 At project finance drawdown Payable to Turquoise Hill* Receivable from Oyu Tolgoi* Proceeds: $4.3 billion2 $4.3 billion3 $4.2 billion Shareholder loan: $3.0 billion Shareholder loan: $3.0 billion Payable to Turquoise Hill* Receivable from Oyu Tolgo
Slide 25: Underground elements
Underground elements 25 Ground Support Undercut APEX To Drill Drilling Blasting 28m 28m 17m UNDERCUT 17m EXTRACTION 28m Extraction Ore Handling Drawbell Ore Steel Set Pass Drawpoint Extraction Drift Vent IDZ Raise 10 m Drawbell blast 12 m
Slide 26: turquoisehill.com
turquoisehill.com Turquoise Hill Resources Ltd. Suite 354 - 200 Granville Street Vancouver, BC, Canada V6C 1S4 TRQ: TSX, NYSE & NASDAQ Turquoise Hill is an international mining company focused on the operation and development of the Oyu Tolgoi copper-gold mine in southern Mongolia.